nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Comprehensive Approach for Planning and Control in Manufacturing Systems
|
Janusz, B. |
|
1997 |
30 |
1 |
p. 81-86 6 p. |
artikel |
2 |
Adaptive SFC Based Algorithm on Flexible Production Systems
|
Ferreiro Garcia, R. |
|
1997 |
30 |
1 |
p. 209-212 4 p. |
artikel |
3 |
Advanced Technique for Manufacturing System Management
|
D'Angelo, Andrea |
|
1997 |
30 |
1 |
p. 151-156 6 p. |
artikel |
4 |
Advances in Manufacturing Algebra: Discrete-Event Dynamic Models of Production Processes
|
Donati, F. |
|
1997 |
30 |
1 |
p. 267-272 6 p. |
artikel |
5 |
A Framework for Simulation Model Management
|
Hollocks, Brian W. |
|
1997 |
30 |
1 |
p. 75-80 6 p. |
artikel |
6 |
A Generic Model for Control of Hierarchical Multi-Level Production Systems
|
Chen, D. |
|
1997 |
30 |
1 |
p. 203-208 6 p. |
artikel |
7 |
A Heuristic Approach for Process Modelling
|
Settineri, Luca |
|
1997 |
30 |
1 |
p. 339-344 6 p. |
artikel |
8 |
A Hierarchical Approach to an FMS Scheduling Problem
|
Nicolich, Marino |
|
1997 |
30 |
1 |
p. 145-150 6 p. |
artikel |
9 |
A Model for Managing Innovation Programs in Manufacturing Plants
|
Villa, Agostino |
|
1997 |
30 |
1 |
p. 1-8 8 p. |
artikel |
10 |
An Algorithm for Scheduling Tasks on Moving Executors in Complex Operation System
|
Józefczyk, Jerzy |
|
1997 |
30 |
1 |
p. 133-138 6 p. |
artikel |
11 |
A Network-Based Manufacturing Management System
|
Mezgár, István |
|
1997 |
30 |
1 |
p. 169-174 6 p. |
artikel |
12 |
An Optimal Control Chart for Non-Normal Processes
|
Duclos, Emmanuel |
|
1997 |
30 |
1 |
p. 237-242 6 p. |
artikel |
13 |
A Process Oriented Method for the Reuse of CIM Models
|
Janusz, B. |
|
1997 |
30 |
1 |
p. 219-224 6 p. |
artikel |
14 |
A Real Time Cost Monitoring System for Business Process Reengineering
|
Macedo, Julio |
|
1997 |
30 |
1 |
p. 411-416 6 p. |
artikel |
15 |
A Robust Control Design for Mineral Processing Plant
|
Yahmedi, S. |
|
1997 |
30 |
1 |
p. 249-255 7 p. |
artikel |
16 |
Author Index
|
|
|
1997 |
30 |
1 |
p. 459-460 2 p. |
artikel |
17 |
Case-Based Fault Detection - A Method for Parallel Processing
|
Ariton, Viorel |
|
1997 |
30 |
1 |
p. 441-446 6 p. |
artikel |
18 |
Characteristic Figures for Control of Distribution Processes
|
Kopacek, P. |
|
1997 |
30 |
1 |
p. 453-457 5 p. |
artikel |
19 |
CIMOSA and its Application in an ISO 9000 Process Model
|
Zelm, M. |
|
1997 |
30 |
1 |
p. 285-290 6 p. |
artikel |
20 |
Computer Peripheral Device for Modelling 3D Objects in a CAD Environment
|
Acosta, Nelson |
|
1997 |
30 |
1 |
p. 225-230 6 p. |
artikel |
21 |
Conceptual Modelling in Generic Prototyping Approach
|
Neagu, Gabriel |
|
1997 |
30 |
1 |
p. 345-350 6 p. |
artikel |
22 |
Controllability of Nonlinear 2-D Systems
|
Jerzy, Klamka |
|
1997 |
30 |
1 |
p. 185-189 5 p. |
artikel |
23 |
Cooperative Enterprise Platform
|
Pereira, Francisco Edeneziano Dantas |
|
1997 |
30 |
1 |
p. 291-296 6 p. |
artikel |
24 |
Critical Path Concept for Multi-Tool Cutting Processes Optimization
|
Szadkowski, J. |
|
1997 |
30 |
1 |
p. 393-398 6 p. |
artikel |
25 |
Customized Fuzzy Logic Controller Generator
|
Acosta, Nelson |
|
1997 |
30 |
1 |
p. 87-92 6 p. |
artikel |
26 |
Design Method on Optimal Flexible Manufacturing Systems
|
Ferreiro, Garcia R. |
|
1997 |
30 |
1 |
p. 263-266 4 p. |
artikel |
27 |
Design of Discrete Event Control System for IEC1131-3 compatible PLCS
|
Karimzadgan, D. |
|
1997 |
30 |
1 |
p. 99-104 6 p. |
artikel |
28 |
Design of Flexible Manufacturing Systems with Reuse in a KB Simulation Environment
|
Kovács, George L. |
|
1997 |
30 |
1 |
p. 363-368 6 p. |
artikel |
29 |
Design of Post-Process Quality-Control for the Turning-Process
|
Sawodny, O. |
|
1997 |
30 |
1 |
p. 243-248 6 p. |
artikel |
30 |
Design Recovery for PLC-Controlled Manufacturing Systems
|
Jarvis, Jacqueline |
|
1997 |
30 |
1 |
p. 105-110 6 p. |
artikel |
31 |
Developing and Linking the Tool Database for Tool Management in FMS
|
Rahman, Mahbubur |
|
1997 |
30 |
1 |
p. 175-178 4 p. |
artikel |
32 |
Developing an Object-Oriented Reference Model for Manufacturing
|
Chalmeta, Ricardo |
|
1997 |
30 |
1 |
p. 351-356 6 p. |
artikel |
33 |
Development of a Computationally Efficient Process Simulation for Laser Drilling
|
Cazzoli, Riccardo |
|
1997 |
30 |
1 |
p. 405-410 6 p. |
artikel |
34 |
Development of a Process-Management and Information System (PMIS)
|
Reimann, Michael |
|
1997 |
30 |
1 |
p. 121-126 6 p. |
artikel |
35 |
2D Systems Analysis: A Polynomial Approach
|
Fornasini, E. |
|
1997 |
30 |
1 |
p. 179-184 6 p. |
artikel |
36 |
Expert System for FMS Scheduling Based on the Reverse Scheduling Method
|
Somlo, J. |
|
1997 |
30 |
1 |
p. 139-144 6 p. |
artikel |
37 |
Fuzzy-Adaptation of PI-Controllers for Pneumatic Servo-Drives
|
Berger, Michael |
|
1997 |
30 |
1 |
p. 93-98 6 p. |
artikel |
38 |
Heterarchical Control Systems for Production Cells - A Case Study
|
van de Mortel-Fronczak, J.M. |
|
1997 |
30 |
1 |
p. 213-218 6 p. |
artikel |
39 |
Implementation of a Dynamic Control System for SCARA Robot
|
Lee, Jang M. |
|
1997 |
30 |
1 |
p. 297-302 6 p. |
artikel |
40 |
Implementation of a Real-Time Adaptive Controller for Robotic Manipulator Using DSP's
|
Han, S.H. |
|
1997 |
30 |
1 |
p. 303-308 6 p. |
artikel |
41 |
Implementation of Communicating Sequential Processes for Distributed Robot System Architectures
|
Yasuda, Gen'ichi |
|
1997 |
30 |
1 |
p. 321-326 6 p. |
artikel |
42 |
Integrated and Reactive Part Routing Policies for Manufacturing Systems
|
Larnac, Mireille |
|
1997 |
30 |
1 |
p. 417-422 6 p. |
artikel |
43 |
Integrated and Reactive Part Routing Policies for Manufacturing Systems
|
Hennet, Jean-Claude |
|
1997 |
30 |
1 |
p. 423-428 6 p. |
artikel |
44 |
Knowledge-Based Tool for Instrumentation's Maintenance on a Data Acquisition
|
Pinastiko, Widrianto Sih |
|
1997 |
30 |
1 |
p. 157-161 5 p. |
artikel |
45 |
Management of Changes and Disturbances in Manufacturing Systems
|
Monostori, L. |
|
1997 |
30 |
1 |
p. 27-38 12 p. |
artikel |
46 |
Manufacturing Enterprise Modeling with PERA and CIMOSA
|
Kosanke, K. |
|
1997 |
30 |
1 |
p. 273-278 6 p. |
artikel |
47 |
Manufacturing System in the Micro Domain: Microrobotics
|
Felső, Gábor |
|
1997 |
30 |
1 |
p. 327-331 5 p. |
artikel |
48 |
Markov Processes Application for Estimation of Parameters of Assembly Lines
|
Kałuski, Jan |
|
1997 |
30 |
1 |
p. 53-56 4 p. |
artikel |
49 |
Measurement of Three-Dimensional Shape of Ingot at Forging Press Machine
|
Sun, X. |
|
1997 |
30 |
1 |
p. 399-404 6 p. |
artikel |
50 |
Modeling Methodology for Systems with Ambiguity and Uncertainty
|
Imasaki, Naoki |
|
1997 |
30 |
1 |
p. 381-386 6 p. |
artikel |
51 |
Modelling of the Leavening Process in a Continuous Bread-Making Industrial Plant Using Neural Networks
|
Ferroni, A. |
|
1997 |
30 |
1 |
p. 47-52 6 p. |
artikel |
52 |
Modular Control System for FMS for Prismatic Workpieces
