nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adaptive Decoupling Control for the Deaerator Process in Thermal Power Plants
|
Huiming, Lu |
|
1997 |
30 |
17 |
p. 151-154 4 p. |
artikel |
2 |
Adaptive-Network-Based Fuzzy Inference System for Short Term Load Forecasting
|
Zhang, Xiao-Ping |
|
1997 |
30 |
17 |
p. 533-539 7 p. |
artikel |
3 |
A Dispatcher Training Simulator for ECPCC
|
Jianguo, Yao |
|
1997 |
30 |
17 |
p. 365-369 5 p. |
artikel |
4 |
Advanced Control of Superheater Steam Temperatures - An Evaluation Based on Practical Applications
|
Mølbak, Tommy |
|
1997 |
30 |
17 |
p. 161-166 6 p. |
artikel |
5 |
Advanced Power Plant Control for Large Load Changes and Disturbances
|
Rees, N.W. |
|
1997 |
30 |
17 |
p. 601-608 8 p. |
artikel |
6 |
A Fuzzy Set Algorithm for Three-Phase Distribution Network Reconfiguration
|
Lin, Whei-Min |
|
1997 |
30 |
17 |
p. 419-424 6 p. |
artikel |
7 |
A Hybrid Method for Transient Stability Analysis
|
Hong, Chen |
|
1997 |
30 |
17 |
p. 583-587 5 p. |
artikel |
8 |
A Method for Real-Time Transient Stability Emergency Control
|
Zhang, Y. |
|
1997 |
30 |
17 |
p. 633-638 6 p. |
artikel |
9 |
A Model- and Rule-Based Intelligent Alarm Processing System
|
Jingcheng, Chen |
|
1997 |
30 |
17 |
p. 497-501 5 p. |
artikel |
10 |
Analysis of coal Mill Dynamic Characteristics Under Normal and Abnormal Operating Conditions
|
Fan, G.Q. |
|
1997 |
30 |
17 |
p. 451-457 7 p. |
artikel |
11 |
Analysis of Power Flow Control Based on Flexible AC Transmission Systems
|
Yan, Xu |
|
1997 |
30 |
17 |
p. 207-212 6 p. |
artikel |
12 |
Analysis of the Yimin-Fengtun 500KV TCSC on the Northeast China Power System
|
Jun, Liang |
|
1997 |
30 |
17 |
p. 267-272 6 p. |
artikel |
13 |
An Approach to Single- or Multi-Topology Error Identification
|
Suquan, Zhou |
|
1997 |
30 |
17 |
p. 405-411 7 p. |
artikel |
14 |
A Neural Network Model for Predicting System Marginal Price in the UK Power Pool
|
Ramsay, B. |
|
1997 |
30 |
17 |
p. 527-532 6 p. |
artikel |
15 |
A New and Powerful Real Time Digital Transient Network Analyser
|
Devaux, O. |
|
1997 |
30 |
17 |
p. 353-358 6 p. |
artikel |
16 |
A New Cascade Multilevel Voltage Source Inverter for High Power Application of FACTS
|
Min, Wan-Ki |
|
1997 |
30 |
17 |
p. 279-284 6 p. |
artikel |
17 |
A New Method for Static Load Modeling Based on the Normal Operating Data and the Correlation Analysis Theory
|
Jian, Zhang |
|
1997 |
30 |
17 |
p. 311-316 6 p. |
artikel |
18 |
A New Tool for Dynamic Security Assessment of Power Systems
|
Xue, Y. |
|
1997 |
30 |
17 |
p. 563-568 6 p. |
artikel |
19 |
An On-Line Dynamic Security Assessment Implementation
|
Jing, C. |
|
1997 |
30 |
17 |
p. 577-582 6 p. |
artikel |
20 |
Another Discussion of the New Algorithm of Dynamic Optimal Dispatch - Accumulation Variable Method
|
Xueshan, Han |
|
1997 |
30 |
17 |
p. 97-103 7 p. |
artikel |
21 |
A Novel Simplified Approach to Estimate a Closest Voltage Collapse Margin
|
Haozhong, Cheng |
|
1997 |
30 |
17 |
p. 293-298 6 p. |
artikel |
22 |
Application of Two Modified Fast Fourier Transform Algorithms in Power System Harmonic Analysis
|
Gengyin, Li |
|
1997 |
30 |
17 |
p. 317-321 5 p. |
artikel |
23 |
A Practical Algorithm for Dynamic Optimal Dispatch
|
Yi, Pan |
|
1997 |
30 |
17 |
p. 131-135 5 p. |
artikel |
24 |
A Probabilistic Approach to the Design of Power System Protection Schemes Against Blackouts
|
Wehenkel, L. |
|
1997 |
30 |
17 |
p. 471-476 6 p. |
artikel |
25 |
Artificial Neural Network for Ultrashort-Term Load Forecasting
|
Feng, Wang |
|
1997 |
30 |
17 |
p. 541-544 4 p. |
artikel |
26 |
AUSTRAL, A Multi-Platform System for Alarm Processing and Decision Support System for Distribution Network Operation
|
Krivine, Jean-Paul |
|
1997 |
30 |
17 |
p. 485-490 6 p. |
artikel |
27 |
Author Index
|
|
|
1997 |
30 |
17 |
p. 663-664 2 p. |
artikel |
28 |
Computation of Generation Rejection in On-Line Dynamic Security Assessment Using a New Hybrid Method
|
Cheung, Kwok W. |
|
1997 |
30 |
17 |
p. 615-620 6 p. |
artikel |
29 |
Computerized Water Level Control System for System Generator of Qinshan Nuclear Power Plant
|
Lang, Wen-peng |
|
1997 |
30 |
17 |
p. 155-160 6 p. |
artikel |
30 |
Control of Power System Oscillations
|
|
|
1997 |
30 |
17 |
p. 75-83 9 p. |
artikel |
31 |
Control Systems of Hydropower Stations in China
|
Xiaoyu, Teng |
|
1997 |
30 |
17 |
p. 41-42 2 p. |
artikel |
32 |
Corrective Generation Rescheduling Based on Neural Network for Preventive Control
|
Saitoh, H. |
|
1997 |
30 |
17 |
p. 465-470 6 p. |
artikel |
33 |
Defense Plans: Economic Solutions for Improving the Security of Power Systems
|
Houry, M.P. |
|
1997 |
30 |
17 |
p. 621-626 6 p. |
artikel |
34 |
DPLFS (Digital Phase Locked Frequency Synthesizer) Used in the Individual Phase Voltage Control of ±300 KVAR ASVG
|
Qiang, Wang |
|
1997 |
30 |
17 |
p. 255-260 6 p. |
artikel |
35 |
Dynamic Interactions between Power, Plants and Power Systems
|
Welfonder, E. |
|
1997 |
30 |
17 |
p. 27-39 13 p. |
artikel |
36 |
Dynamic Load Modeling Principles and Feedback Neural Network Model
|
Jian, Zhang |
|
1997 |
30 |
17 |
p. 299-304 6 p. |
artikel |
37 |
Engineering Simulators for Fossil Power Plant
|
Neuman, P. |
|
1997 |
30 |
17 |
p. 343-351 9 p. |
artikel |
38 |
Enhancement of Electric Power System Transient Stability by Changing Network Configuration
|
WeiDong, Li |
|
1997 |
30 |
17 |
p. 477-483 7 p. |
artikel |
39 |
Evaluation of Technical and Economical Benefits of a Phase Shifting Transformer on the Interconnection between France and Spain
|
Alonso, J.F. |
|
1997 |
30 |
17 |
p. 219-228 10 p. |
artikel |
40 |
Fuzzy Control of Ball Mill for Pulverizing System of Thermal Power Plant
|
Jun, Cai |
|
1997 |
30 |
17 |
p. 177-181 5 p. |
artikel |
41 |
Fuzzy Model Based Control of Steam Generation in Drum-Boiler Power Plant
|
Cheng, C.M. |
|
1997 |
30 |
17 |
p. 143-149 7 p. |
artikel |
42 |
GPS Application for Synchronous Monitoring System at Multiple Location
|
Goto, T. |
|
1997 |
30 |
17 |
p. 509-514 6 p. |
artikel |
43 |
Highly Decentralized Solution of the Secondary Voltage Control Problem
|
Curk, J. |
|
1997 |
30 |
17 |
p. 63-68 6 p. |
artikel |
44 |
Hybrid Adaptive Nearest Neighbor Approaches to Dynamic Security Assessment
|
Houben, Isabelle |
|
1997 |
30 |
17 |
p. 645-650 6 p. |
artikel |
45 |
Hydro-Thermal System Transaction Analysis
|
Xiaomin, Bai |
|
1997 |
30 |
17 |
p. 551-556 6 p. |
artikel |
46 |
Implementation of On-Line Dynamic Security Assessment Program for Central China Power System
|
Fu, Shuti |
|
1997 |
30 |
17 |
p. 569-575 7 p. |
artikel |
47 |
Improved Maneuverability of Power Plants for Better Grid Stability and Economic Dispatch
|
Lausterer, Gerhard K. |
|
1997 |
30 |
17 |
p. 589-594 6 p. |
artikel |
48 |
Influence from Angle Control on the Dynamic Behaviour of Power Systems
|
Østrup, Torben |
|
1997 |
30 |
17 |
p. 241-245 5 p. |
artikel |
49 |
IN-PACT: A Pragmatic Approach Leading to a Smooth Transition or a New Architecture for Distribution Control Centers
|
Lambert, Eric |
|
1997 |
30 |
17 |
p. 431-437 7 p. |
artikel |
50 |
Integrated Approach to Developing Effective Control Strategies for Power System Voltage Stability Enhancement
|
Wan, H.B. |
|
1997 |
30 |
17 |
p. 285-291 7 p. |
artikel |
51 |
Intelligent Engineering and Its Applications in Power Engineering in China
|
Hu, Z.G. |
|
1997 |
30 |
17 |
p. 651-656 6 p. |
artikel |
52 |
Investigation of the Effect of Series Compensation on Fault Location for EHV Transmission Lines
|
Al-Dabbagh, M. |
|
1997 |
30 |
17 |
p. 491-495 5 p. |
artikel |
53 |
Load Flow Calculation for Flexible AC Transmission Systems
|
Liyi, Chen |
|
1997 |
30 |
17 |
p. 203-206 4 p. |
artikel |
54 |
Maintaining a Predefined Power Supply Reliability Level at Minimized System Fuel Costs
|
Hoese, F. |
|
1997 |
30 |
17 |
p. 91-96 6 p. |
artikel |
55 |
Modelling and Identification for River Control
|
Sohlberg, B. |
|
1997 |
30 |
17 |
p. 323-328 6 p. |
artikel |
56 |
Modelling Boiler Response to Co-Ordinate Reserve in Isolated Power Systems
|
Flynn, Meadhbh |
|
1997 |
30 |
17 |
p. 439-444 6 p. |
artikel |
57 |
Modelling the Fuel Consumption in a CHP Plant
|
Zhao, H. |
|
1997 |
30 |
17 |
p. 445-450 6 p. |
artikel |
58 |
Mutual Backup Between SCADA System in Hokkaido Electric Power Company
|
Tsuruma, T. |
|
1997 |
30 |
17 |
p. 515-519 5 p. |
artikel |
59 |
Neural Network Based Water Inflow Forecasting
|
Golob, R. |
|
1997 |
30 |
17 |
p. 329-333 5 p. |
artikel |
60 |
Neural Network SVS Gain Scheduling for Improving Power Systems Stability
|
Chang, C.S. |
|
1997 |
30 |
17 |
p. 377-382 6 p. |
artikel |
61 |
New Autonomous Load-Shedding Scheme Based on Local Information
|
Fujita, Goro |
|
1997 |
30 |
17 |
p. 459-464 6 p. |
artikel |
62 |
New Control Strategies for Utilizing Power System Network more Effectively
|
Christensen, Jørgen Falck |
|
1997 |
30 |
17 |
p. 9-22 14 p. |
artikel |
63 |
New Frequency and Power Oscillations in the Enlarged Westeuropean Interconnected Network Reasons and Counter Measures
