nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian model of cycle time prediction
|
Chen, Christina Y.J. |
|
2001 |
|
10 |
p. 921-930 |
artikel |
2 |
A Bayesian Model of Cycle Time Prediction
|
Christina Y.J. Chen |
|
2001 |
|
10 |
p. 921-930 10 p. |
artikel |
3 |
A Bayesian Model of Cycle Time Prediction
|
Chen, Christina Y.J. |
|
2001 |
|
10 |
p. 921-930 |
artikel |
4 |
A change point model for the location parameter of exponential family densities
|
Perry, Marcus B. |
|
2008 |
|
10 |
p. 947-956 |
artikel |
5 |
Adaptive CUSUM procedures with EWMA-based shift estimators
|
Jiang, Wei |
|
2008 |
|
10 |
p. 992-1003 |
artikel |
6 |
A design methodology for fractal layout organization
|
Venkatadri, Uday |
|
1997 |
|
10 |
p. 911-924 |
artikel |
7 |
A design methodology for fractal layout organization
|
UDAY VENKATADRI |
|
1997 |
|
10 |
p. 911-924 14 p. |
artikel |
8 |
A design methodology for fractal layout organization
|
VENKATADRI , UDAY |
|
1997 |
|
10 |
p. 911-924 |
artikel |
9 |
A Flexible Simulation Tool for Manufacturing-cell Design
|
Maria De Los A. Irizarry |
|
2001 |
|
10 |
p. 827-836 10 p. |
artikel |
10 |
A Flexible Simulation Tool for Manufacturing-cell Design
|
Maria De Los A. Irizarry |
|
2001 |
|
10 |
p. 837-846 10 p. |
artikel |
11 |
A Flexible Simulation Tool for Manufacturing-cell Design
|
Irizarry, Maria De Los A. |
|
2001 |
|
10 |
p. 837-846 |
artikel |
12 |
A Flexible Simulation Tool for Manufacturing-cell Design
|
Irizarry, Maria De Los A. |
|
2001 |
|
10 |
p. 827-836 |
artikel |
13 |
A flexible simulation tool for manufacturing-cell design, II: response surface analysis and case study
|
Irizarry, Maria De Los A. |
|
2001 |
|
10 |
p. 837-846 |
artikel |
14 |
A flexible simulation tool for manufacturing-cell design, I: model structure, operation, and case study
|
Irizarry, Maria De Los A. |
|
2001 |
|
10 |
p. 827-836 |
artikel |
15 |
Agile manufacturing research: accomplishments and opportunities
|
DeVOR, RICHARD |
|
1997 |
|
10 |
p. 813-823 |
artikel |
16 |
Agile manufacturing research: accomplishments and opportunities
|
RICHARD DeVOR |
|
1997 |
|
10 |
p. 813-823 11 p. |
artikel |
17 |
Agile manufacturing research: accomplishments and opportunities
|
DeVOR , RICHARD |
|
1997 |
|
10 |
p. 813-823 |
artikel |
18 |
Agile workforce evaluation: a framework for cross-training and coordination
|
Hopp, Wallace J. |
|
2004 |
|
10 |
p. 919-940 |
artikel |
19 |
A model for warehouse layout
|
Roodbergen, Kees Jan |
|
2006 |
|
10 |
p. 799-811 |
artikel |
20 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
Feng, Shaw C. |
|
1998 |
|
10 |
p. 893-903 |
artikel |
21 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
SHAW C. FENG |
|
1998 |
|
10 |
p. 893-903 11 p. |
artikel |
22 |
A modular architecture for rapid development of CAPP systems for agile manufacturing
|
Feng, Shaw C. |
|
1998 |
|
10 |
p. 893-903 |
artikel |
23 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
Joneja, Ajay |
|
1998 |
|
10 |
p. 923-931 |
artikel |
24 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
AJAY JONEJA |
|
1998 |
|
10 |
p. 923-931 9 p. |
artikel |
25 |
A modular, parametric vibratory feeder: a case study for flexible assembly tools for mass customization
|
Joneja, Ajay |
|
1998 |
|
10 |
p. 923-931 |
artikel |
26 |
An agile manufacturing workcell design
|
Quinn, Roger D. |
|
1997 |
|
10 |
p. 901-909 |
artikel |
27 |
An agile manufacturing workcell design
|
ROGER D. QUINN |
|
1997 |
|
10 |
p. 901-909 9 p. |
artikel |
28 |
An agile manufacturing workcell design
|
QUINN , ROGER D. |
|
1997 |
|
10 |
p. 901-909 |
artikel |
29 |
Analysis of dispatching rules of AGV systems with multiple vehicles
|
Yamashita, Hideaki |
|
2001 |
|
10 |
p. 889-895 |
artikel |
30 |
Analysis of Dispatching Rules of AGV Systems with Multiple Vehicles
|
Hideaki Yamashita |
|
2001 |
|
10 |
p. 889-895 7 p. |
artikel |
31 |
Analysis of Dispatching Rules of AGV Systems with Multiple Vehicles
|
Yamashita, Hideaki |
|
2001 |
|
10 |
p. 889-895 |
artikel |
32 |
Analysis of workflow protocol adaptability in TestLAN production systems
|
Williams, N. P. |
|
2003 |
|
10 |
p. 965-972 |
artikel |
33 |
An easily implementable hierarchical heuristic for a two-echelon spare parts distribution system
|
Hopp, Wallace J. |
|
1999 |
|
10 |
p. 977-988 |
artikel |
34 |
An easily implementable hierarchical heuristicfor a two-echelon spare parts distribution system
|
WALLACE J. HOPP |
|
1999 |
|
10 |
p. 977-988 12 p. |
artikel |
35 |
An easily implementable hierarchical heuristicfor a two-echelon spare parts distribution system
|
Hopp, Wallace J. |
|
1999 |
|
10 |
p. 977-988 |
artikel |
36 |
An effective methodology for the stochastic project compression problem
|
Mitchell, Gary |
|
2007 |
|
10 |
p. 957-969 |
artikel |
37 |
Approximate mean waiting time in a GI/D/1 queue with autocorrelated times to failures
|
Balciog˜lu, Baris |
|
2007 |
|
10 |
p. 985-996 |
artikel |
38 |
Arc crossing minimization in graphs with GRASP
|
Marti, Rafael |
|
2001 |
|
10 |
p. 913-919 |
artikel |
39 |
Arc Crossing Minimization in Graphs with GRASP
|
Rafael Martí |
|
2001 |
|
10 |
p. 913-919 7 p. |
artikel |
40 |
Arc Crossing Minimization in Graphs with GRASP
|
Martí, Rafael |
|
2001 |
|
10 |
p. 913-919 |
artikel |
41 |
A space partitioning method for facility layout problems with shape constraints
|
Kim, Jae-Gon |
|
1998 |
|
10 |
p. 947-957 |
artikel |
42 |
A space partitioning method for facility layout problemswith shape constraints
|
JAE-GON KIM |
|
1998 |
|
10 |
p. 947-957 11 p. |
artikel |
43 |
A space partitioning method for facility layout problemswith shape constraints
|
Kim, Jae-Gon |
|
1998 |
|
10 |
p. 947-957 |
artikel |
44 |
A stochastic programming approach to manufacturing flow control
|
Haurie, A. |
|
2000 |
|
10 |
p. 907-919 |
artikel |
45 |
A stochastic programming approach to manufacturing flow control
|
A. Haurie |
|
2000 |
|
10 |
p. 907-919 13 p. |
artikel |
46 |
A stochastic programming approach to manufacturing flow control
|
Haurie, A. |
|
2000 |
|
10 |
p. 907-919 |
artikel |
47 |
Auction-theoretic coordination of production planning in the supply chain
|
Ertogral, Kadir |
|
2000 |
|
10 |
p. 931-940 |
artikel |
48 |
Auction-theoretic coordination of production planning in the supply chain
|
Kadir Ertogral |
|
2000 |
|
10 |
p. 931-940 10 p. |
artikel |
49 |
Auction-theoretic coordination of production planning in the supply chain
|
Ertogral, Kadir |
|
2000 |
|
10 |
p. 931-940 |
artikel |
50 |
Automated retrieval and ranking of similar parts in agile manufacturing
|
Iyer, Shekhar |
|
1997 |
|
10 |
p. 859-876 |
artikel |
51 |
Automated retrieval and ranking of similar parts in agile manufacturing
|
SHEKHAR IYER |
|
1997 |
|
10 |
p. 859-876 18 p. |
artikel |
52 |
Automated retrieval and ranking of similar parts in agile manufacturing
|
IYER , SHEKHAR |
|
1997 |
|
10 |
p. 859-876 |
artikel |
53 |
Autonomous agents architectures and algorithms in flexible manufacturing systems
|
Adacher, Ludovica |
|
2000 |
|
10 |
p. 941-951 |
artikel |
54 |
Autonomous agents architectures and algorithms in flexible manufacturing systems
|
Ludovica Adacher |
|
2000 |
|
10 |
p. 941-951 11 p. |
artikel |
55 |
Autonomous agents architectures and algorithms in flexible manufacturing systems
|
Adacher, Ludovica |
|
2000 |
|
10 |
p. 941-951 |
artikel |
56 |
A very large scale neighborhood search algorithm for the q-mode problem
|
Kulkarni, Girish |
|
2007 |
|
10 |
p. 971-984 |
artikel |
57 |
Blank design optimization on deep drawing of square shells
|
Gea, Hae Chang |
|
1998 |
|
10 |
p. 913-921 |
artikel |
58 |
Blank design optimization on deep drawing of square shells
|
HAE CHANG GEA |
|
1998 |
|
10 |
p. 913-921 9 p. |
artikel |
59 |
Blank design optimization on deep drawing of square shells
|
Gea, Hae Chang |
|
1998 |
|
10 |
p. 913-921 |
artikel |
60 |
Buffer capacity allocation for a desired throughput in production lines
|
Yamashita, Hideaki |
|
1998 |
|
10 |
p. 883-891 |
artikel |
61 |
Buffer capacity allocation for a desired throughput in production lines
|
HIDEAKI YAMASHITA |
|
1998 |
|
10 |
p. 883-892 10 p. |
artikel |
62 |
Buffer capacity allocation for a desired throughput in production lines
|
Yamashita, Hideaki |
|
1998 |
|
10 |
p. 883-892 |
artikel |
63 |
Chained cross-training of workers for robust performance
|
Jordan, William C. |
|
2004 |
|
10 |
p. 953-967 |
artikel |
64 |
Choosing the appropriate capacity for a make-to-forecast production environment using a Markov analysis approach
|
Akinc, Umit |
|
2006 |
|
10 |
p. 847-858 |
artikel |
65 |
Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
|
Brandimarte, Paolo |
|
2000 |
|
10 |
p. 921-929 |
artikel |
66 |
Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
|
Paolo Brandimarte |
|
2000 |
|
10 |
p. 921-929 9 p. |
artikel |
67 |
Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
|
Brandimarte, Paolo |
|
2000 |
|
10 |
p. 921-929 |
artikel |
68 |
Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution
|
Liu, Jiyin |
|
2002 |
|
10 |
p. 905-914 |
artikel |
69 |
Cyclic scheduling of a single hoist in extended electroplating lines a comprehensive integer programming solution
|
Jiyin Liu |
|
2002 |
|
10 |
p. 905-914 10 p. |
artikel |
70 |
Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution
|
Liu, Jiyin |
|
2002 |
|
10 |
p. 905-914 |
artikel |
71 |
Design and implementation of a virtual information system for agile manufacturing
|
Song, Liugen |
|
1997 |
|
10 |
p. 839-857 |
artikel |
72 |
Design and implementation of a virtual information system for agile manufacturing
|
LIUGEN SONG |
|
1997 |
|
10 |
p. 839-857 19 p. |
artikel |
73 |
Design and implementation of a virtual information system for agile manufacturing
|
SONG , LIUGEN |
|
1997 |
|
10 |
p. 839-857 |
artikel |
74 |
Design and operation of manufacturing systems: the control-point policy
|
Gershwin, Stanley B. |
|
2000 |
|
10 |
p. 891-906 |
artikel |
75 |
Design and operation of manufacturing systems: the control-point policy
|
Stanley B. Gershwin |
|
2000 |
|
10 |
p. 891-906 16 p. |
artikel |
76 |
Design and operation of manufacturing systems: the control-point policy
|
Gershwin, Stanley B. |
|
2000 |
|
10 |
p. 891-906 |
artikel |
77 |
Destructive disassembly to support virtual prototyping
|
Lee, Kyonghun |
|
1998 |
|
10 |
p. 959-972 |
artikel |
78 |
Destructive disassembly to support virtual prototyping
|
KYONGHUN LEE |
|
1998 |
|
10 |
p. 959-972 14 p. |
artikel |
79 |
Destructive disassembly to support virtual prototyping
|
Lee, Kyonghun |
|
1998 |
|
10 |
p. 959-972 |
artikel |
80 |
