nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Acquisition of Scheduling Rules for Job Shop Problems
|
Suwa, H. |
|
1997 |
30 |
19 |
p. 301-306 6 p. |
artikel |
2 |
Adaptive Optimization Approach for the Supervision of an Irrigation System
|
Faye, R.M. |
|
1997 |
30 |
19 |
p. 363-368 6 p. |
artikel |
3 |
A Digital Adaptive Control
|
Giraldo, Didier |
|
1997 |
30 |
19 |
p. 601-606 6 p. |
artikel |
4 |
A Distributed Virtual Factory for Behavioral Analysis of a Large Manufacturing System
|
Fujii, S. |
|
1997 |
30 |
19 |
p. 115-120 6 p. |
artikel |
5 |
A Flow Oriented Approach in the Reengineering Process
|
Schaefers, J. |
|
1997 |
30 |
19 |
p. 555-560 6 p. |
artikel |
6 |
Agent-Based Interorganisational Workflow
|
Bichler, Lutz |
|
1997 |
30 |
19 |
p. 1-6 6 p. |
artikel |
7 |
Agent Oriented Technology of Decentralized Systems Based on the M-Agent Architecture
|
Edward Nawarecki, Ewa Cetnarowicz |
|
1997 |
30 |
19 |
p. 381-386 6 p. |
artikel |
8 |
A Global Optimization Algorithm for Solving Linear Programming Problem
|
Ribeiro Cavalcante, José Ranieri |
|
1997 |
30 |
19 |
p. 513-515 3 p. |
artikel |
9 |
A Hierarchy for Cooperative Enterprise
|
Carvalho, Marcins F.H. |
|
1997 |
30 |
19 |
p. 419-424 6 p. |
artikel |
10 |
A Highway to Overall Efficiency in Manufacturing Companies
|
Pinto Jr., Arthur D. |
|
1997 |
30 |
19 |
p. 621-624 4 p. |
artikel |
11 |
Air Pollution Monitoring Using Genetic Algorithm, Fuzzy Logic and Neural Networks
|
de Souza Júnior, Paulo Antônio |
|
1997 |
30 |
19 |
p. 617-620 4 p. |
artikel |
12 |
A JIT/MRPII Integrated Model for a Repetitive Manufacturing Environment
|
Sérgio Fortulan, Antonio |
|
1997 |
30 |
19 |
p. 61-66 6 p. |
artikel |
13 |
A Marketing - Logistic Appraisal of a Retailer - Distributor Company
|
Caldas, Marco A.F. |
|
1997 |
30 |
19 |
p. 127-130 4 p. |
artikel |
14 |
A Monte-Carlo Approach to Nonlinear Stochastic Optimal Control with an Example Using the HMMS Data
|
Samohyl, Robert Wayne |
|
1997 |
30 |
19 |
p. 507-512 6 p. |
artikel |
15 |
An Algorithm of the Safe Ship Control as a Matrix Game in a Fuzzy Environment
|
Lisowski, Józef |
|
1997 |
30 |
19 |
p. 543-547 5 p. |
artikel |
16 |
An Approach for an Integrated Management of Production and Quality
|
Alexandru, Adriana |
|
1997 |
30 |
19 |
p. 339-344 6 p. |
artikel |
17 |
A Network-Centric Information System Infrastructure for Extended or Virtual Enterprises
|
Kyung Hye, Park |
|
1997 |
30 |
19 |
p. 91-96 6 p. |
artikel |
18 |
A Neural Network Environment for Modelling and Simulation
|
Ciuca, I. |
|
1997 |
30 |
19 |
p. 535-541 7 p. |
artikel |
19 |
A Neural Network for Solving Job Shop Scheduling Problem
|
Abada, A. |
|
1997 |
30 |
19 |
p. 295-299 5 p. |
artikel |
20 |
An Industrial Automated Warehouse Based on Overhead Trolleys.
