Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             15 results found
no title author magazine year volume issue page(s) type
1 A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling Tormos, Pilar
2001
102 1-4 p. 65-81
article
2 A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks Ludwig, Arfst
2001
102 1-4 p. 49-64
article
3 Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling Lova, Antonio
2001
102 1-4 p. 263-286
article
4 An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem Vanhoucke, Mario
2001
102 1-4 p. 179-196
article
5 A Robust Genetic Algorithm for Resource Allocation in Project Scheduling Alcaraz, J.
2001
102 1-4 p. 83-109
article
6 A Two Stage Search Heuristic for Scheduling Payments in Projects Dayanand, Nalini
2001
102 1-4 p. 197-220
article
7 Criticality Analysis in Activity-on-Node Networks with Minimal Time Lags Valls, Vicente
2001
102 1-4 p. 17-37
article
8 Due Date-Based Metrics for Activity Importance in Stochastic Activity Networks Bowman, R.A.
2001
102 1-4 p. 39-48
article
9 Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows Ulusoy, Gündüz
2001
102 1-4 p. 237-261
article
10 Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds Kimms, A.
2001
102 1-4 p. 221-236
article
11 Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases Lee, Chung-Yee
2001
102 1-4 p. 287-307
article
12 Preface Ulusoy, Gündüz
2001
102 1-4 p. 13-16
article
13 Project Scheduling with Multiple Modes: A Genetic Algorithm Hartmann, Sönke
2001
102 1-4 p. 111-135
article
14 Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling Józefowska, Joanna
2001
102 1-4 p. 137-155
article
15 Uncertainty Modelling in Software Development Projects (With Case Study) Özdamar, Linet
2001
102 1-4 p. 157-178
article
                             15 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands