nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A greedy open shop heuristic with job priorities
|
Strusevich, V.A. |
|
1998 |
83 |
0 |
p. 253-270 |
artikel |
2 |
Batch scheduling with deadlines on parallel machines
|
Brucker, Peter |
|
1998 |
83 |
0 |
p. 23-40 |
artikel |
3 |
Branch and bound algorithms for single-machinescheduling with batch set-up times to minimizetotal weighted completion time
|
Crauwels, H.A.J. |
|
1998 |
83 |
0 |
p. 59-76 |
artikel |
4 |
Decomposition in single-machine scheduling
|
Szwarc, Wlodzimierz |
|
1998 |
83 |
0 |
p. 271-287 |
artikel |
5 |
Genetic algorithm for the permutation flow-shopscheduling problem with linear models of operations
|
Janiak, Adam |
|
1998 |
83 |
0 |
p. 95-114 |
artikel |
6 |
Heuristic procedures for parallel-machine schedulingproblems with stochastic precedence constraints
|
Neumann, Klaus |
|
1998 |
83 |
0 |
p. 115-136 |
artikel |
7 |
Jackson's Pseudo Preemptive Schedule for the Pm/ri, qi/Cmax scheduling problem
|
Carlier, J. |
|
1998 |
83 |
0 |
p. 41-58 |
artikel |
8 |
Nonstrict vector summationin multi-operation scheduling
|
Sevastianov, Sergey |
|
1998 |
83 |
0 |
p. 179-212 |
artikel |
9 |
On the boolean-quadric packinguncapacitated facility-location polytope
|
Hardin, Jill |
|
1998 |
83 |
0 |
p. 77-94 |
artikel |
10 |
On the calculation of the stability radiusof an optimal or an approximate schedule
|
Sotskov, Yuri N. |
|
1998 |
83 |
0 |
p. 213-252 |
artikel |
11 |
On the solution region for certainscheduling problems with preemption
|
Bräsel, Heidemarie |
|
1998 |
83 |
0 |
p. 1-22 |
artikel |
12 |
Parallel branch-and-bound methods for thejob-shop scheduling problem
|
Perregaard, Michael |
|
1998 |
83 |
0 |
p. 137-160 |
artikel |
13 |
Practical job shop scheduling
|
Schutten, J.M.J. |
|
1998 |
83 |
0 |
p. 161-178 |
artikel |
14 |
Preface
|
Bräsel, Heidemarie |
|
1998 |
83 |
0 |
p. 0 |
artikel |