nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A MULTIAGENT BASED CONTROL SYSTEM FOR AN ASSEMBLY CELL
|
Barata, José |
|
2007 |
40 |
3 |
p. 116-121 6 p. |
artikel |
2 |
AN AGENT-BASED DISTURBANCE HANDLING ARCHITECTURE IN MANUFACTURING CONTROL
|
Leitão, Paulo |
|
2007 |
40 |
3 |
p. 50-55 6 p. |
artikel |
3 |
APPLICATION OF NEURAL NETWORKS TO CONDITION BASED MAINTENANCE: A CASE STUDY IN THE TEXTILE INDUSTRY
|
Ierace, Stefano |
|
2007 |
40 |
3 |
p. 147-152 6 p. |
artikel |
4 |
A ROBOTIC SYSTEM FOR PCBS INSPECTION BASED ON COMPUTER VISION AND MOBILE PROBES
|
Gómez, J. |
|
2007 |
40 |
3 |
p. 171-176 6 p. |
artikel |
5 |
ASSOCIATIVE SEARCH MODELS IN INDUSTRIAL SYSTEMS
|
Bachtadze, Natalya |
|
2007 |
40 |
3 |
p. 105-108 4 p. |
artikel |
6 |
AUTOMATIC GENERATION OF 3D MACHINING SURFACES WITH TOOL COMPENSATION FROM GRAYLEVEL IMAGE MODELS
|
Borangiu, Theodor |
|
2007 |
40 |
3 |
p. 30-35 6 p. |
artikel |
7 |
CAPACITY AND QUALITY CONTROL MODELLING OF MULTI-PRODUCT PRODUCTION LINES
|
Korytkowski, Przemyslaw |
|
2007 |
40 |
3 |
p. 93-98 6 p. |
artikel |
8 |
DIAGNOSIS BASED ON INTERVAL ANALYTICAL REDUNDANCY RELATIONS AND SIGNS OF THE SYMPTOMS
|
Gelso, Esteban R. |
|
2007 |
40 |
3 |
p. 135-140 6 p. |
artikel |
9 |
DSOPP: AN INTELLIGENT PLATFORM FOR DISTRIBUTED SIMULATION OF ORDER PROMISING PROTOCOLS IN SUPPLY CHAIN NETWORKS
|
Venkatadri, Uday |
|
2007 |
40 |
3 |
p. 63-68 6 p. |
artikel |
10 |
EFFECTIVE MULTICRITERIA REDUNDANCY ALLOCATION VIA MODEL-BASED SAFETY ANALYSIS
|
Parker, David J. |
|
2007 |
40 |
3 |
p. 153-158 6 p. |
artikel |
11 |
EQUIPMENT BASED CONTROL SYSTEM STRUCTURES FOR COMPLEX AND INTEGRATED SYSTEMS INTENTION AND INDUSTRIAL APPLICATION EXAMPLE
|
Wögerer, Christian |
|
2007 |
40 |
3 |
p. 189-196 8 p. |
artikel |
12 |
ESTIMATION OF JOB COMPLETION TIMES IN A DYNAMIC SHOP JOB BASED ON STATIC JOB SHOP SOLUTION
|
Heitz, Christoph |
|
2007 |
40 |
3 |
p. 81-86 6 p. |
artikel |
13 |
EVOLUTION CONTROL ENVIRONMENT FOR DISTRIBUTED AUTOMATION COMPONENTS
|
Rooker, Martijn N. |
|
2007 |
40 |
3 |
p. 241-246 6 p. |
artikel |
14 |
FLEXIBLE ASSEMBLY SYSTEMS THROUGH WORKPLACE-SHARING AND TIME-SHARING HUMAN-MACHINE COOPERATION – PISA
|
Bernhardt, Rolf |
|
2007 |
40 |
3 |
p. 247-251 5 p. |
artikel |
15 |