|
Marin, R. |
|
1997 |
30 |
19 |
p. 137-142 6 p. |
artikel |
21 |
An Information Management Architecture for Multi-Site Production Planning and Control
|
Zbou, Qu |
|
1997 |
30 |
19 |
p. 19-24 6 p. |
artikel |
22 |
An Object-Oriented Simulation Model for Flexible Manufacturing Systems Analysis
|
Borenstein, Denis |
|
1997 |
30 |
19 |
p. 445-450 6 p. |
artikel |
23 |
An Optimising Model for Supply Chain Management
|
Clark, Alistair R. |
|
1997 |
30 |
19 |
p. 109-114 6 p. |
artikel |
24 |
A Note on Realizable Sequences in Supervisory Control of Timed Event Graphs
|
Takai, Shigemasa |
|
1997 |
30 |
19 |
p. 155-160 6 p. |
artikel |
25 |
A Parallel Algorithm for Production Scheduling
|
Ferreira Ribeiro, José Francisco |
|
1997 |
30 |
19 |
p. 321-325 5 p. |
artikel |
26 |
Application of Queuing Systems with Many Classes of Customers for Structural Optimisation of Banks
|
Filipowicz, Boguslaw |
|
1997 |
30 |
19 |
p. 149-154 6 p. |
artikel |
27 |
A Practical Production Planning Method in a Semiconductor Wafer Fabrication
|
Chang, Y.S. |
|
1997 |
30 |
19 |
p. 25-30 6 p. |
artikel |
28 |
A Process / Agent / Operation Paradigm for Manufacturing Systems Modelling
|
Vernadat, F. |
|
1997 |
30 |
19 |
p. 411-418 8 p. |
artikel |
29 |
Attaining a Compromise in Multi-Agent World
|
Nawarecki, Edward |
|
1997 |
30 |
19 |
p. 369-374 6 p. |
artikel |
30 |
Author Index
|
|
|
1997 |
30 |
19 |
p. 629-630 2 p. |
artikel |
31 |
Business Modelling Applied to the Development of Quality Systems
|
Rapanello Donati, Ronaldo Francisco |
|
1997 |
30 |
19 |
p. 471-476 6 p. |
artikel |
32 |
Capacity Models for Scheduling the Virtual Enterprise
|
Leach, Nick |
|
1997 |
30 |
19 |
p. 265-270 6 p. |
artikel |
33 |
Choice Criteria for Maintenance Policies: Application to Manufacturing System
|
Sassine, Chadi |
|
1997 |
30 |
19 |
p. 573-578 6 p. |
artikel |
34 |
Coloured Batches Petri Nets
|
Caradec, Muriel |
|
1997 |
30 |
19 |
p. 227-232 6 p. |
artikel |
35 |
Combining Discrete-Event Control and Simulation-Based Monitoring for Supervisory Functions
|
Feldmann, K. |
|
1997 |
30 |
19 |
p. 173-178 6 p. |
artikel |
36 |
Concept of a Learning Simulation System
|
Westkämper, E. |
|
1997 |
30 |
19 |
p. 549-554 6 p. |
artikel |
37 |
Configuration of Multiproduct Kanban Systems Using a Distributed Evolutionary Algorithm
|
Paris, J.L. |
|
1997 |
30 |
19 |
p. 167-172 6 p. |
artikel |
38 |
Configuring a Pull Production Control Strategy Through a Generic Model
|
Gaury, E.G.A. |
|
1997 |
30 |
19 |
p. 187-192 6 p. |
artikel |
39 |
Control of Flexible Job-Shop: Disturbances and Robustness
|
Fadil, A. |
|
1997 |
30 |
19 |
p. 13-18 6 p. |
artikel |
40 |
Control of Flexible Manufacturing System: Interaction Between Production and Transportation
|
Chetouane, F. |
|
1997 |
30 |
19 |
p. 103-108 6 p. |
artikel |
41 |
Control Robustness Towards Staying Time Constraints Applied to Food Distribution
|
Collart Dutilleul, S. |
|
1997 |
30 |
19 |
p. 49-54 6 p. |
artikel |
42 |
Design of Configuration and Control of Production System Using the Decision Making
|
Frankovič, B. |
|
1997 |
30 |
19 |
p. 501-506 6 p. |
artikel |