Development and evaluation of cross-training policies for manufacturing teams
|
Bokhorst, Jos A. C. |
|
2004 |
|
10 |
p. 969-984 |
artikel |
81 |
Development and pilot testing for virtual manufacturing tools with intelligent attributes
|
Kesavadas, T. |
|
2003 |
|
10 |
p. 933-940 |
artikel |
82 |
Discrete deterministic and stochastic blending problems with two quality characteristics: aluminum blending
|
Blanchard-Gaillard, Denis |
|
1999 |
|
10 |
p. 1001-1009 |
artikel |
83 |
Discrete deterministic and stochastic blending problems with two quality characteristics: aluminum blending
|
DENIS BLANCHARD-GAILLARD |
|
1999 |
|
10 |
p. 1001-1009 9 p. |
artikel |
84 |
Discrete deterministic and stochastic blending problems with two quality characteristics: aluminum blending
|
Blanchard-Gaillard, Denis |
|
1999 |
|
10 |
p. 1001-1009 |
artikel |
85 |
Due date assignment using feedback control with reinforcement learning
|
Moses, Scott A. |
|
1999 |
|
10 |
p. 989-999 |
artikel |
86 |
Due date assignment using feedback control with reinforcement learning
|
Scott A. Moses |
|
1999 |
|
10 |
p. 989-999 11 p. |
artikel |
87 |
Due date assignment using feedback control with reinforcement learning
|
Moses, Scott A. |
|
1999 |
|
10 |
p. 989-999 |
artikel |
88 |
Dynamic routing and the performance of automated manufacturing cells
|
Boucher, Thomas O. |
|
2000 |
|
10 |
p. 975-988 |
artikel |
89 |
Dynamic routing and the performance of automated manufacturing cells
|
Thomas O. Boucher |
|
2000 |
|
10 |
p. 975-988 14 p. |
artikel |
90 |
Dynamic routing and the performance of automated manufacturing cells
|
Boucher, Thomas O. |
|
2000 |
|
10 |
p. 975-988 |
artikel |
91 |
Editorial
|
Chao, Xiuli |
|
2005 |
|
10 |
p. 891-892 |
artikel |
92 |
Editor's Note
|
Askin, Ronald G. |
|
1997 |
|
10 |
p. 1 |
artikel |
93 |
Estimating job waiting times in production systems with cross-trained setup crews
|
Kula, Ufuk |
|
2004 |
|
10 |
p. 999-1010 |
artikel |
94 |
Exact and approximate algorithms for part-machine clustering based on a relationship between interval graphs and Robinson matrices
|
Brusco, Michael J. |
|
2007 |
|
10 |
p. 925-935 |
artikel |
95 |
Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
|
Gel, Esma S. |
|
2002 |
|
10 |
p. 847-863 |
artikel |
96 |
Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
|
Esma S. Gel |
|
2002 |
|
10 |
p. 847-863 17 p. |
artikel |
97 |
Factors affecting opportunity of worksharing as a dynamic line balancing mechanism
|
Gel, Esma S. |
|
2002 |
|
10 |
p. 847-863 |
artikel |
98 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 1. Correctness and scalability
|
Lawley, Mark |
|
1997 |
|
10 |
p. 877-887 |
artikel |
99 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 1. Correctness and scalability
|
MARK LAWLEY |
|
1997 |
|
10 |
p. 877-887 11 p. |
artikel |
100 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 1. Correctness and scalability
|
LAWLEY , MARK |
|
1997 |
|
10 |
p. 877-887 |
artikel |
101 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 2. Generalization, optimization, and efficiency
|
Lawley, Mark |
|
1997 |
|
10 |
p. 889-899 |
artikel |
102 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 2. Generalization, optimization, and efficiency
|
MARK LAWLEY |
|
1997 |
|
10 |
p. 889-899 11 p. |
artikel |
103 |
Flexible manufacturing system structural control and the Neighborhood Policy, part 2. Generalization, optimization, and efficiency
|
LAWLEY , MARK |
|
1997 |
|
10 |
p. 889-899 |
artikel |
104 |
Gaussian process method for form error assessment using coordinate measurements
