nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Cost-efficient network synthesis from leased lines
|
Alevras, Dimitris |
|
1998 |
76 |
0 |
p. 1-20 |
artikel |
2 |
Design and operational issues in AGV-served manufacturing systems
|
Ganesharajah, Tharma |
|
1998 |
76 |
0 |
p. 109-154 |
artikel |
3 |
Frequency assignment in cellular phone networks
|
Borndörfer, R. |
|
1998 |
76 |
0 |
p. 73-93 |
artikel |
4 |
Job shop scheduling with group-dependent setups, finite buffers, and long time horizon
|
Luh, Peter B. |
|
1998 |
76 |
0 |
p. 233-259 |
artikel |
5 |
Matching problems in selective assembly operations
|
Coullard, C.R. |
|
1998 |
76 |
0 |
p. 95-107 |
artikel |
6 |
Mathematical models in airline schedule planning: A survey
|
Gopalan, Ram |
|
1998 |
76 |
0 |
p. 155-185 |
artikel |
7 |
Network configuration and machine layout in fixed-path material handling systems
|
Al-Sultan, Khaled S. |
|
1998 |
76 |
0 |
p. 21-54 |
artikel |
8 |
Part selection and tool allocation in discrete parts manufacturing
|
Iakovou, Eleftherios |
|
1998 |
76 |
0 |
p. 187-200 |
artikel |
9 |
Preface: Mathematics of Industrial Systems III
|
Burkard, Rainer E. |
|
1998 |
76 |
0 |
p. 0 |
artikel |
10 |
Robustness of single machine scheduling problems to earliness and tardiness penalty errors
|
James, R.J.W. |
|
1998 |
76 |
0 |
p. 219-232 |
artikel |
11 |
Routing helicopters for crew exchanges on off-shore locations
|
Sierksma, Gerard |
|
1998 |
76 |
0 |
p. 261-286 |
artikel |
12 |
Scheduling large robotic cells without buffers
|
Sriskandarajah, Chelliah |
|
1998 |
76 |
0 |
p. 287-321 |
artikel |
13 |
Solution methods for material requirement planning with lot-size dependent lead times
|
Jagannathan, Raj |
|
1998 |
76 |
0 |
p. 201-217 |
artikel |
14 |
Solution procedures for the dynamic facility layout problem
|
Urban, Timothy L. |
|
1998 |
76 |
0 |
p. 323-342 |
artikel |
15 |
Stowage planning for container ships to reduce the number of shifts
|
Avriel, Mordecai |
|
1998 |
76 |
0 |
p. 55-71 |
artikel |