|
Weber, H.W. |
|
1997 |
30 |
17 |
p. 85-90 6 p. |
artikel |
64 |
New Technical Solutions for the Control Centre
|
van Son, Paul |
|
1997 |
30 |
17 |
p. 23-26 4 p. |
artikel |
65 |
New Trends and Requirements for Dynamic Security Assessment
|
Meyer, Bruno |
|
1997 |
30 |
17 |
p. 557-562 6 p. |
artikel |
66 |
Nonlinear Optimal Excitation Control of Dual-Excited Synchronous Generators
|
Jian, Huang |
|
1997 |
30 |
17 |
p. 69-74 6 p. |
artikel |
67 |
Novel Algorithms on Economic Dispatch with Integrating Type Constraint
|
Xia, Qing |
|
1997 |
30 |
17 |
p. 117-122 6 p. |
artikel |
68 |
On-Line Modeling for Emergency Control Systems
|
Kojima, Yasuhiro |
|
1997 |
30 |
17 |
p. 627-632 6 p. |
artikel |
69 |
On-Line Transient Stability Assessment with EEAC
|
Xue, Y. |
|
1997 |
30 |
17 |
p. 43-47 5 p. |
artikel |
70 |
Operational Experience of Age and Suggestions for the Coming Regional Interconnections in China
|
Xiaomeng, Lei |
|
1997 |
30 |
17 |
p. 503-507 5 p. |
artikel |
71 |
Optimal Secure and Economical Dispatching by Using Off-Line Neural Networks
|
Menniti, D. |
|
1997 |
30 |
17 |
p. 111-116 6 p. |
artikel |
72 |
Optimization of Boiler Control for Improvement of Load Following Capabilities of Existing Power Plants
|
Mortensen, Jan H. |
|
1997 |
30 |
17 |
p. 137-142 6 p. |
artikel |
73 |
Optimization of Large Scale Distribution Systems in Normal and Emergency State for Real Time Application
|
Gotzigi, B. |
|
1997 |
30 |
17 |
p. 425-430 6 p. |
artikel |
74 |
Optimization Strategy for Analysis of Power System Problems
|
Lei, Xianzhang |
|
1997 |
30 |
17 |
p. 105-110 6 p. |
artikel |
75 |
Overview of Intelligent Systems Applications in Power Systems
|
Germond, A. |
|
1997 |
30 |
17 |
p. 657-662 6 p. |
artikel |
76 |
Parameter Estimation with Interacting Bad Data in State Estimation
|
Yang, Chun-Ling |
|
1997 |
30 |
17 |
p. 399-404 6 p. |
artikel |
77 |
Power Approach for Harmonic Analysis of Power Systems Including Thyristor Controlled Reactors
|
Manescu, Leonardo Geo |
|
1997 |
30 |
17 |
p. 247-254 8 p. |
artikel |
78 |
Power Electronic Equipment for Increasing Capability of Transmission Links in Interconnected Power Systems
|
Lei, Xianzhang |
|
1997 |
30 |
17 |
p. 235-240 6 p. |
artikel |
79 |
Power Frequency Control of a Pump Turbine as an Example for the Operation with Adjustable Speed of Hydraulic Machines
|
Harbort, T. |
|
1997 |
30 |
17 |
p. 335-341 7 p. |
artikel |
80 |
Power Plant Dynamics Simulations Considering Interaction with Power System
|
Ichikawa, Tatsumi |
|
1997 |
30 |
17 |
p. 595-600 6 p. |
artikel |
81 |
Power System Stabilizer Design Based on Structured Singular Values
|
Yang, T.C. |
|
1997 |
30 |
17 |
p. 371-376 6 p. |
artikel |
82 |
Practical Evaluation of Operational Topology Optimization for Loss Reduction in High Voltage Grids
|
Fritz, Wolfgang |
|
1997 |
30 |
17 |
p. 123-129 7 p. |
artikel |
83 |
Practically Negative Effects of Emergency Controls
|
Xue, Y. |
|
1997 |
30 |
17 |
p. 609-614 6 p. |
artikel |
84 |