|
(Heidi) Xia, Haifeng |
|
2008 |
|
10 |
p. 931-946 |
artikel |
105 |
Generation of optimal parting direction based on undercut features in injection molded parts
|
Fu, M.W. |
|
1999 |
|
10 |
p. 947-955 |
artikel |
106 |
Generation of optimal parting direction based on undercut features in injection molded parts
|
M.W. FU |
|
1999 |
|
10 |
p. 947-955 9 p. |
artikel |
107 |
Generation of optimal parting direction based on undercut features in injection molded parts
|
Fu, M.W. |
|
1999 |
|
10 |
p. 947-955 |
artikel |
108 |
Geometric abstractions to support disassembly analysis
|
Shyamsundar, N. |
|
1999 |
|
10 |
p. 935-946 |
artikel |
109 |
Geometric abstractions to support disassembly analysis
|
N. SHYAMSUNDAR |
|
1999 |
|
10 |
p. 935-946 12 p. |
artikel |
110 |
Geometric abstractions to support disassembly analysis
|
Shyamsundar, N. |
|
1999 |
|
10 |
p. 935-946 |
artikel |
111 |
Greedy tool heuristic approach to rough milling of complex shaped pockets
|
Joneja, Ajay |
|
2003 |
|
10 |
p. 953-963 |
artikel |
112 |
Incorporating physical demand criteria into assembly line balancing
|
Carnahan, Brian J. |
|
2001 |
|
10 |
p. 875-887 |
artikel |
113 |
Incorporating Physical Demand Criteria into Assembly Line Balancing
|
Brian J. Carnahan |
|
2001 |
|
10 |
p. 875-887 13 p. |
artikel |
114 |
Incorporating Physical Demand Criteria into Assembly Line Balancing
|
Carnahan, Brian J. |
|
2001 |
|
10 |
p. 875-887 |
artikel |
115 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufacture of precision machined components
|
Geddam, A. |
|
1998 |
|
10 |
p. 905-912 |
artikel |
116 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufactureof precision machined components
|
A. GEDDAM |
|
1998 |
|
10 |
p. 905-912 8 p. |
artikel |
117 |
Interlinking dimensional tolerances with geometric accuracy and surface finish in the process design and manufactureof precision machined components
|
Geddam, A. |
|
1998 |
|
10 |
p. 905-912 |
artikel |
118 |
Introduction
|
Hopp, Wallace |
|
2004 |
|
10 |
p. 915-917 |
artikel |
119 |
Methodologies for rapid and effective response to requests for quotation (RFQs)
|
Veeramani, Dharmaraj |
|
1997 |
|
10 |
p. 825-838 |
artikel |
120 |
Methodologies for rapid and effective response to requests for quotation (RFQs)
|
DHARMARAJ VEERAMANI |
|
1997 |
|
10 |
p. 825-838 14 p. |
artikel |
121 |
Methodologies for rapid and effective response to requests for quotation (RFQs)
|
VEERAMANI , DHARMARAJ |
|
1997 |
|
10 |
p. 825-838 |
artikel |
122 |
Minimax analysis for finite-horizon inventory models
|
Gallego, Guillermo |
|
2001 |
|
10 |
p. 861-874 |
artikel |
123 |
Minimax Analysis for Finite-horizon Inventory Models
|
Guillermo Gallego |
|
2001 |
|
10 |
p. 861-874 14 p. |
artikel |
124 |
Minimax Analysis for Finite-horizon Inventory Models
|
Gallego, Guillermo |
|
2001 |
|
10 |
p. 861-874 |
artikel |
125 |
MIP approach to balancing transfer lines with blocks of parallel operations
|
Dolgui, Alexandre |
|
2006 |
|
10 |
p. 869-882 |
artikel |
126 |
Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing
|
Xiaobo, Zhao |
|
1999 |
|
10 |
p. 957-963 |
artikel |
127 |
Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing
|
ZHAO XIAOBO |
|
1999 |
|
10 |
p. 957-963 7 p. |
artikel |
128 |
Modeling for flexible manufacturing systems with an FMS blocking mechanism and a BDSM job routing
|
Xiaobo, Zhao |
|
1999 |
|
10 |
p. 957-963 |
artikel |
129 |
Multiple fault signature integration and enhancing for variation source identification in manufacturing processes
