nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAD Based Vision System for Identifying Industrial Workpieces
|
Sanfeliu, A. |
|
1990 |
23 |
3 |
p. 599-604 6 p. |
artikel |
2 |
A Computer Integrated Manufacturing System for Sheet Metal Forming
|
Tisza, M. |
|
1990 |
23 |
3 |
p. 315-320 6 p. |
artikel |
3 |
A Criterion for the Optimal Placement of Robotic Manipulators
|
Pámanes-García, J.A. |
|
1990 |
23 |
3 |
p. 149-153 5 p. |
artikel |
4 |
A Decentralized On-Line Scheduling Strategy for FMS
|
Engell, S. |
|
1990 |
23 |
3 |
p. 437-443 7 p. |
artikel |
5 |
A Knowledge-Based Approach to Process Planning: A Case Study
|
Nealon, J.L. |
|
1990 |
23 |
3 |
p. 559-564 6 p. |
artikel |
6 |
A Knowledge Based Environment for Artificial Intelligence Modeling of Industrial Problems: Preliminary Concepts
|
Cuena, J. |
|
1990 |
23 |
3 |
p. 281-285 5 p. |
artikel |
7 |
A Knowledge Representation Environment for Manufacturing Control Systems Design and Prototyping
|
Muro, P.R. |
|
1990 |
23 |
3 |
p. 471-475 5 p. |
artikel |
8 |
A Modular Approach to Sensor Integration in Robotic Assembly
|
Rowland, J.J. |
|
1990 |
23 |
3 |
p. 371-376 6 p. |
artikel |
9 |
An Abstract Data Type for Fault Tolerant Control Algorithms in Manufacturing Systems
|
Andreasson, S.A. |
|
1990 |
23 |
3 |
p. 51-56 6 p. |
artikel |
10 |
An Adaptation of the Blackboard Model for the Modelling of the Know-How of the Expert in an Automation Engineering Workstation
|
Pouget, J.P. |
|
1990 |
23 |
3 |
p. 565-570 6 p. |
artikel |
11 |
An Approach to the Footwear Assembly Automatic System
|
Aracil, R. |
|
1990 |
23 |
3 |
p. 33-38 6 p. |
artikel |
12 |
An Approach to the Simulation for FMS Design and Cost Analysis
|
Milacic, V.R. |
|
1990 |
23 |
3 |
p. 251-255 5 p. |
artikel |
13 |
A New Control Strategy Based on the Concept of Non Integer Derivation: Application in Robot Control
|
Oustaloup, A. |
|
1990 |
23 |
3 |
p. 641-648 8 p. |
artikel |
14 |
A New Energy Control System Using Real Time Expert Systems
|
Nakamura, S. |
|
1990 |
23 |
3 |
p. 381-386 6 p. |
artikel |
15 |
An Expert System Application in Manufacturing
|
Di Chio, E. |
|
1990 |
23 |
3 |
p. 75-78 4 p. |
artikel |
16 |
An Integrated Approach to Shop-Floor Information Systems – A Successful Implementation in a Modern Manufacturing Process
|
Geary, G.M. |
|
1990 |
23 |
3 |
p. 579-582 4 p. |
artikel |
17 |
An Integrated CAD/CAM System for a Textile Industry with Knitting Machineries
|
Vaamonde, A. |
|
1990 |
23 |
3 |
p. 571-577 7 p. |
artikel |
18 |
An Intelligent Planner for Assembly Process Planning
|
Dowd, A.L. |
|
1990 |
23 |
3 |
p. 39-43 5 p. |
artikel |
19 |
An Interactive Simulation Model for Multiparameter Optimization of Cutting Processes in FMS
|
Polajnar, D. |
|
1990 |
23 |
3 |
p. 197-202 6 p. |
artikel |
20 |
An Ultrasonic Phased-Array-Sensor for Robot Environment Modelling and Fast Detection of Collision Possibility
|
Vietze, L. |
|
1990 |
23 |
3 |
p. 353-358 6 p. |
artikel |
21 |
Application of a Novel Force-Torque Sensor in Advanced Robot Assembly and Machining Tasks
|
Wahrburg, J. |
|
1990 |
23 |
3 |
p. 593-597 5 p. |
artikel |
22 |
A Product Information System to Improve the Yield of a Manufacturing Process
|
Geary, G.M. |
|
1990 |
23 |
3 |
p. 399-403 5 p. |
artikel |
23 |
A Production System for AGVS Control
|
Moreno, L. |
|
1990 |
23 |
3 |
p. 659-663 5 p. |
