Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             18 results found
no title author magazine year volume issue page(s) type
1 A Column Generation Approach to Delivery Planning over Time with Inhomogeneous Service Providers and Service Interval Constraints N. Boland
2001
108 1 p. 143-156
14 p.
article
2 Airline Base Schedule Optimisation by Flight Network Annealing J.S. Mashford
2001
108 1 p. 293-313
21 p.
article
3 An Integrated Optimization Model for Train Crew Management A.T. Ernst
2001
108 1 p. 211-224
14 p.
article
4 An Operations Research Approach to the Problem of the Sugarcane Selection Vanja Calija
2001
108 1 p. 123-142
20 p.
article
5 An Optimization Based Approach to the Train Operator Scheduling Problem at Singapore MRT Kim-Lin Chew
2001
108 1 p. 111-122
12 p.
article
6 Cane Railway Scheduling via Constraint Logic Programming: Labelling Order and Constraints in a Real-Life Application Fae Martin
2001
108 1 p. 193-209
17 p.
article
7 Combining Constraint Programming and Linear Programming on an Example of Bus Driver Scheduling Amal de Silva
2001
108 1 p. 277-291
15 p.
article
8 Elastic Constraint Branching, the WedelinCarmen Lagrangian Heuristic and Integer Programming for Personnel Scheduling Andrew J. Mason
2001
108 1 p. 239-276
38 p.
article
9 How Airlines and Airports Recover from Schedule Perturbations: A Survey Jerzy A. Filar
2001
108 1 p. 315-333
19 p.
article
10 Minimised Geometric Buchberger Algorithm for Integer Programming Qiang Li
2001
108 1 p. 87-109
23 p.
article
11 Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty W.K. Yeung
2001
108 1 p. 33-54
22 p.
article
12 Mission Planning for Regional Surveillance Maria John
2001
108 1 p. 157-173
17 p.
article
13 One and Two Facility Network Design Revisited Trilochan Sastry
2001
108 1 p. 19-31
13 p.
article
14 Parallel Interior Point Schemes for Solving Multistage Convex Programming M. Hegland
2001
108 1 p. 75-85
11 p.
article
15 Preface 2001
108 1 p. 13-17
5 p.
article
16 Project Scheduling under Time Dependent Costs A Branch and Bound Algorithm N.R. Achuthan
2001
108 1 p. 55-74
20 p.
article
17 Supply Chain Optimisation in the Paper Industry Andrew Philpott
2001
108 1 p. 225-237
13 p.
article
18 Two Issues in Setting Call Centre Staffing Levels Bert P.K. Chen
2001
108 1 p. 175-192
18 p.
article
                             18 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands