nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A dynamic programming algorithm for single machine scheduling with ready times
|
Gélinas, Sylvie |
|
1997 |
69 |
0 |
p. 135-156 |
artikel |
2 |
A mixed-integer model for solving ordering problems with side constraints
|
Maffioli, Francesco |
|
1997 |
69 |
0 |
p. 277-297 |
artikel |
3 |
A modeling approach to a JIT-based ordering system
|
Watanabe, Norio |
|
1997 |
69 |
0 |
p. 379-403 |
artikel |
4 |
A new single model and derived algorithms for the satellite shot planning problem using graph theory concepts
|
Gabrel, Virginie |
|
1997 |
69 |
0 |
p. 115-134 |
artikel |
5 |
A parametric approach for maximum flow problems with an additional reverse convex constraint
|
Kuno, Takahito |
|
1997 |
69 |
0 |
p. 261-276 |
artikel |
6 |
A variation of the generalized assignment problem arising in the New Zealand dairy industry
|
Foulds, L.R. |
|
1997 |
69 |
0 |
p. 105-114 |
artikel |
7 |
Concurrent operations assignment and sequencing for particular assembly problems in flow lines
|
Agnetis, Alessandro |
|
1997 |
69 |
0 |
p. 1-31 |
artikel |
8 |
Cost optimization for the slitting of core laminations for power transformers
|
Gerstl, A. |
|
1997 |
69 |
0 |
p. 157-169 |
artikel |
9 |
DGAP - The Dynamic Generalized Assignment Problem
|
Kogan, Konstantin |
|
1997 |
69 |
0 |
p. 227-239 |
artikel |
10 |
Hitting or avoiding balls in Euclidean space
|
Crama, Yves |
|
1997 |
69 |
0 |
p. 47-64 |
artikel |
11 |
Minimizing the number of robots to meet a given cyclic schedule
|
Kats, Vladimir |
|
1997 |
69 |
0 |
p. 209-226 |
artikel |
12 |
Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
|
Kubiak, Wieslaw |
|
1997 |
69 |
0 |
p. 241-259 |
artikel |
13 |
Optimization of nuclear reactor reloading patterns
|
de Klerk, E. |
|
1997 |
69 |
0 |
p. 65-84 |
artikel |
14 |
Preface
|
Burkard, Rainer |
|
1997 |
69 |
0 |
p. 0 |
artikel |
15 |
Queues with switchover - A review and critique
|
Rosa-Hatko, Wanda |
|
1997 |
69 |
0 |
p. 299-322 |
artikel |
16 |
Rolling horizon scheduling in a rolling-mill
|
Stauffer, L. |
|
1997 |
69 |
0 |
p. 323-349 |
artikel |
17 |
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
|
Gupta, J.N.D. |
|
1997 |
69 |
0 |
p. 171-191 |
artikel |
18 |
Shop scheduling problems under precedence constraints
|
Strusevich, V.A. |
|
1997 |
69 |
0 |
p. 351-377 |
artikel |
19 |
Skeleton-based facility layout design using genetic algorithms
|
Delmaire, Hugues |
|
1997 |
69 |
0 |
p. 85-104 |
artikel |
20 |
The aircraft rotation problem
|
Clarke, Lloyd |
|
1997 |
69 |
0 |
p. 33-46 |
artikel |
21 |
Vehicle scheduling on a tree with release and handling times
|
Karuno, Yoshiyuki |
|
1997 |
69 |
0 |
p. 193-207 |
artikel |