nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Constrained Optimal Control Problem with Application to Production Planning
|
Silva Filho, O.S. |
|
1998 |
31 |
31 |
p. 275-280 6 p. |
artikel |
2 |
Adaptive Linearizing Control of Mobile Robots
|
Lages, Walter Fetter |
|
1998 |
31 |
31 |
p. 23-28 6 p. |
artikel |
3 |
A Formal Model for Integrated Complex Dynamic Systems
|
Ramos, Roberto Luiz C.B. |
|
1998 |
31 |
31 |
p. 217-223 7 p. |
artikel |
4 |
A Knowledge Management Structure for Intelligent Organizations
|
Ramos, Carlos |
|
1998 |
31 |
31 |
p. 171-176 6 p. |
artikel |
5 |
A model for integrating design and manufacturing using group technology and feature-based modeling
|
Silva, Narciso A. |
|
1998 |
31 |
31 |
p. 257-261 5 p. |
artikel |
6 |
A Multisensor Robot Arcitecture with Distributed Behaviour Selection
|
Benet, G. |
|
1998 |
31 |
31 |
p. 315-318 4 p. |
artikel |
7 |
An Adaptive Neural Controller for a Robot
|
Stemmer, Marcelo R. |
|
1998 |
31 |
31 |
p. 115-120 6 p. |
artikel |
8 |
An Autonomous Objects Architecture for Developing Flexible Industrial Automation and Manufacturing Systems
|
Pereira, C.E. |
|
1998 |
31 |
31 |
p. 153-158 6 p. |
artikel |
9 |
Application of the Multi-Agent Approach in Production Planning and Modelling
|
Mařík, Vladimír |
|
1998 |
31 |
31 |
p. 11-16 6 p. |
artikel |
10 |
A Predictive Algorithm with Fine Interpolation for Vision-Guided Robots
|
Bauchspiess, Adolfo |
|
1998 |
31 |
31 |
p. 97-102 6 p. |
artikel |
11 |
Assembly Planning in the Design of Flexible Assembly Systems
|
Stadzisz, P.C. |
|
1998 |
31 |
31 |
p. 133-138 6 p. |
artikel |
12 |
Assembly Sequence Generation - Heuristic Research
|
Pham, V.H. |
|
1998 |
31 |
31 |
p. 139-144 6 p. |
artikel |
13 |
Author Index
|
|
|
1998 |
31 |
31 |
p. 325- 1 p. |
artikel |
14 |
Automated Manufacturing with Flexible Parts: A Control Perspective
|
Mendes, Marcos F. |
|
1998 |
31 |
31 |
p. 85-90 6 p. |
artikel |
15 |
Automatic control and adjustment of TV picture geometry
|
Mohorko, Jože |
|
1998 |
31 |
31 |
p. 189-192 4 p. |
artikel |
16 |
Case-Based Planning in Transaction Logic Framework
|
Tonidandel, Flavio |
|
1998 |
31 |
31 |
p. 281-286 6 p. |
artikel |
17 |
Concurrent Engineering in Global Environment
|
Gimenez, Claudemir |
|
1998 |
31 |
31 |
p. 245-250 6 p. |
artikel |
18 |
Covered Electrode Melting Rate Modeling by Core Rod Temperature Monitoring for Mechanized Welding
|
Batana, Jean Robert |
|
1998 |
31 |
31 |
p. 183-188 6 p. |
artikel |
19 |
Data Dependency Manipulation to Support Cad Systems with Boolean Operations
|
de Sales Guerra Tsuzuki, Marcos |
|
1998 |
31 |
31 |
p. 193-198 6 p. |
artikel |
20 |
Dealing with Intelligence in Manufacturing System
|
Spinosa, Luiz Marcio |
|
1998 |
31 |
31 |
p. 177-182 6 p. |
artikel |
21 |
Design for Assembly (DFA) Using Resources of Virtual Reality
|
Tahara, Creusa Sayuri |
|
1998 |
31 |
31 |
p. 299-303 5 p. |
artikel |
22 |
Developing a System Architecture for Holonic Shop Floor Control
|
Sørensen, Christian |
|
1998 |
31 |
31 |
p. 47-53 7 p. |
artikel |
23 |
Didactic Integration, Control, and Implementation of Flexible Manufacturing Cells
|
Vieira, Guilherme E. |
|
1998 |
31 |
31 |
p. 67-72 6 p. |
artikel |
24 |
Environment for Design and Analysis of Business Process (EDABP)
|
Carvalho, M.F. |
|
1998 |
31 |
31 |
p. 319-324 6 p. |
artikel |
25 |
Fault Prediction in the Production of Porcelain Art Pieces *
|
Simó, J. |
|
1998 |
31 |
31 |
p. 127-132 6 p. |
artikel |
26 |
Flexible Coordination in Virtual Enterprises *
|
Camarinha-Matos, L.M. |
|
1998 |
31 |
31 |
p. 35-40 6 p. |
artikel |
27 |
Generic Framework for Conflict Resolution in Negotiation-Based Agile Scheduling Systems
|
Rabelo, Ricardo J. |
|
1998 |
31 |
31 |
p. 159-164 6 p. |
artikel |
28 |
Heterogeneous Intelligent Systems: Integration and Synchronisation of Concurrent Processes
|
Zaremba, M.B. |
|
1998 |
31 |
31 |
p. 17-22 6 p. |
artikel |
29 |