Front Cover
|
|
|
2007 |
40 |
3 |
p. i- 1 p. |
artikel |
16 |
FUNCTIONAL CONTROL OBJECTS IN DISTRIBUTED AUTOMATION SYSTEMS
|
Panjaitan, Seno |
|
2007 |
40 |
3 |
p. 259-264 6 p. |
artikel |
17 |
GENERATING A JOB DESCRIPTION FOR MOTION PLANNING
|
Jacobsen, Niels J. |
|
2007 |
40 |
3 |
p. 24-29 6 p. |
artikel |
18 |
IDENTIFICATON-BASED APPROACH TO SOFT SENSORS DESIGN
|
Bachtadze, Natalya |
|
2007 |
40 |
3 |
p. 87-92 6 p. |
artikel |
19 |
INSPECTION OF METALLIC STAMPED PARTS USING AN IMAGE FUSION TECHNIQUE
|
de la Fuente López, Eusebio |
|
2007 |
40 |
3 |
p. 177-182 6 p. |
artikel |
20 |
INTELLIGENT ASSEMBLY AND DISASSEMBLY PAST, PRESENT AND FUTURE
|
Kopacek, P. |
|
2007 |
40 |
3 |
p. 1-7 7 p. |
artikel |
21 |
Introduction and Invitation
|
|
|
2007 |
40 |
3 |
p. ii-ix nvt p. |
artikel |
22 |
IRREGULAR ROTATIONAL PLACEMENT OF SHAPES OVER NON–CONVEX CONTAINERS WITH FIXED DIMENSIONS
|
de Castro Martins, Thiago |
|
2007 |
40 |
3 |
p. 159-164 6 p. |
artikel |
23 |
KNOWLEDGE BASED AND CLP-DRIVEN APPROACH TO AGVs SYSTEM CONTROL
|
Bocewicz, Grzegorz |
|
2007 |
40 |
3 |
p. 56-62 7 p. |
artikel |
24 |
MODELLING INDUSTRIAL DISTRICTS FOR PERFORMANCE EVALUATION
|
Villa, Agostino |
|
2007 |
40 |
3 |
p. 227-232 6 p. |
artikel |
25 |
MODERN SOLUTION FOR CONTROLLING A COMBINED FODDER PLANT
|
Ivanescu, Nick Andrei |
|
2007 |
40 |
3 |
p. 203-208 6 p. |
artikel |
26 |
NEW REDUCTION METHODS FOR THE TRANSFER LINE BALANCING PROBLEM
|
Guschinskaya, Olga |
|
2007 |
40 |
3 |
p. 69-74 6 p. |
artikel |
27 |
ON THE USE OF SERVICE ORIENTED SOFTWARE PLATFORMS FOR INDUSTRIAL ROBOTIC CELLS
|
Veiga, G. |
|
2007 |
40 |
3 |
p. 109-115 7 p. |
artikel |
28 |
PLM AND PRODUCT EMBEDDED INFORMATION DEVICES
|
Kiritsis, Dimitris |
|
2007 |
40 |
3 |
p. 8-23 16 p. |
artikel |
29 |
PRODUCTION PLANNING AND CONTROL IN BIO-INSPIRED HOLONIC MANUFACTURING EXECUTION SYSTEMS
|
Hadeli, |
|
2007 |
40 |
3 |
p. 42-49 8 p. |
artikel |
30 |
PROGNOSTICS AND DIAGNOSTICS OF CONFLICTS AND ERRORS IN A SUPPLY NETWORK
|
Chen, Xin W. |
|
2007 |
40 |
3 |
p. 141-145 5 p. |
artikel |
31 |
PROGRAMMING AND SIMULATION OF ROBOTIC SYSTEMS FOR MACHINING OPERATIONS
|
Pizá, Ricardo |
|
2007 |
40 |
3 |
p. 36-41 6 p. |
artikel |
32 |
RECOGNITION AND 6DOF LOCALISATION OF PARTS FOR LOTSIZE1 AUTOMATION