artikel |
24 |
A Recursive Algorithm for Path Planning Between Monotone Chains
|
Lodares, D. |
|
1990 |
23 |
3 |
p. 499-503 5 p. |
artikel |
25 |
Artificial Intelligence Techniques on a Distributed Control Environment
|
Borda, J. |
|
1990 |
23 |
3 |
p. 45-49 5 p. |
artikel |
26 |
Assembly Performance of a Robotic Vibratory Wrist
|
Won Jeong, K. |
|
1990 |
23 |
3 |
p. 605-608 4 p. |
artikel |
27 |
A Study on Distributed Simulation for Flexible Manufacturing Systems
|
Fujii, S. |
|
1990 |
23 |
3 |
p. 27-32 6 p. |
artikel |
28 |
Author Index
|
|
|
1990 |
23 |
3 |
p. 683-685 3 p. |
artikel |
29 |
Automated Sewing with Direct Drive Manipulator
|
Arai, T. |
|
1990 |
23 |
3 |
p. 365-370 6 p. |
artikel |
30 |
Automated Warehousing and Manufacturing Pilot Plant: Hardware and Software
|
Sirgo, J.A. |
|
1990 |
23 |
3 |
p. 119-124 6 p. |
artikel |
31 |
Automatic Fine-Motion Planning Based on Position/Force States
|
Suárez, R. |
|
1990 |
23 |
3 |
p. 301-307 7 p. |
artikel |
32 |
Automatic Generation of Manufacturing Control Instructions - An Expert Systems Approach
|
Neelamkavil, J. |
|
1990 |
23 |
3 |
p. 431-436 6 p. |
artikel |
33 |
CAM Systems with Extreme Requirements of Quality Assurance – Two Case Studies
|
Tempelmeier, T. |
|
1990 |
23 |
3 |
p. 587-592 6 p. |
artikel |
34 |
Cellular Facility Design Made Easy
|
Wells, A.J. |
|
1990 |
23 |
3 |
p. 341-345 5 p. |
artikel |
35 |
CIM Concept for the Production of Welding Transformers
|
Kopacek, P. |
|
1990 |
23 |
3 |
p. 583-586 4 p. |
artikel |
36 |
CIM in Chop- and Spray-Technology for Production in Glass-Fiber
|
Calandra, M. |
|
1990 |
23 |
3 |
p. 477-482 6 p. |
artikel |
37 |
CIM: On a New Theoretical Approach of Integration
|
Tóth, T. |
|
1990 |
23 |
3 |
p. 219-225 7 p. |
artikel |
38 |
Combined Scheduling and Routing in Discrete Manufacturing Systems
|
Aicardi, M. |
|
1990 |
23 |
3 |
p. 671-676 6 p. |
artikel |
39 |
Combining Time-Out and Non-Determinism in Real-Time Programming
|
Cerrada, J.A. |
|
1990 |
23 |
3 |
p. 405-409 5 p. |
artikel |
40 |
Computer Aided Layout Planning for Robot Assembly Applications
|
Huck, M. |
|
1990 |
23 |
3 |
p. 159-164 6 p. |
artikel |
41 |
Computer Aided Planning of Assembly Systems
|
Seliger, G. |
|
1990 |
23 |
3 |
p. 613-618 6 p. |
artikel |
42 |
Computer-Aided Programming Tool for Robotics
|
Warczynski, J. |
|
1990 |
23 |
3 |
p. 265-270 6 p. |
artikel |
43 |
Concepts for the Realization of Distributed, Fault Tolerant CIM Structures
|
Bernhardt, R. |
|
1990 |
23 |
3 |
p. 103-111 9 p. |
artikel |
44 |
Constructing Plantwide Management and Information System
|
Yamashita, K. |
|
1990 |
23 |
3 |
p. 227-232 6 p. |
artikel |
45 |
Contribution of Eureka Projects to Innovation in Manufacturing Technology
|
Jovane, F. |
|
1990 |
23 |
3 |
p. 9-20 12 p. |
artikel |
46 |
Contribution to Computer-Aided Design of Flexible Assembly Systems
|
Henrioud, J.M. |
|
1990 |
23 |
3 |
p. 461-464 4 p. |
artikel |
47 |
Database Support in Workcell Design
|
Prieto, F. |
|
1990 |
23 |
3 |
p. 527-532 6 p. |
artikel |
48 |
Data Structures for Computer-Aided Assembly Planning: A Survey
|
Delchambre, A. |
|
1990 |
23 |
3 |
p. 419-424 6 p. |
artikel |
49 |
Deep Knowledge for Configuration and Diagnosis in a Technical Environment
|
Hinkelmann, K. |
|
1990 |
23 |
3 |
p. 465-470 6 p. |
artikel |
50 |
Design of Decision-Making Engine in Knowledge Assisted Process Planning System (KAPPS)