Robust Generator Control with Constrained Control Design
|
Sabzevary, Alireza Sanai |
|
1997 |
30 |
17 |
p. 383-388 6 p. |
artikel |
85 |
SCADA-Oriented State Estimation
|
Beiβler, G. |
|
1997 |
30 |
17 |
p. 413-418 6 p. |
artikel |
86 |
Scheduling Control of Deaerator Plant
|
Lu, C.X. |
|
1997 |
30 |
17 |
p. 183-189 7 p. |
artikel |
87 |
Sensitivity Based Detennination of Suitable Locations for Controlled Series Compensation for Enhancement of Steady State Stability in a Large Power System
|
Subhash, Sujatha |
|
1997 |
30 |
17 |
p. 273-278 6 p. |
artikel |
88 |
Special Features of the Operator Training Simulator for Coal-Fired Power Plant
|
Yuanchao, Xie |
|
1997 |
30 |
17 |
p. 359-363 5 p. |
artikel |
89 |
Static Var Generators with GTOS for Innovative Windfarm Operation
|
Bergmann, K. |
|
1997 |
30 |
17 |
p. 49-54 6 p. |
artikel |
90 |
Studies on a New Kind of Fuzzy Power System Stabilizer
|
Baohua, Li |
|
1997 |
30 |
17 |
p. 389-397 9 p. |
artikel |
91 |
Studies on the Possibility of Applying Artificial Neural Networks to Estimate Real Time Operation Parameters of Power Systems
|
Chen, Shen |
|
1997 |
30 |
17 |
p. 305-309 5 p. |
artikel |
92 |
Study on Prototype Unified Power Flow Controller and Its Coordinated Control
|
Lanyin, Li |
|
1997 |
30 |
17 |
p. 197-202 6 p. |
artikel |
93 |
Synthesis of Advanced Mill Control
|
O'Kelly, P.A. |
|
1997 |
30 |
17 |
p. 171-176 6 p. |
artikel |
94 |
Techniques for Emergency Control of Power Systems and Their Implementation
|
Kundur, P. |
|
1997 |
30 |
17 |
p. 639-644 6 p. |
artikel |
95 |
The Application of EDPF-300TM Integrated Distributed Intelligent Control System in Power Plant Monitoring and Control
|
Lixin, Ren |
|
1997 |
30 |
17 |
p. 167-170 4 p. |
artikel |
96 |
The Auto-Disturbances Rejection Control of TCSC
|
Zhang, Cai |
|
1997 |
30 |
17 |
p. 261-265 5 p. |
artikel |
97 |
The Comprehensive Dispatch Automation Project of Beijing Power System and the Integrated EMS SD - 6000E
|
Jin, Z. |
|
1997 |
30 |
17 |
p. 521-526 6 p. |
artikel |
98 |
The Electric Power System in China: Rapid Development Calls for Advanced Technologies
|
Wang, Ping-Yang |
|
1997 |
30 |
17 |
p. 1-7 7 p. |
artikel |
99 |
The Problems and Countermeasures in Process for Improving Automatic Level of Large Capacity Thermal Power Station
|
Jian-Ping, Zheng |
|
1997 |
30 |
17 |
p. 191-195 5 p. |
artikel |
100 |
The Problems of Transformer Automatic Control for Voltage Levels and Reactive Power Flow Regulation in Electrical Power System
|
Szczerba, Zbigniew |
|
1997 |
30 |
17 |
p. 55-61 7 p. |
artikel |
101 |
Transient Stability Improvement of Multi-Machine Power Systems Using On-Line Fuzzy Control of SMES
|
Sadeghzadeh, S.M. |
|
1997 |
30 |
17 |
p. 229-234 6 p. |
artikel |
102 |
Unified Power Flow Controller Impact on the Relays in a Power System
|
Lombard, X. |
|
1997 |
30 |
17 |
p. 213-218 6 p. |
artikel |
103 |
Unit Commitment for a Power System with Pumped Storage Units
|
Walsh, Michael P. |
|
1997 |
30 |
17 |
p. 545-550 6 p. |
artikel |