nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A COOPERATIVE POWER TRADING SYSTEM BASED ON SATISFACTION SPACE TECHNOLOGY
|
Matsumoto, Keinosuke |
|
2006 |
39 |
7 |
p. 53-58 6 p. |
artikel |
2 |
ADAPTIVE GOVERNOR CONTROL AND LOAD SHEDDING SCHEME FOR AN INCINERATOR PLANT
|
Lee, Y.D. |
|
2006 |
39 |
7 |
p. 413-418 6 p. |
artikel |
3 |
A DISTRIBUTED CONTROL ALGORITHM FOR AGC IN HYDROTHERMAL POWER PLANTS
|
Raj, Hemant |
|
2006 |
39 |
7 |
p. 1-6 6 p. |
artikel |
4 |
A FAULT DIAGNOSIS AND OPERATION ADVISING COOPERATIVE EXPERT SYSTEM BASED ON MULTI-AGENT TECHNOLOGY
|
Zhao, Wei |
|
2006 |
39 |
7 |
p. 195-200 6 p. |
artikel |
5 |
A MULTI-AGENT SYSTEM-BASED REFERENCE GOVERNOR FOR MULTIOBJECTIVE POWER PLANT OPERATION
|
Heo, Jin S. |
|
2006 |
39 |
7 |
p. 407-412 6 p. |
artikel |
6 |
AN AFFINE GEOMETRICAL APPROACH TO POWER SYSTEMS PROBLEMS
|
Crainic, Emmanuel D. |
|
2006 |
39 |
7 |
p. 101-106 6 p. |
artikel |
7 |
ANALYTICAL INVESTIGATION OF THE EFFECT OF GENERATOR MODELLING ON ELECTROMECHANICAL MODE DAMPING
|
Kaberere, Keren |
|
2006 |
39 |
7 |
p. 291-296 6 p. |
artikel |
8 |
AN APPROACH TO OPTIMAL DISPATCH OF BILATERAL ELECTRICITY CONTRACTS REGARDING VOLTAGE STABILITY
|
Mozafari, B. |
|
2006 |
39 |
7 |
p. 65-70 6 p. |
artikel |
9 |
A NEW NUMERICAL ALGORITHM FOR FAULT LOCATION ESTIMATION USING TWO-TERMINAL SYNCHRONIZED VOLTAGE AND CURRENT PHASORS
|
Lee, Chan-Joo |
|
2006 |
39 |
7 |
p. 131-136 6 p. |
artikel |
10 |
A Novel Concept for Stabilization of AC/DC Network with UPFC
|
Pandey, R.K. |
|
2006 |
39 |
7 |
p. 1-6 6 p. |
artikel |
11 |
APPLICATION OF AFFINE TRANSFORMATIONS TO REAL-TIME POWER SYSTEM EMS FUNCTIONS
|
Crainic, Emmanuel D. |
|
2006 |
39 |
7 |
p. 333-338 6 p. |
artikel |
12 |
AUTONOMOUS POWER NETWORKS BASED POWER SYSTEM
|
Jokic, A. |
|
2006 |
39 |
7 |
p. 339-344 6 p. |
artikel |
13 |
COMBUSTION PLANT MONITORING AND CONTROL USING INFRARED AND VIDEO CAMERAS
|
Zipser, S. |
|
2006 |
39 |
7 |
p. 249-254 6 p. |
artikel |
14 |
COMPARISON OF METHODS FOR OSCILLATION DETECTION – CASE STUDY ON A COAL-FIRED POWER PLANT
|
Odgaard, Peter Fogh |
|
2006 |
39 |
7 |
p. 297-302 6 p. |
artikel |
15 |
COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING SYNCHRONIZED SAMPLING
|
Zhang, Nan |
|
2006 |
39 |
7 |
p. 137-142 6 p. |
artikel |
16 |
CONTROL PERFORMANCE OF LARGE SCALE STEAM POWER PLANTS AND IMPROVEMENTS
|
Weissbach, T. |
|
2006 |
39 |
7 |
p. 183-188 6 p. |
artikel |
17 |
CURRENT FEATURES OF DCS SYSTEMS FOR POWER PLANTS
|
Trybus, Leszek |
|
2006 |
39 |
7 |
p. 1-6 6 p. |
artikel |
18 |
DESIGN, IMPLEMENTATION AND TESTING OF AN ARTIFICIAL NEURAL NETWORK BASED ADMITTANCE RELAY
|
Chawla, Gaganpreet |
|
2006 |
39 |
7 |
p. 125-130 6 p. |
artikel |
19 |
DETERMINATION OF TRANSMISSION TRANSFER CAPABILITY WITH SECURITY AND VOLATAGE STABILITY
|
Hur, Don |
|
2006 |
39 |
7 |
p. 113-118 6 p. |
artikel |
20 |
DEVELOPMENT OF AN EXTENDED PREDICTIVE CONTROLLER FOR A SPEED CONTROL SYSTEM
|
Abu-Ayyad, Ma'moun |
|
2006 |
39 |
7 |
p. 35-40 6 p. |
artikel |
21 |
DEVELOPMENT OF EDUCATIONAL WEB-BASED SIMULATOR FOR THE ELECTRICITY SPOT MARKET IN KOREA
|
Lee, Joo-Won |
|
2006 |
39 |
7 |
p. 47-52 6 p. |
artikel |
22 |
DEVELOPMENT OF THE AUTOMATIC RECOGNITION SYSTEM FOR DISTRIBUTION FACILITY MAP
|
Yi, Bong-Jae |
|
2006 |
39 |
7 |
p. 231-236 6 p. |
artikel |
23 |
DISCRETE-TIME MODEL REFERENCE ADAPTIVE REGULATION OF NODAL VOLTAGE AMPLITUDE IN POWER SYSTEMS
|
Fusco, Giuseppe |
|
2006 |
39 |
7 |
p. 107-112 6 p. |
artikel |
24 |
DISTRIBUTED MPC STRATEGIES FOR AUTOMATIC GENERATION CONTROL
|
Venkat, Aswin N. |
|
2006 |
39 |
7 |
p. 383-388 6 p. |
artikel |
25 |
DUAL INPUT QUASI-OPTIMAL PSS FOR GENERATING UNIT WITH STATIC EXCITATION SYSTEM
|
Lubosny, Zbigniew |
|
2006 |
39 |
7 |
p. 267-272 6 p. |
artikel |
26 |
ECONOMIC DISPATCH ALGORITHM BY λ-P TABLES REFLECTING ACTUAL FUEL COST CURVES
|
Min, Kyung-Il |
|
2006 |
39 |
7 |
p. 365-370 6 p. |
artikel |
27 |
ENHANCEMENT OF ELECTRIC MOTOR RELIABILITY THROUGH CONDITION MONITORING
|
Holbert, Keith E. |
|
2006 |
39 |
7 |
p. 255-260 6 p. |
artikel |
28 |
ESTIMATION OF MOISTURE CONTENT IN COAL IN COAL MILLS
|
Odgaard, Peter Fogh |
|
2006 |
39 |
7 |
p. 89-94 6 p. |
artikel |
29 |
EXPERIMENTAL STUDIES ON A PROTO-TYPE POWER SYSTEM USING AN ADAPTIVE PSS
|
Ramakrishna, G. |
|
2006 |
39 |
7 |
p. 273-278 6 p. |
artikel |
30 |
EXTENDED PHASE COMPENSATION DESIGN OF POWER SYSTEM STABILIZER FOR BISOTOUN POWER PLANT
|
Zafarabadi, G. |
|
2006 |
39 |
7 |
p. 279-284 6 p. |
artikel |
31 |
FAULT DETECTION IN COAL MILLS USED IN POWER PLANTS
|
Odgaard, Peter Fogh |
|
2006 |
39 |
7 |
p. 177-182 6 p. |
artikel |
32 |
HYBRID HVDC CONVERTERS AND THEIR IMPACT ON POWER SYSTEM DYNAMIC PERFORMANCE
|
Qahraman, B. |
|
2006 |
39 |
7 |
p. 147-152 6 p. |
artikel |
33 |
IDENTFICATION OF ELECTRIC PARAMETERS OF SYNCHRONOUS GENERATOR USING INPUT_OUTPUT DATA SET
|
Saied, S.A. |
|
2006 |
39 |
7 |
p. 83-88 6 p. |
artikel |
34 |
IDENTIFICATION OF SYNCHRONOUS GENERATORS USING “4SID” IDENTIFICATION METHOD AND NEURAL NETWOKS
|
Karrari, M. |
|
2006 |
39 |
7 |
p. 71-76 6 p. |
artikel |
35 |
IMPORTANCE OF THE SELFREGULATING EFFECT WITHIN POWER SYSTEMS
|
Kurth, M. |
|
2006 |
39 |
7 |
p. 345-352 8 p. |
artikel |
36 |
INFLUENCE OF WIND ENERGY ON THE POWER STATION PARK AND THE GRID
|
Weber, H. |
|
2006 |
39 |
7 |
p. 59-64 6 p. |
artikel |
37 |
INTELLIGENT START-UP SCHEDULE OPTIMIZATION SYSTEM FOR A THERMAL POWER PLANT
|
SHIRAKAWA, Masakazu |
|
2006 |
39 |
7 |
p. 189-194 6 p. |
artikel |
38 |
