An analysis of heuristics for the parallel-machine flexible-resource scheduling problem
|
Daniels, Richard L. |
|
1997 |
70 |
0 |
p. 439-472 |
artikel |
2 |
An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
|
Dauzère-Pérès, Stéphane |
|
1997 |
70 |
0 |
p. 281-306 |
artikel |
3 |
Applying constraint satisfaction techniques to job shop scheduling
|
Cheng, Cheng-Chung |
|
1997 |
70 |
0 |
p. 327-357 |
artikel |
4 |
A single machine scheduling problem with common due window and controllable processing times
|
Liman, Surya D. |
|
1997 |
70 |
0 |
p. 145-154 |
artikel |
5 |
Complexity of scheduling problems with multi-purpose machines
|
Brucker, Peter |
|
1997 |
70 |
0 |
p. 57-73 |
artikel |
6 |
Current trends in deterministic scheduling
|
Lee, Chung-Yee |
|
1997 |
70 |
0 |
p. 1-41 |
artikel |
7 |
Job shop scheduling with separable sequence-dependent setups
|
Choi, In-Chan |
|
1997 |
70 |
0 |
p. 155-170 |
artikel |
8 |
Local search heuristics for single machine scheduling with batch set-up times to minimize total weighted completion time
|
Crauwels, H.A.J. |
|
1997 |
70 |
0 |
p. 261-279 |
artikel |
9 |
Multi-objective stochastic scheduling of job ready times
|
Stanfield, Paul M. |
|
1997 |
70 |
0 |
p. 221-239 |
artikel |
10 |
No-wait flow shop scheduling with large lot sizes
|
Agnetis, Alessandro |
|
1997 |
70 |
0 |
p. 415-438 |
artikel |
11 |
On the design and development of object-oriented scheduling systems
|
Pinedo, Michael |
|
1997 |
70 |
0 |
p. 359-378 |
artikel |
12 |
Preemptive multiprocessor task scheduling with release times and time windows
|
Bianco, L. |
|
1997 |
70 |
0 |
p. 43-55 |
artikel |
13 |
Preemptive scheduling with finite capacity input buffers
|
Hall, Nicholas G. |
|
1997 |
70 |
0 |
p. 399-413 |
artikel |
14 |
Preface
|
Lee, Chung-Yee |
|
1997 |
70 |
0 |
p. 0 |
artikel |
15 |
Problem space search algorithms for resource-constrained project scheduling
|
Naphade, Kedar S. |
|
1997 |
70 |
0 |
p. 307-326 |
artikel |
16 |
Rescheduling on a single machine with part-type dependent setup times and deadlines
|
Tamer Unal, Ali |
|
1997 |
70 |
0 |
p. 93-113 |
artikel |
17 |
Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
|
Chand, Suresh |
|
1997 |
70 |
0 |
p. 115-125 |
artikel |
18 |
Scheduling permutation flow shops using the Lagrangian relaxation technique
|
Liu, Guandong |
|
1997 |
70 |
0 |
p. 171-189 |
artikel |
19 |
Sequencing jobs with random processing times to minimize weighted completion time variance
|
Cai, X. |
|
1997 |
70 |
0 |
p. 241-260 |
artikel |
20 |
Single machine hierarchical scheduling with customer orders and multiple job classes
|
Gupta, Jatinder N.D. |
|
1997 |
70 |
0 |
p. 127-143 |
artikel |
21 |
Single machine scheduling with batch set-up times to minimize maximum lateness
|
Hariri, A.M.A. |
|
1997 |
70 |
0 |
p. 75-92 |
artikel |
22 |
Sizing and scheduling a full-time and part-time workforce with off-day and off-weekend constraints
|
Emmons, Hamilton |
|
1997 |
70 |
0 |
p. 473-492 |
artikel |
23 |
Stochastic scheduling of a batch processing machine with incompatible job families
|
Duenyas, Izak |
|
1997 |
70 |
0 |
p. 191-220 |
artikel |
24 |
Using beam search techniques for sequencing mixed-model assembly lines
|
Leu, Yow-yuh |
|
1997 |
70 |
0 |
p. 379-397 |
artikel |