43 |
Design of Machines and Robots Endowed with Permanent Learning Ability for Integrated Production Systems
|
Sousa, João S.S. |
|
1997 |
30 |
19 |
p. 451-456 6 p. |
artikel |
44 |
Distributed Capacity Analysis for Proactive Planning in Semiconductor Virtual Enterprises
|
Teixeira, Evelin M.A. |
|
1997 |
30 |
19 |
p. 489-494 6 p. |
artikel |
45 |
Distributed Platforms for Shop Floor Communications: A Comparative Analysis
|
Santos, José P.O. |
|
1997 |
30 |
19 |
p. 457-463 7 p. |
artikel |
46 |
Dynamic Database Design for Disassembly Processes of Technical Consumer Products
|
Chevron, Didier |
|
1997 |
30 |
19 |
p. 561-566 6 p. |
artikel |
47 |
Electronic Data Interchange: Basis of a Virtual Enterprise
|
Biennier, F. |
|
1997 |
30 |
19 |
p. 97-102 6 p. |
artikel |
48 |
Expert-Coop: An Environment for Cognitive Multi-Agent Systems
|
Bittencourt, Guilherme |
|
1997 |
30 |
19 |
p. 387-392 6 p. |
artikel |
49 |
Flexible Laboratory Robotics System: Hardware and Software Overview
|
Díaz Cachero, M.C. |
|
1997 |
30 |
19 |
p. 613-616 4 p. |
artikel |
50 |
Flight Management Systems and Aircraft 4D Trajectory Optimization
|
Hagelauer, Patrick |
|
1997 |
30 |
19 |
p. 351-356 6 p. |
artikel |
51 |
Flowshop and Extensions
|
Finke, G. |
|
1997 |
30 |
19 |
p. 233-238 6 p. |
artikel |
52 |
Foreword
|
Binder, Zdenek |
|
1997 |
30 |
19 |
p. iv- 1 p. |
artikel |
53 |
Genetic Algorithms for Minimizing Tardiness on Parallel Machines with Setups
|
Amaral Armentano, Vinícius |
|
1997 |
30 |
19 |
p. 277-282 6 p. |
artikel |
54 |
Global Optimization of Energy and Production in Basic Industries: A Genetic Algorithm Application
|
Santos, Amâncio C. |
|
1997 |
30 |
19 |
p. 327-332 6 p. |
artikel |
55 |
Grippers/Components Integrated Coding System Towards Sustainable Industrial Production: Model
|
Imperio, E. |
|
1997 |
30 |
19 |
p. 465-470 6 p. |
artikel |
56 |
Grouping Economic Designs of Control Charts for Attributes and Closely Related Models
|
Turnes, Osiris |
|
1997 |
30 |
19 |
p. 589-594 6 p. |
artikel |
57 |
Hybrid Job-Shop Problem: A Two-Stage Approach
|
Penz, Bernard |
|
1997 |
30 |
19 |
p. 261-264 4 p. |
artikel |
58 |
Improvements in Third Party Logistics Services in Finland During 90's
|
Bask, Anu |
|
1997 |
30 |
19 |
p. 585-588 4 p. |
artikel |
59 |
Intelligent Monitoring of Public Transport Systems - Data Consistency Analysis -
|
Cunha, A. |
|
1997 |
30 |
19 |
p. 143-147 5 p. |
artikel |
60 |
Interactive Decision Support System Specification for a Semi-Automated Disassembly cell
|
Chevron, Didier |
|
1997 |
30 |
19 |
p. 567-572 6 p. |
artikel |
61 |
Logistics, Maintenance, Production in Virtual Manufacturing Enterprise
|
Descotes-Genon, B. |
|
1997 |
30 |
19 |
p. 67-72 6 p. |
artikel |
62 |
Lot Sizing and Scheduling in an Automated Casting Plant
|
Santos-Meza, Elisangela dos |
|
1997 |
30 |
19 |
p. 495-500 6 p. |
artikel |
63 |
Lower Bounds for a Practical Scheduling Problem
|
Cavalcante, Victor F. |
|
1997 |
30 |
19 |
p. 271-276 6 p. |
artikel |
64 |
Management and Control of Modern Manufacturing Organisations: An Interdisciplinary Approach
|
Vernadat, F. |
|
1997 |