LIMITATION CONTROL PROCEDURES, REQUIRED FOR POWER PLANTS AND POWER SYSTEMS POSSIBILITY FOR REDUCING FUTURE BLACKOUTS
|
Welfonder, E. |
|
2006 |
39 |
7 |
p. 7-16 10 p. |
artikel |
39 |
LOW LOAD MODEL OF A ONCE-THROUGH BOILER WITH RECIRCULATION
|
Trangbaek, Klaus |
|
2006 |
39 |
7 |
p. 303-308 6 p. |
artikel |
40 |
MGP: A TOOL FOR WIDE RANGE TEMPERATURE MODELING
|
Morales, Angel Fernando Kuri |
|
2006 |
39 |
7 |
p. 315-320 6 p. |
artikel |
41 |
MODELBASED FLEET OPTIMISATION AND MASTER CONTROL OF A POWER PRODUCTION SYSTEM
|
Joergensen, Claus |
|
2006 |
39 |
7 |
p. 201-206 6 p. |
artikel |
42 |
MODELING VOLTAGE REGULATION IN OBJECT-ORIENTED ANALYSIS OF DISTRIBUTION SYSTEMS INCLUDING DISPERSED GENERATION
|
Casolino, G.M. |
|
2006 |
39 |
7 |
p. 213-218 6 p. |
artikel |
43 |
MODELLING AND OPTIMIZATION OF A MICRO COMBINED HEAT AND POWER PLANT
|
Faille, Damien |
|
2006 |
39 |
7 |
p. 389-394 6 p. |
artikel |
44 |
OBSERVER-BASED COAL MILL CONTROL USING OXYGEN MEASUREMENTS
|
Andersen, Palle |
|
2006 |
39 |
7 |
p. 171-176 6 p. |
artikel |
45 |
Operator Guidance Simulator: A New Power Plant Training Tool Concept
|
Tomschi, Ulrich |
|
2006 |
39 |
7 |
p. 327-332 6 p. |
artikel |
46 |
OPTIMAL ALLOCATION OF STATIC VAR COMPENSATORS USING MODAL ANALYSIS, SIMULATED ANNEALING AND TABU SEARCH
|
Ebrahimi, Somayeh |
|
2006 |
39 |
7 |
p. 377-382 6 p. |
artikel |
47 |
OPTIMAL POWER SYSTEM MANAGEMENT VIA MIXED INTEGER DYNAMIC PROGRAMMING
|
Kwatny, Harry G. |
|
2006 |
39 |
7 |
p. 353-358 6 p. |
artikel |
48 |
PARAMETER ESTIMATION OF POWER SYSTEM OSCILLATIONS BASED ON PHASOR MEASUREMENTS
|
Hashiguchi, Takuhei |
|
2006 |
39 |
7 |
p. 77-82 6 p. |
artikel |
49 |
PERFORMANCE OF H∞-PSSs AS AFFECTED BY THE PARAMETERS OF THE BILINEAR TRANSFORMATION
|
Folly, KA |
|
2006 |
39 |
7 |
p. 261-266 6 p. |
artikel |
50 |
POWER SYSTEM MAXIMUM LOAD ABILITY WITH GENERATION CONSTRAINTS
|
Fernandes, C.E.M. |
|
2006 |
39 |
7 |
p. 371-376 6 p. |
artikel |
51 |
POWER SYSTEM STABILIZER DESIGN FOR MULTIMACHINE POWER SYSTEM USING POPULATION-BASED INCREMENTAL LEARNING
|
Folly, KA |
|
2006 |
39 |
7 |
p. 41-46 6 p. |
artikel |
52 |
PREDICTING TRANSIENT INSTABILITY OF POWER SYSTEMS BASED ON HYBRID SYSTEM REACHABILITY ANALYSIS
|
Susuki, Yoshihiko |
|
2006 |
39 |
7 |
p. 153-158 6 p. |
artikel |
53 |
PRIMARY CONTROL SYSTEM AND STABILITY ANALYSIS OF A HYDROPOWER PLANT
|
Zoby, Maria Regina Gomes |
|
2006 |
39 |
7 |
p. 165-170 6 p. |
artikel |
54 |
REAL-TIME VOLT/VAR CONTROL IN A DISTRIBUTION SYSTEM USING MULTI-STAGE METHOD
|
Park, Jong-young |
|
2006 |
39 |
7 |
p. 225-230 6 p. |
artikel |
55 |
RELIABILITY ENHANCEMENT SCHEME FOR IEC61850 BASED SUBSTATION AUTOMATION SYSTEM
|
Lim, Seong-Il |
|
2006 |
39 |
7 |
p. 207-212 6 p. |
artikel |
