nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Achieving Application Independence on the Shop Floor
|
Andersson, N. |
|
1992 |
25 |
31 |
p. 215-220 6 p. |
artikel |
2 |
A Computational Environment to Evaluate FMS Based on Analytical and Simulation Models
|
Silva F°, O.S. |
|
1992 |
25 |
31 |
p. 163-167 5 p. |
artikel |
3 |
Activity Based Product Cost Calculation of Hot Rolled Steel Plates
|
Pesonen, L. |
|
1992 |
25 |
31 |
p. 81-84 4 p. |
artikel |
4 |
A Holistic Control Philosophy for the Process Industries
|
Kess, P. |
|
1992 |
25 |
31 |
p. 89-98 10 p. |
artikel |
5 |
A Modelling Framework for Integrated Factory Automation
|
Littover, M.C. |
|
1992 |
25 |
31 |
p. 23-28 6 p. |
artikel |
6 |
A Model to Integrate Expert Knowledge for the Design of Process Planning
|
Chep, A. |
|
1992 |
25 |
31 |
p. 47-52 6 p. |
artikel |
7 |
An On-Line Expert Scheduling System for FMS
|
Le, Weiliang |
|
1992 |
25 |
31 |
p. 181-186 6 p. |
artikel |
8 |
An OS-Based Reference Structure for Generic Control Software of FMS
|
Haoxun, Chen |
|
1992 |
25 |
31 |
p. 29-33 5 p. |
artikel |
9 |
An Overview of Knowledge-Based Industrial Scheduling
|
Hindi, K.S. |
|
1992 |
25 |
31 |
p. 1-22 22 p. |
artikel |
10 |
Automation of Self-Recovery Resource Allocation Procedures Synthesis in FMS
|
Wójcik, R. |
|
1992 |
25 |
31 |
p. 127-132 6 p. |
artikel |
11 |
CIM in Continuous and Discrete Manufacturing: Object-Oriented Generic Modelling
|
Filip, F.G. |
|
1992 |
25 |
31 |
p. 53-58 6 p. |
artikel |
12 |
CIM Information Management System: An Express-Based Integration Platform
|
Camarinha-Matos, L.M. |
|
1992 |
25 |
31 |
p. 103-108 6 p. |
artikel |
13 |
Combining the Flow Control Techniques with High-Level Petri Nets Methodologies for Real-Time Control of FMS
|
Jacot, Laurent |
|
1992 |
25 |
31 |
p. 133-138 6 p. |
artikel |
14 |
Computer Integrated Quality System in CIMS
|
Jian, L.K. |
|
1992 |
25 |
31 |
p. 187-192 6 p. |
artikel |
15 |
Dependence and Independence in Flexible Production
|
Mattila, Veli-Pekka J. |
|
1992 |
25 |
31 |
p. 99-102 4 p. |
artikel |
16 |
Development of a Strategically Flexible and Competitive Production Network for Metal Industries
|
Myllylä, J. |
|
1992 |
25 |
31 |
p. 157-162 6 p. |
artikel |
17 |
Dynamic Job-Shop Scheduling in CIM: A Novel Expert System Approach
|
Bezirgan, A. |
|
1992 |
25 |
31 |
p. 175-179 5 p. |
artikel |
18 |
Effects of the Flexible Automation and the New Legislation of the Book Keeping of Inventories on the Product Cost Accounting
|
Takala, J. |
|
1992 |
25 |
31 |
p. 153-155 3 p. |
artikel |
19 |
E-LOT Process Development Tool Based on Systematic Quality Analysis
|
Mieskonen, J. |
|
1992 |
25 |
31 |
p. 209-214 6 p. |
artikel |
20 |
Generation of a Parallel Computing Platform for Distributed Manipulation Environment
|
Tuominen, J. |
|
1992 |
25 |
31 |
p. 221-226 6 p. |
artikel |
21 |
GT Based Heuristic Approach for Machine Loading and Batch Formation in Flexible Manufacturing Systems
|
Kato, K. |
|
1992 |
25 |
31 |
p. 109-114 6 p. |
artikel |
22 |
Harmonization of Decentralized, Autonomous Production Areas
|
Hirsch, B.E. |
|
1992 |
25 |
31 |
p. 69-74 6 p. |
artikel |
23 |
Improvements in the Management of Quality Costs by An Integrated Personal Computer System
|
Taijala, B. |
|
1992 |
25 |
31 |
p. 193-196 4 p. |
artikel |
24 |
Industrial Control Systems for CIM
|
Ericsson, Göran |
|
1992 |
25 |
31 |
p. 147-151 5 p. |
artikel |
25 |
Integrated Computer Systems in the Metallurgical Plant of Voest Alpine at Donawitz
|
Kellermayr, Karl H. |
|
1992 |
25 |
31 |
p. 75-80 6 p. |
artikel |
26 |
Manufacturing Planning by Network Flow Model with Side Constraints
|
Carvalho, M.F. |
|
1992 |
25 |
31 |
p. 169-173 5 p. |
artikel |
27 |
Mill-Wide On-Line Simulation and Analysis of Quality Variations on Papermaking Processes
|
Holmström, K. |
|
1992 |
25 |
31 |
p. 203-208 6 p. |
artikel |
28 |
Optimal Scheduling and Energy Management in Industrial Complexes: Some New Results and Proposals
|
Correia, António Dourado |
|
1992 |
25 |
31 |
p. 139-145 7 p. |
artikel |
29 |
Optimization of Discrete Event Systems Modelling Multiproduction Processes
|
Di Febbraro, A. |
|
1992 |
25 |
31 |
p. 41-45 5 p. |
artikel |
30 |
Principles for Concurrent Quality Assurance and Maintenance Control in Manufacturing
|
Sandberg, U. |
|
1992 |
25 |
31 |
p. 197-202 6 p. |
artikel |
31 |
Prismatic Parts Automatic Coding for Group Technology
|
Belarbia, S.R. |
|
1992 |
25 |
31 |
p. 227-231 5 p. |
artikel |
32 |
Problems of Process Flow Feasibility in FAS
|
Roszkowska, E. |
|
1992 |
25 |
31 |
p. 115-120 6 p. |
artikel |
33 |
Rough Modelling Methodology for Plant Projects
|
Savolainen, Tapani |
|
1992 |
25 |
31 |
p. 59-67 9 p. |
artikel |
34 |
Scheduling a Flow Shop to Minimize the Maximal Lateness Under Arbitrary Precedence Constraints
|
Józefowska, Joanna |
|
1992 |
25 |
31 |
p. 121-126 6 p. |
artikel |
35 |
Software Development for Programmable Logic Controllers - A Methodology and a System
|
De Oliveira, J.P. Estima |
|
1992 |
25 |
31 |
p. 233-238 6 p. |
artikel |
36 |
Toward a Theory of Integrated Modelling
|
Denis, B. |
|
1992 |
25 |
31 |
p. 35-40 6 p. |
artikel |
37 |
Towards a New System Concept in the Paper Production Automation
|
Smolander, A. |
|
1992 |
25 |
31 |
p. 85-88 4 p. |
artikel |