30 |
19 |
p. 625-628 4 p. |
artikel |
65 |
Methodologies for Definition and Evaluation of Performance Measurement Systems
|
Durán, Orlando |
|
1997 |
30 |
19 |
p. 483-488 6 p. |
artikel |
66 |
Micromanipulation Sensor Structure: A New Approach
|
Arató, Péter |
|
1997 |
30 |
19 |
p. 607-611 5 p. |
artikel |
67 |
Modeling and Control of Supplier Relations
|
Arnold, D. |
|
1997 |
30 |
19 |
p. 161-165 5 p. |
artikel |
68 |
Modelling and Analysis of Complex Industrial Systems
|
Chapurlat, V. |
|
1997 |
30 |
19 |
p. 357-362 6 p. |
artikel |
69 |
Modelling Basic Discrete Event Systems - A Key Factor in Supporting the Representation and Analysis of Complex Production Systems
|
Bobeanu, Carmen-Veronica |
|
1997 |
30 |
19 |
p. 193-198 6 p. |
artikel |
70 |
Modelling Shop Scheduling of Parts with Transfer, Setup and Storage
|
Hoyos, Mario |
|
1997 |
30 |
19 |
p. 55-60 6 p. |
artikel |
71 |
Model of Planning in the Maintenance Information System
|
Majdandzic, N. |
|
1997 |
30 |
19 |
p. 37-41 5 p. |
artikel |
72 |
Network Operating Agents as Means for Decentralized Decision Support Systems
|
Dobrowolski, Grzegorz |
|
1997 |
30 |
19 |
p. 393-398 6 p. |
artikel |
73 |
Object Orientation and the Extended Planning Problem
|
Filip, F.G. |
|
1997 |
30 |
19 |
p. 399-404 6 p. |
artikel |
74 |
On Achievable Goals and Feasible Plans in Open Multi-Agent Systems
|
Sichman, Jaime Simão |
|
1997 |
30 |
19 |
p. 375-380 6 p. |
artikel |
75 |
On the Design of an Order Promise System for Virtual Enterprises
|
Azevedo, Américo |
|
1997 |
30 |
19 |
p. 79-84 6 p. |
artikel |
76 |
Optimal Feedback Control Scheme Helping Manager to Adjust Aggregate Industrial Resources
|
Silva Fo, O.S. |
|
1997 |
30 |
19 |
p. 333-338 6 p. |
artikel |
77 |
Paradigm Shift in the Corporation: The Fractal Company
|
Sihn, Wilfried |
|
1997 |
30 |
19 |
p. 131-136 6 p. |
artikel |
78 |
Path Critical Index and Activity Critical Index in PERT Networks
|
Fatemi Ghomi, S.M.T. |
|
1997 |
30 |
19 |
p. 517-521 5 p. |
artikel |
79 |
Planning Systems for Virtual Enterprises - Requirements and Prerequisites
|
Hovi, Antti |
|
1997 |
30 |
19 |
p. 7-11 5 p. |
artikel |
80 |
Preparation and Setting of the Production Concerning a Virtual Manufacturing in a Cooperative Work
|
Graton, Y. |
|
1997 |
30 |
19 |
p. 73-77 5 p. |
artikel |
81 |
Production Lines Modeling by Discrete / Continuous Aspect in Petri Nets
|
Demongodin, Isabel |
|
1997 |
30 |
19 |
p. 199-205 7 p. |
artikel |
82 |
Reactive Shop-Floor Control with a Multi-Agent System
|
Anciaux, D. |
|
1997 |
30 |
19 |
p. 425-430 6 p. |
artikel |
83 |
Real Time No-Wait In-Process Scheduling Flowshop Problems in Uncertain Environment
|
Bourgade, Vladimir |
|
1997 |
30 |
19 |
p. 289-294 6 p. |
artikel |
84 |
Real-Time Order Planning in Semiconductor Virtual Enterprises
|
Dudenhausen, H.-M. |
|
1997 |
30 |
19 |
p. 85-90 6 p. |
artikel |
85 |
Reinsertion Principles for Multi-Resource Shop Scheduling with Sequence-Dependent Setup Times
|
Artigues, Christian |
|
1997 |
30 |
19 |
p. 307-313 7 p. |
artikel |
86 |
Remote User Interfaces on the Internet for Machine Tool Monitoring
|