|
Zeng, Li |
|
2008 |
|
10 |
p. 919-930 |
artikel |
130 |
Multi-shuttle automated storage/retrieval systems
|
Meller, Russell D. |
|
1997 |
|
10 |
p. 925-938 |
artikel |
131 |
Multi-shuttle automated storage/retrieval systems
|
RUSSELL D. MELLER |
|
1997 |
|
10 |
p. 925-938 14 p. |
artikel |
132 |
Multi-shuttle automated storage/retrieval systems
|
MELLER , RUSSELL D. |
|
1997 |
|
10 |
p. 925-938 |
artikel |
133 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
Rhee, Young |
|
1998 |
|
10 |
p. 973-979 |
artikel |
134 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
YOUNG RHEE |
|
1998 |
|
10 |
p. 973-979 7 p. |
artikel |
135 |
On the mean waiting time of a population constrained open tandem queueing network with constant service times
|
Rhee, Young |
|
1998 |
|
10 |
p. 973-979 |
artikel |
136 |
On the uncertainties of decentralized controllers in a transfer production line
|
Ben-Gal, Irad |
|
2000 |
|
10 |
p. 953-961 |
artikel |
137 |
On the uncertainties of decentralized controllers in a transfer production line
|
Irad Ben-Gal |
|
2000 |
|
10 |
p. 953-961 9 p. |
artikel |
138 |
On the uncertainties of decentralized controllers in a transfer production line
|
Ben-Gal, Irad |
|
2000 |
|
10 |
p. 953-961 |
artikel |
139 |
Optimal axis orientation for rectilinear minisum and minimax location
|
Drezner, Zvi |
|
1998 |
|
10 |
p. 981-986 |
artikel |
140 |
Optimal axis orientation for rectilinear minisum and minimax location
|
ZVI DREZNER |
|
1998 |
|
10 |
p. 981-986 6 p. |
artikel |
141 |
Optimal axis orientation for rectilinear minisum and minimax location
|
Drezner, Zvi |
|
1998 |
|
10 |
p. 981-986 |
artikel |
142 |
Optimal design for flexible manufacturing systems: generalized analytical methods
|
Lee, Heungsoon Felix |
|
1999 |
|
10 |
p. 965-976 |
artikel |
143 |
Optimal design for flexible manufacturing systems: generalized analytical methods
|
HEUNGSOON FELIX LEE |
|
1999 |
|
10 |
p. 965-976 12 p. |
artikel |
144 |
Optimal design for flexible manufacturing systems: generalized analytical methods
|
Lee, Heungsoon Felix |
|
1999 |
|
10 |
p. 965-976 |
artikel |
145 |
Optimal design of stochastic production lines: a dynamic programming approach
|
Donohue, Karen L. |
|
2002 |
|
10 |
p. 891-903 |
artikel |
146 |
Optimal design of stochastic production lines a dynamic programming approach
|
Karen L. Donohue |
|
2002 |
|
10 |
p. 891-903 13 p. |
artikel |
147 |
Optimal design of stochastic production lines: a dynamic programming approach
|
Donohue, Karen L. |
|
2002 |
|
10 |
p. 891-903 |
artikel |
148 |
Optimal dwell point policies for automated storage/retrieval systems with dedicated storage
|
Park, Byung Chun |
|
1999 |
|
10 |
p. 1011-1113 |
artikel |
149 |
Optimal dwell point policies for automated storage/retrieval systems with dedicated storage
|
BYUNG CHUN PARK |
|
1999 |
|
10 |
p. 1011-1013 3 p. |
artikel |
150 |
Optimal dwell point policies for automated storage/retrieval systems with dedicated storage
|
Park, Byung Chun |
|
1999 |
|
10 |
p. 1011-1013 |
artikel |
151 |
Optimal price and pro rata decisions for combined warranty policies with different repair options
|
Matis, Timothy I. |
|
2008 |
|
10 |
p. 984-991 |
artikel |
152 |
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
|
Gharbi, Ali |
|
2003 |
|
10 |
p. 941-952 |
artikel |
153 |
Optimal resource assignment through negotiation in a multi-agent manufacturing system
|
Arbib, Claudio |
|
2000 |
|
10 |
p. 963-974 |
artikel |
154 |
Optimal resource assignment through negotiation in a multi-agent manufacturing system