Holonic Manufacturing Control Systems: Architecture and Methodology
|
Valckenaers, Paul |
|
1998 |
31 |
31 |
p. 55-60 6 p. |
artikel |
30 |
Human Engineering
|
Russell, David W. |
|
1998 |
31 |
31 |
p. 7-9 3 p. |
artikel |
31 |
Human Intuitions Based Planning for Mobile Robots Considering Dynamic Environments
|
Vendrell, Eduardo |
|
1998 |
31 |
31 |
p. 103-108 6 p. |
artikel |
32 |
Hybrid Aspects of Modelling Manufacturing Systems Using Modified Petri Nets
|
Drath, Rainer |
|
1998 |
31 |
31 |
p. 145-151 7 p. |
artikel |
33 |
Integrated Logistics in the Virtual Enterprise: The PRODNET-II Approach
|
Klen, Alexandra Augosta Pereira |
|
1998 |
31 |
31 |
p. 225-231 7 p. |
artikel |
34 |
Integrated Logistics Management Support System: An Advanced Coordination Functionality for the Virtual Environment
|
Klen, Alexandra Augusta Pereira |
|
1998 |
31 |
31 |
p. 233-238 6 p. |
artikel |
35 |
Investments in Industrial Automation - A Decision Aid Methodology
|
Távora Júnior, José Lamartine |
|
1998 |
31 |
31 |
p. 305-307 3 p. |
artikel |
36 |
Managing External Events in Planning
|
Lopes, Carlos |
|
1998 |
31 |
31 |
p. 287-292 6 p. |
artikel |
37 |
Manufacturing in Networks - Competitive Advantages for Virtual Enterprises
|
Sihn, Wilfried |
|
1998 |
31 |
31 |
p. 29-34 6 p. |
artikel |
38 |
Modelling Aspects of Manufacturing of Printed Circuit Boards
|
Carrara, Alcy Rodolfo dos Santos |
|
1998 |
31 |
31 |
p. 269-274 6 p. |
artikel |
39 |
Monitoring the Quality of Non-Woven Textiles using Stochastic Texture Discrimination
|
Scharcanski, J. |
|
1998 |
31 |
31 |
p. 121-126 6 p. |
artikel |
40 |
Multilevel Algebraic Modelling of Complex Manufacturing Tasks
|
Bourrières, J.P. |
|
1998 |
31 |
31 |
p. 205-209 5 p. |
artikel |
41 |
Multistage Production Control; An LMI Approach
|
Hennet, Jean-Claude |
|
1998 |
31 |
31 |
p. 79-84 6 p. |
artikel |
42 |
Neural Network Transition Enabling Function Petri Net to Supervisory Control
|
Barroso, Giovanni Cordeiro |
|
1998 |
31 |
31 |
p. 109-113 5 p. |
artikel |
43 |
Object Recognition for an Agent-Based Controlled Mobile Robot
|
Filho, Teodiano Freire Bastos |
|
1998 |
31 |
31 |
p. 263-268 6 p. |
artikel |
44 |
On the Treatment of the Ramification Problem with Transaction Logic
|
Tonidandel, Flavio |
|
1998 |
31 |
31 |
p. 211-216 6 p. |
artikel |
45 |
Petri Net-Based Decision Nets
|
Simões, Marcos Aurélio Scopel |
|
1998 |
31 |
31 |
p. 251-256 6 p. |
artikel |
46 |
Preface
|
Kopacek, Peter |
|
1998 |
31 |
31 |
p. iv- 1 p. |
artikel |
47 |
Proposal for a Dynamic Scheduling Architecture and Method Using an Holonic Approach
|
Silva, Nuno |
|
1998 |
31 |
31 |
p. 61-66 6 p. |
artikel |
48 |
Reasoning about Qualitative & Quantitative Temporal Representations for Manufacturing Planning Tasks
|
López, Maricela Quintana |
|
1998 |
31 |
31 |
p. 293-298 6 p. |
artikel |
49 |
Robots in Production Automation
|
Kopacek, Peter |
|
1998 |
31 |
31 |
p. 1-6 6 p. |
artikel |
50 |
SACI_FTR_LOADER: A Dynamic Loader for the On-Board Computer of the First Brazilian Microssatelite
|
de Sousa Castro, Helano |
|
1998 |
31 |
31 |
p. 91-96 6 p. |
artikel |
51 |
Scheduling Flexible Manufacturing Cells Using a Token Player Algorithm
|
Julia, Stéphane |
|
1998 |
31 |
31 |
p. 165-170 6 p. |
artikel |
52 |
Specification of Hybrid Components of Control Systems
|
Vain, Jüri |
|
1998 |
31 |
31 |
p. 73-78 6 p. |
artikel |
53 |
Standards and Methodologies for the Integration of CAE in the Engineering Life Cycle
|
Wenzeka, Hagen R. |
|
1998 |
31 |
31 |
p. 199-204 6 p. |
artikel |
54 |
Topogrametry: A Practical Tool for Geometrical Modelling
|
Fantin, Analucia Vieira |
|
1998 |
31 |
31 |
p. 309-314 6 p. |
artikel |
55 |
Virtual Enterprise - Organization and Information Technology Infrastructure
|
Park, Kyung Hye |
|
1998 |
31 |
31 |
p. 239-244 6 p. |
artikel |
56 |
Workflow Support for Management of Information of Prodnet II
|
Afsarmanesh, Hamideh |
|
1998 |
31 |
31 |
p. 41-46 6 p. |
artikel |