|
Rahman, Mahbubur |
|
1997 |
30 |
1 |
p. 257-261 5 p. |
artikel |
53 |
Multimedia Requirements for Management and Control of Manufacturing Systems
|
Haidegger, Géza |
|
1997 |
30 |
1 |
p. 111-116 6 p. |
artikel |
54 |
Nonlinear Roesser Problem with a Terminal Condition. Maximum Principle
|
Idczak, Dariusz |
|
1997 |
30 |
1 |
p. 197-202 6 p. |
artikel |
55 |
On the Recent Advances in Grafcet
|
Zaytoon, J. |
|
1997 |
30 |
1 |
p. 387-392 6 p. |
artikel |
56 |
Preface
|
Kopacek, P. |
|
1997 |
30 |
1 |
p. iv- 1 p. |
artikel |
57 |
Production Planning Support System of Repair Parts for Home Electric Appliances
|
Oishi, Tetsuji |
|
1997 |
30 |
1 |
p. 117-119 3 p. |
artikel |
58 |
Proposition of a Methodology for a Physio-Economic Product Evaluation, Starting at the Design Phase, and Based on a Double Modelling of the Firm
|
Raviart, D. |
|
1997 |
30 |
1 |
p. 447-451 5 p. |
artikel |
59 |
Prototype for Decentralized Computer Assisted Budgeting for Large Networked Enterprises
|
Grobe, Johannes |
|
1997 |
30 |
1 |
p. 315-319 5 p. |
artikel |
60 |
Regularization of a Singular 2-D Roesser Model by Output-Feedback
|
Tadeusz, Kaczorek |
|
1997 |
30 |
1 |
p. 9-13 5 p. |
artikel |
61 |
Regulation of GMA Welding Process Features Using Neural Adaptive Control
|
Tzafestas, S.G. |
|
1997 |
30 |
1 |
p. 39-45 7 p. |
artikel |
62 |
Simulating a Manufacturing Enterprise Using Integrated Process Models
|
Chan, Albert W. |
|
1997 |
30 |
1 |
p. 369-374 6 p. |
artikel |
63 |
Simulation and Exploitation of the Dynamic Bond Graph Model of the RTX Robot
|
Koubaa, M.L. |
|
1997 |
30 |
1 |
p. 333-338 6 p. |
artikel |
64 |
Simulation and Novel Control Techniques for Re-Engineering Purposes
|
Gödri, I. |
|
1997 |
30 |
1 |
p. 375-380 6 p. |
artikel |
65 |
Simulation Studies of Physical Distribution Systems for Airports
|
Ozaki, Kenji |
|
1997 |
30 |
1 |
p. 357-362 6 p. |
artikel |
66 |
Some Problems of Modelling the Complex Material Flow System
|
Zrnić, Đorđe N. |
|
1997 |
30 |
1 |
p. 429-434 6 p. |
artikel |
67 |
Structural Modelling with Petri Nets
|
Bluemke, Ilona |
|
1997 |
30 |
1 |
p. 63-68 6 p. |
artikel |
68 |
Temporal Management in Communication Models: ATM Case Study
|
Lorenz, P. |
|
1997 |
30 |
1 |
p. 127-132 6 p. |
artikel |
69 |
The CIMOSA Enterprise Modelling Ontology
|
Heulluy, B. |
|
1997 |
30 |
1 |
p. 279-284 6 p. |
artikel |
70 |
The HIMAC Project: Hierarchical Management and Control in Manufacturing Systems
|
Canuto, E. |
|
1997 |
30 |
1 |
p. 309-314 6 p. |
artikel |
71 |
The Potential of Tool Integration for Plant Floor Solutions
|
Mosca, Roberto |
|
1997 |
30 |
1 |
p. 163-167 5 p. |
artikel |
72 |
The Resultant Matrix for a Family of Two-Variable Polynomials
|
Galkowski, Krzysztof |
|
1997 |
30 |
1 |
p. 191-196 6 p. |
artikel |
73 |
The Role of Models in Future Enterprises
|
Rembold, U. |
|
1997 |
30 |
1 |
p. 15-25 11 p. |
artikel |
74 |
Tooling Configuration in FMS: An Analytical Model for Performance Evaluation
|
Colosim, B.M. |
|
1997 |
30 |
1 |
p. 435-440 6 p. |
artikel |
75 |
Transforming APNC into IEC 1131-3 Instruction Lists Using the TPL Methodology
|
Jones, A.H. |
|
1997 |
30 |
1 |
p. 57-62 6 p. |
artikel |
76 |
Using P-Time Petri Nets for Robust Control of Manufacturing Systems
|
Aygalinc, Pascal |
|
1997 |
30 |
1 |
p. 69-74 6 p. |
artikel |
77 |
Using the Analytic Hierarchy Process in Computer Integrated Manufacturing
|
Nishibori, Yukiko |
|
1997 |
30 |
1 |
p. 231-236 6 p. |
artikel |