|
Claudio Arbib |
|
2000 |
|
10 |
p. 963-974 12 p. |
artikel |
155 |
Optimal resource assignment through negotiation in a multi-agent manufacturing system
|
Arbib, Claudio |
|
2000 |
|
10 |
p. 963-974 |
artikel |
156 |
Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots
|
Chen, Dong |
|
2003 |
|
10 |
p. 973-985 |
artikel |
157 |
Optimizing aircraft routings in response to groundings and delays
|
Bard, Jonathan F. |
|
2001 |
|
10 |
p. 931-947 |
artikel |
158 |
Optimizing Aircraft Routings in response to Groundings and Delays
|
Jonathan F. Bard |
|
2001 |
|
10 |
p. 931-947 17 p. |
artikel |
159 |
Optimizing Aircraft Routings in response to Groundings and Delays
|
Bard, Jonathan F. |
|
2001 |
|
10 |
p. 931-947 |
artikel |
160 |
Partial least square-based model predictive control for large-scale manufacturing processes
|
Song, Kyuchul |
|
2002 |
|
10 |
p. 881-890 |
artikel |
161 |
Partial least squarebased model predictive control for largescale manufacturing processes
|
Kyuchul Song |
|
2002 |
|
10 |
p. 881-890 10 p. |
artikel |
162 |
Partial least square-based model predictive control for large-scale manufacturing processes
|
Song, Kyuchul |
|
2002 |
|
10 |
p. 881-890 |
artikel |
163 |
Planning repair effort in transfer lines
|
Dogan-Sahiner, Esra |
|
1998 |
|
10 |
p. 867-881 |
artikel |
164 |
Planning repair effort in transfer lines
|
ESRA DOGAN-SAHINER |
|
1998 |
|
10 |
p. 867-882 16 p. |
artikel |
165 |
Planning repair effort in transfer lines
|
Dogan-Sahiner, Esra |
|
1998 |
|
10 |
p. 867-882 |
artikel |
166 |
Product family-based assembly sequence design methodology
|
Gupta, Saurabh |
|
1998 |
|
10 |
p. 933-945 |
artikel |
167 |
Product family-based assembly sequence design methodology
|
SAURABH GUPTA |
|
1998 |
|
10 |
p. 933-945 13 p. |
artikel |
168 |
Product family-based assembly sequence design methodology
|
Gupta, Saurabh |
|
1998 |
|
10 |
p. 933-945 |
artikel |
169 |
Quantitative analysis of a transfer production line with Andon
|
Li, Jingshan |
|
2006 |
|
10 |
p. 837-846 |
artikel |
170 |
Review of:“Modeling Techniques for Business Process Re-engineering and Benchmarking”Guy Doumeingts and Jim Browne (eds) Chapman & Hall, 1997
|
Jackman, John |
|
1998 |
|
10 |
p. 987-988 |
artikel |
171 |
Review of:“Rapid Analysis of Queuing Systems (RAQS)”Developed by: Professor Manjunath Kamath, Oklahoma
|
Heragu, Sunderesh S. |
|
1998 |
|
10 |
p. 989 |
artikel |
172 |
Review of:“Re-engineering for Sustainable Industrial Production”L.M. Camarinha-Matos (ed.) Chapman & Hall, 1997
|
Woo, T.C. |
|
1998 |
|
10 |
p. 987 |
artikel |
173 |
Robot arc welding task sequencing using genetic algorithms
|
Kim, Kyoung-Yun |
|
2002 |
|
10 |
p. 865-880 |
artikel |
174 |
Robot arc welding task sequencing using genetic algorithms
|
KyoungYun Kim |
|
2002 |
|
10 |
p. 865-880 16 p. |
artikel |
175 |
Robot arc welding task sequencing using genetic algorithms
|
Kim, Kyoung-Yun |
|
2002 |
|
10 |
p. 865-880 |
artikel |
176 |
Robust eco-design: A new application for air quality engineering
|
Ben-Gal, Irad |
|
2008 |
|
10 |
p. 907-918 |
artikel |
177 |
Salesforce design with experience-based learning
|
Misra, Sanjog |
|
2004 |
|
10 |
p. 941-952 |
artikel |
178 |
Selecting the best sheet length for the steel stock used in circular blank production
|
Cui, Yaodong |
|
2006 |
|
10 |
p. 829-836 |
artikel |
179 |
Sequencing, scheduling and tooling single-stage multifunctional machines in a small batch environment
|
Sinriech, David |
|
2001 |
|
10 |
p. 897-911 |
artikel |