|
Pichler, Andreas |
|
2007 |
40 |
3 |
p. 265-270 6 p. |
artikel |
33 |
RECONFIGURABLE PRODUCTION CONTROL SYSTEMS: BEYOND ADACOR
|
Leitão, Paulo |
|
2007 |
40 |
3 |
p. 129-134 6 p. |
artikel |
34 |
RFID for Agent-Oriented Manufacturing Control
|
Encinas, J.C. |
|
2007 |
40 |
3 |
p. 122-128 7 p. |
artikel |
35 |
ROBOT GUIDANCE BY ESTIMATING THE FORCE-IMAGE INTERACTION MATRIX
|
García, G.J. |
|
2007 |
40 |
3 |
p. 277-282 6 p. |
artikel |
36 |
ROBOT TASK SPECIFICATION AND EXECUTION THROUGH RELATIONAL POSITIONING
|
Rodríguez, Adolfo |
|
2007 |
40 |
3 |
p. 183-188 6 p. |
artikel |
37 |
ROBUST ALGORITHM FOR SCHEDULING OF MANUFACTURING TASKS WITH INTERVAL EXECUTION TIMES
|
Józefczyk, Jerzy |
|
2007 |
40 |
3 |
p. 75-80 6 p. |
artikel |
38 |
SEAL QUALITY EVALUATION USING MULTIVARIATE STATISTICAL CONTROL CHARTS BASED ON ACCELERATION DATA
|
Ostyn, B. |
|
2007 |
40 |
3 |
p. 216-221 6 p. |
artikel |
39 |
SENSOR PLANNING FOR CARS HEADLAMPS INSPECTION USING EXPERT KNOWLEDGE
|
Martínez, S. Satorres |
|
2007 |
40 |
3 |
p. 165-170 6 p. |
artikel |
40 |
SMART SENSOR IDENTIFIER (S2I) APPLICATION AND TRACKING OF SENSITIVE PRODUCTS
|
de la Fuente Ruz, M. |
|
2007 |
40 |
3 |
p. 233-239 7 p. |
artikel |
41 |
SOLDER PASTE INSPECTION BY SPECIAL LED LIGHTING FOR SMT MANUFACTURING OF PRINTED CIRCUIT BOARDS
|
Chu, Ming-Hei |
|
2007 |
40 |
3 |
p. 222-226 5 p. |
artikel |
42 |
STEP MODEL FOR AUTOMATION OF PROCESS MONITORING IN STEP-NC CLOSE-LOOP MANUFACTURING.
|
Campos, Julio Garrido |
|
2007 |
40 |
3 |
p. 210-215 6 p. |
artikel |
43 |
Technical Program
|
|
|
2007 |
40 |
3 |
p. x-xiii nvt p. |
artikel |
44 |
TELEOPERATED SERVICE ROBOT FOR HIGH QUALITY SHIPS' MAINTENANCE
|
Navarro, Pedro J. |
|
2007 |
40 |
3 |
p. 197-202 6 p. |
artikel |
45 |
THE ARFLEX PROJECT: ADAPTIVE ROBOTS FOR FLEXIBLE MANUFACTURING SYSTEMS
|
Caporaletti, G. |
|
2007 |
40 |
3 |
p. 253-258 6 p. |
artikel |
46 |
TOWARDS SHORT SERIES PRODUCTION: ROBOT–BASED FLEXIBLE MANUFACTURING WITH INTELLIGENT SENSING
|
Sallinen, Mikko |
|
2007 |
40 |
3 |
p. 271-276 6 p. |
artikel |
47 |
VIRTUAL LEARNING ENVIRONMENT WITH FLEXIBLE MIXED REALITY REMOTE EXPERIMENTS ARCHITECTURE
|
Schaf, F.M. |
|
2007 |
40 |
3 |
p. 99-104 6 p. |
artikel |