56 |
ROBUST CONTROL DESIGN OF PSS IN WIDE AREA POWER SYSTEM CONSIDERING INFORMATION RELIABILITY
|
Ukai, Hiroyuku |
|
2006 |
39 |
7 |
p. 285-290 6 p. |
artikel |
57 |
ROBUST DECENTRALIZED H ∞ CONTROLLER DESIGN FOR POWER SYSTEMS: A MATRIX INEQUALITY APPROACH USING PARAMETER CONTINUATION METHOD
|
Befekadu, Getachew K. |
|
2006 |
39 |
7 |
p. 23-28 6 p. |
artikel |
58 |
SELF-TUNING PI CONTROLLER
|
Boiko, Igor |
|
2006 |
39 |
7 |
p. 29-34 6 p. |
artikel |
59 |
SEMIGROUP BASED NEURAL NETWORK ARCHITECTURE FOR EXTRAPOLATION OF MASS UNBALANCE FOR ROTATING MACHINES IN POWER PLANTS
|
Kim, Byoung-Hee |
|
2006 |
39 |
7 |
p. 309-314 6 p. |
artikel |
60 |
SENSOR DYNAMICS COMPENSATOR FOR TEMPERATURE MEASUREMENT IN COMBUSTION CHAMBERS OF UTILITY BOILERS AND INCINERATORS
|
Boiko, Igor |
|
2006 |
39 |
7 |
p. 237-242 6 p. |
artikel |
61 |
SERVICE RESTORATION CONSIDERING LOAD BALANCING IN DISTRIBUTION
|
Choi, Sang-Yule |
|
2006 |
39 |
7 |
p. 219-224 6 p. |
artikel |
62 |
SIMPLIFIED FUEL CELL SYSTEM MODEL IDENTIFICATION
|
Caux, S. |
|
2006 |
39 |
7 |
p. 95-100 6 p. |
artikel |
63 |
SIMULATION AS A TOOL FOR PROCESS DESIGN AND DISTURBANCE ANALYSIS IN INDUSTRIAL POWER PLANTS
|
Majanne, Yrjö |
|
2006 |
39 |
7 |
p. 321-326 6 p. |
artikel |
64 |
SISO EXTENDED PREDICTIVE CONTROL – FORMULATION AND ROBUST ANALYSIS
|
Abu-Ayyad, Ma'moun |
|
2006 |
39 |
7 |
p. 17-22 6 p. |
artikel |
65 |
STABILITY ANALYSIS OF AN ISLANDED GENERATOR
|
Lilje, P. |
|
2006 |
39 |
7 |
p. 159-164 6 p. |
artikel |
66 |
STATIC CHARATERISTICS ANALYSIS OF POWER SYSTEMS THROUGH A HERMITIAN APPROACH
|
Zhou, Jun |
|
2006 |
39 |
7 |
p. 359-364 6 p. |
artikel |
67 |
Study on the establishment of dynamic performance test environment for the digital protective relay using RTDS
|
Jang, ByungTae |
|
2006 |
39 |
7 |
p. 143-146 4 p. |
artikel |
68 |
SUB-SPACE PRINCIPAL COMPONENT ANALYSIS FOR POWER PLANT MONITORING
|
Pan, L. |
|
2006 |
39 |
7 |
p. 243-248 6 p. |
artikel |
69 |
Technical Program
|
|
|
2006 |
39 |
7 |
p. v-xvi nvt p. |
artikel |
70 |
THE WAY OF DISTRICT HEATING OUTPUT CONTROL BY MEANS OF HYDROTHERMAL POWER SYSTEMS – THREE MODIFICATIONS
|
Balátě, Jaroslav |
|
2006 |
39 |
7 |
p. 395-400 6 p. |
artikel |
71 |
TORSIONAL STRESS OF TURBINE-GENERATOR IN POWER SYSTEM WITH AN HVDC
|
Kim, Chan-Ki |
|
2006 |
39 |
7 |
p. 1-6 6 p. |
artikel |
72 |
VERIFICATION OF HYBRID REAL TIME HVDC SIMULATOR IN CHEJU-HAENAM HVDC SYSTEM
|
Yang, B.M. |
|
2006 |
39 |
7 |
p. 1-5 5 p. |
artikel |
73 |
VOLTAGE STABILITY ASSESSMENT AND ENHANCEMENT OF THE THAILAND POWER SYSTEM
|
Sode-Yome, Arthit |
|
2006 |
39 |
7 |
p. 119-124 6 p. |
artikel |
74 |
WEIGHTED FOULING MODEL FOR POWER PLANT CONDENSER MONITORING
|
Cregan, M. |
|
2006 |
39 |
7 |
p. 401-406 6 p. |
artikel |