180 |
Sequencing, Scheduling and Tooling Single-Stage Multifunctional Machines in a Small Batch Environment
|
David Sinriech |
|
2001 |
|
10 |
p. 897-911 15 p. |
artikel |
181 |
Sequencing, Scheduling and Tooling Single-Stage Multifunctional Machines in a Small Batch Environment
|
Sinriech, David |
|
2001 |
|
10 |
p. 897-911 |
artikel |
182 |
Sequencing with limited flexibility
|
Lahmar, Maher |
|
2007 |
|
10 |
p. 937-955 |
artikel |
183 |
Spare parts management for technical systems: resupply of spare parts under limited budgets
|
Rustenburg, W.D. |
|
2000 |
|
10 |
p. 1013-1026 |
artikel |
184 |
Spare parts management for technical systems: resupply of spare parts under limited budgets
|
W.D. Rustenburg |
|
2000 |
|
10 |
p. 1013-1026 14 p. |
artikel |
185 |
Spare parts management for technical systems: resupply of spare parts under limited budgets
|
Rustenburg, W.D. |
|
2000 |
|
10 |
p. 1013-1026 |
artikel |
186 |
Staff scheduling in high volume service facilities with downgrading
|
Bard, Jonathan F. |
|
2004 |
|
10 |
p. 985-997 |
artikel |
187 |
State dependent pricing with a queue
|
Chen, Hong |
|
2001 |
|
10 |
p. 847-860 |
artikel |
188 |
State Dependent Pricing with a Queue
|
Hong Chen |
|
2001 |
|
10 |
p. 847-860 14 p. |
artikel |
189 |
State Dependent Pricing with a Queue
|
Chen, Hong |
|
2001 |
|
10 |
p. 847-860 |
artikel |
190 |
Statistical monitoring of multi-stage processes based on engineering models
|
Xiang, Liming |
|
2008 |
|
10 |
p. 957-970 |
artikel |
191 |
The components of complexity in engineering design
|
El-Haik, Basem |
|
1999 |
|
10 |
p. 925-934 |
artikel |
192 |
The components of complexity in engineering design
|
BASEM EL-HAIK |
|
1999 |
|
10 |
p. 925-934 10 p. |
artikel |
193 |
The components of complexity in engineering design
|
El-Haik, Basem |
|
1999 |
|
10 |
p. 925-934 |
artikel |
194 |
The effects of pick density on order picking areas with narrow aisles
|
Gue, Kevin R. |
|
2006 |
|
10 |
p. 859-868 |
artikel |
195 |
The extended kanban control system for production coordination of assembly manufacturing systems
|
Chaouiya, Claudine |
|
2000 |
|
10 |
p. 999-1012 |
artikel |
196 |
The extended kanban control system for production coordination of assembly manufacturing systems
|
Claudine Chaouiya |
|
2000 |
|
10 |
p. 999-1012 14 p. |
artikel |
197 |
The extended kanban control system for production coordination of assembly manufacturing systems
|
Chaouiya, Claudine |
|
2000 |
|
10 |
p. 999-1012 |
artikel |
198 |
Throughput bounds for miniload automated storage/retrieval systems
|
Foley, Robert D. |
|
2002 |
|
10 |
p. 915-920 |
artikel |
199 |
Throughput bounds for miniload automated storageretrieval systems
|
Robert D. Foley |
|
2002 |
|
10 |
p. 915-920 6 p. |
artikel |
200 |
Throughput bounds for miniload automated storage/retrieval systems
|
Foley, Robert D. |
|
2002 |
|
10 |
p. 915-920 |
artikel |
201 |
Transient analysis of maintenance intervention of continuous multi-unit systems
|
Okogbaa, O. Geoffrey |
|
2008 |
|
10 |
p. 971-983 |
artikel |
202 |
Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
|
Raaymakers, Wenny H.M. |
|
2000 |
|
10 |
p. 989-998 |
artikel |
203 |
Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
|
Wenny H.M. Raaymakers |
|
2000 |
|
10 |
p. 989-998 10 p. |
artikel |
204 |
Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
|
Raaymakers, Wenny H.M. |
|
2000 |
|
10 |
p. 989-998 |
artikel |
205 |
Workforce agility through employee involvement
|
Sumukadas, Narendar |
|
2004 |
|
10 |
p. 1011-1021 |
artikel |