nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A class of constraint qualifications in nonsmooth optimization
|
Tian, G. |
|
1999 |
87 |
0 |
p. 383-391 |
artikel |
2 |
A comparison of unconstrained and constrained OLS for the combination ofdemand forecasts: A case study of the ordering and stocking of bank printed forms
|
Chan, C.K. |
|
1999 |
87 |
0 |
p. 129-140 |
artikel |
3 |
A decomposition approximation for assembly‐disassembly queueing networkswith finite buffer and blocking
|
Asadathorn, N. |
|
1999 |
87 |
0 |
p. 247-261 |
artikel |
4 |
A discrete‐time model for perishable inventory systems
|
Lian, Z. |
|
1999 |
87 |
0 |
p. 103-116 |
artikel |
5 |
A forecasting method for manpower requirement and related optimal decisions
|
Guo, Y. |
|
1999 |
87 |
0 |
p. 191-198 |
artikel |
6 |
A generalized projection quasi‐Newton method for nonlinear optimization problems
|
Lai, Y. |
|
1999 |
87 |
0 |
p. 353-362 |
artikel |
7 |
A multi‐class cyclic arrival queue with a single server
|
Zhang, H. |
|
1999 |
87 |
0 |
p. 333-350 |
artikel |
8 |
An econometric analysis of development dynamics in modern Chinese industry
|
Hammer, A.B. |
|
1999 |
87 |
0 |
p. 153-164 |
artikel |
9 |
A review and interpretations of process capability indices
|
Palmer, K. |
|
1999 |
87 |
0 |
p. 31-47 |
artikel |
10 |
A unified limited column generation approach for facility location problems ontrees
|
Shaw, D.X. |
|
1999 |
87 |
0 |
p. 363-382 |
artikel |
11 |
Basic adjoint relation for transient and stationary analysis of some Markovprocesses
|
Chen, H. |
|
1999 |
87 |
0 |
p. 273-303 |
artikel |
12 |
Busy periods of two‐stage tandem service systems and their algorithmic implementation
|
Yuan, X.-M. |
|
1999 |
87 |
0 |
p. 319-332 |
artikel |
13 |
Decision modelling of diversified project selection
|
Lai, K.K. |
|
1999 |
87 |
0 |
p. 199-212 |
artikel |
14 |
Estimating the performance of Sino‐Hong Kong joint ventures using neuralnetwork ensembles
|
Hu, M.Y. |
|
1999 |
87 |
0 |
p. 213-232 |
artikel |
15 |
Estimation of the most likely equilibrium traffic queueing pattern in a capacityconstrained network
|
Yang, H. |
|
1999 |
87 |
0 |
p. 73-85 |
artikel |
16 |
Fuzzy criterion models for inventory systems with partial backorders
|
Liu, B. |
|
1999 |
87 |
0 |
p. 117-126 |
artikel |
17 |
Impact of dynamic decision making on hub‐and‐spoke freight transportationnetworks
|
Cheung, R.K. |
|
1999 |
87 |
0 |
p. 49-71 |
artikel |
18 |
Logical analysis of Chinese labor productivity patterns
|
Hammer, A.B. |
|
1999 |
87 |
0 |
p. 165-176 |
artikel |
19 |
Measuring the timing ability of mutual fund managers
|
Yan, Y. |
|
1999 |
87 |
0 |
p. 233-234 |
artikel |
20 |
Modeling Shanghai stock market volatility
|
Xu, J. |
|
1999 |
87 |
0 |
p. 141-152 |
artikel |
21 |
Modelling and forecasting the money demand in China: Cointegration and non‐linearanalysis
|
Deng, S. |
|
1999 |
87 |
0 |
p. 177-189 |
artikel |
22 |
On performance potentials and conditional Monte Carlo for gradient estimationfor Markov chains
|
Cao, X.-R. |
|
1999 |
87 |
0 |
p. 263-272 |
artikel |
23 |
On quadratic convergence of the $$O\left( {\sqrt {nL} } \right)$$-iteration homogeneous and self‐duallinear programming algorithm
|
Wu, F. |
|
1999 |
87 |
0 |
p. 393-406 |
artikel |
24 |
Optimal pacing in an assembly-based multi-stage production system
|
Liu, J.J. |
|
1999 |
87 |
0 |
p. 87-101 |
artikel |
25 |
Preface
|
Liu, Liming |
|
1999 |
87 |
0 |
p. 0 |
artikel |
26 |
Revisiting the state transition frequency formula
|
Shi, D. |
|
1999 |
87 |
0 |
p. 305-317 |
artikel |
27 |
Sequential quality control in batch manufacturing
|
Yao, D.D. |
|
1999 |
87 |
0 |
p. 3-30 |
artikel |
28 |
Trust region dogleg path algorithms for unconstrained minimization
|
Zhang, J.-Z. |
|
1999 |
87 |
0 |
p. 407-418 |
artikel |