Goncharenko, Igor |
|
1997 |
30 |
19 |
p. 579-584 6 p. |
artikel |
87 |
Rhythmed Flow Shop : How to Balance the Daily Workload
|
Widmer, Marino |
|
1997 |
30 |
19 |
p. 245-248 4 p. |
artikel |
88 |
Scheduling on Uniform Processors: A New Interchange Heuristic
|
Müller, F.M. |
|
1997 |
30 |
19 |
p. 283-288 6 p. |
artikel |
89 |
Scheduling Tasks in Master-Slave Parallel Processing Systems
|
Błażewicz, Jacek |
|
1997 |
30 |
19 |
p. 255-260 6 p. |
artikel |
90 |
Scheduling Unrelated Parallel Machines for an Industrial Production-Distribution Problem
|
Flipo, Clarisse |
|
1997 |
30 |
19 |
p. 249-254 6 p. |
artikel |
91 |
Scheduling with Sequence-Dependent Setup Times and Early-Tardy Penalties
|
Santos, Hamilton C.M. |
|
1997 |
30 |
19 |
p. 239-244 6 p. |
artikel |
92 |
Semiconductor Virtual Enterprises: Requirements and Solution Proposals
|
Makatsoris, Charalampos |
|
1997 |
30 |
19 |
p. 431-438 8 p. |
artikel |
93 |
Shop Floor Control Engineering: A Model Based Approach
|
Pinto Ferreira, João José |
|
1997 |
30 |
19 |
p. 405-410 6 p. |
artikel |
94 |
Simulation and Control of Metal Alloys Solidification Process
|
Kluska-Nawarecka, Stanislawa |
|
1997 |
30 |
19 |
p. 523-527 5 p. |
artikel |
95 |
Smoothing Disturbances in Manufacturing Systems with Shelf Time Constraints
|
Aygalinc, Pascal |
|
1997 |
30 |
19 |
p. 43-48 6 p. |
artikel |
96 |
Software for Coloured Petri Nets Oriented to Flexible Manufacturing Systems
|
Lefranc, Gastón |
|
1997 |
30 |
19 |
p. 221-226 6 p. |
artikel |
97 |
Solving a Hoist Scheduling Problem as a Sequencing Problem
|
Caux, C. |
|
1997 |
30 |
19 |
p. 315-319 5 p. |
artikel |
98 |
Stochastic Scheduling - A Flow Shop No Wait Application and Solutions
|
Ferreira, |
|
1997 |
30 |
19 |
p. 345-350 6 p. |
artikel |
99 |
Structural Properties of a Class of Petri Nets
|
Amer-Yahia, C. |
|
1997 |
30 |
19 |
p. 215-220 6 p. |
artikel |
100 |
Supervisory Control for Synchronized and Colored Petri Nets Under Static and Dynamic Constraints
|
Godon, Alain |
|
1997 |
30 |
19 |
p. 207-213 7 p. |
artikel |
101 |
Supervisory Control: Towards a Proactive Attitude
|
Neubert, Gilles |
|
1997 |
30 |
19 |
p. 31-36 6 p. |
artikel |
102 |
Supervisory Synthesis Optimization for Timed Discrete Event Systems - Application to a Production System
|
Caramihai, S.I. |
|
1997 |
30 |
19 |
p. 179-185 7 p. |
artikel |
103 |
The Assessment of Residual Lifetime of Steel Structure by Means of the Off-Line System
|
Vincour, D. |
|
1997 |
30 |
19 |
p. 477-482 6 p. |
artikel |
104 |
The Basic Concept for the Production-Marketing Integration with Information Technology
|
Ota, Masaharu |
|
1997 |
30 |
19 |
p. 121-126 6 p. |
artikel |
105 |
The Computerization Level of Industries in the City of São Carlos
|
César Fernandes, Flávio |
|
1997 |
30 |
19 |
p. 595-600 6 p. |
artikel |
106 |
Tools for Design and Optimal Control of Production Line and Flexible Manufacturing Systems
|
Frankoviç, Baltazár |
|
1997 |
30 |
19 |
p. 439-444 6 p. |
artikel |
107 |
Using Simulation for the Analysis of a Real Industrial System
|
Martins, Carlos F. |
|
1997 |
30 |
19 |
p. 529-533 5 p. |
artikel |