|
Iwata, K. |
|
1990 |
23 |
3 |
p. 85-90 6 p. |
artikel |
51 |
Developing Industrial Systems According to the Process Interaction Approach
|
Overwater, R. |
|
1990 |
23 |
3 |
p. 137-142 6 p. |
artikel |
52 |
Development of Unmanned Machine Tools in Czechoslovakia
|
Krsiak, I. |
|
1990 |
23 |
3 |
p. 211-213 3 p. |
artikel |
53 |
Dynamic Data Structures for Manufacturing Information
|
Lamacraft, R.R. |
|
1990 |
23 |
3 |
p. 521-526 6 p. |
artikel |
54 |
Dynamic Piloting Policy for Flexible Assembly Lines
|
Shin, O.K. |
|
1990 |
23 |
3 |
p. 539-544 6 p. |
artikel |
55 |
Education in Manufacturing and Robotics
|
Kopacek, P. |
|
1990 |
23 |
3 |
p. 1-3 3 p. |
artikel |
56 |
Experimental Results on IR Sensor Simulation
|
Ilari, J. |
|
1990 |
23 |
3 |
p. 69-74 6 p. |
artikel |
57 |
FACCS: The Flexible Assembly Cell Control System
|
Valckenaers, P. |
|
1990 |
23 |
3 |
p. 321-325 5 p. |
artikel |
58 |
Factory Automation: Production Subsystem Management
|
del Castillo, M.D. |
|
1990 |
23 |
3 |
p. 125-128 4 p. |
artikel |
59 |
Force Interaction and Control of Two-Arm Manipulators
|
Sasiadek, J.Z. |
|
1990 |
23 |
3 |
p. 377-380 4 p. |
artikel |
60 |
Graphical Simulation of Compliant Motion Robot Tasks
|
Simkens, P. |
|
1990 |
23 |
3 |
p. 21-26 6 p. |
artikel |
61 |
Grid Modelisation for Autonomous Robot
|
Pruski, A. |
|
1990 |
23 |
3 |
p. 185-189 5 p. |
artikel |
62 |
Grouping Parts to Reduce the Complexity of Assembly Sequence Planning
|
Boneschanscher, N. |
|
1990 |
23 |
3 |
p. 233-238 6 p. |
artikel |
63 |
Handling Objects of Unknown Characteristics
|
Adl, P. |
|
1990 |
23 |
3 |
p. 63-68 6 p. |
artikel |
64 |
How to Use the Manufacturing Information Systems as a Competitive Weapon
|
Borda, J. |
|
1990 |
23 |
3 |
p. 57-61 5 p. |
artikel |
65 |
Industry Automation
|
Bühler Dr., Ch. |
|
1990 |
23 |
3 |
p. 5-8 4 p. |
artikel |
66 |
Integrated Manufacturing Using Co-ordinate Measuring Machines and Statistical Process Control Software
|
Robertson, W. |
|
1990 |
23 |
3 |
p. 533-537 5 p. |
artikel |
67 |
Integration of a Machine Vision System in a Flexible Workshop Fitted Out with CAD/CAM Tools
|
Lucas, Y. |
|
1990 |
23 |
3 |
p. 619-623 5 p. |
artikel |
68 |
Intelligent Control for Design-Based Automated Assembly
|
Shoureshi, R. |
|
1990 |
23 |
3 |
p. 309-314 6 p. |
artikel |
69 |
Interactive Scheduling for a Human-Operated Flexible Machining Cell
|
Hatzikonstantis, L. |
|
1990 |
23 |
3 |
p. 445-450 6 p. |
artikel |
70 |
Interpolation Algorithms for General Non-Parametric and Parametric Curves by Mathematical Programming
|
Kiritsis, D.K. |
|
1990 |
23 |
3 |
p. 505-509 5 p. |
artikel |
71 |
Isomatic Plus - Low Cost Distributed Control System
|
Lazarov, V. |
|
1990 |
23 |
3 |
p. 631-635 5 p. |
artikel |
72 |
Keyword Index
|
|
|
1990 |
23 |
3 |
p. 687-689 3 p. |
artikel |
73 |
Kinematics of a Three Degree-of-freedom, Two Links Lightweight Flexible Arm
|
Feliú, V. |
|
1990 |
23 |
3 |
p. 143-148 6 p. |
artikel |
74 |
Knowledge-Based Order Specific NC Drilling System
|
Pau, L.F. |
|
1990 |
23 |
3 |
p. 275-279 5 p. |
artikel |
75 |
Knowledge Based Systems for Engineering Design and Manufacture
|
Rayment, P.J. |
|
1990 |
23 |
3 |
p. 287-299 13 p. |
artikel |
76 |
Logical Structure of Tooling System Design – Fundamentals of Tooling Selection Expert System
|
Milacic, V.R. |
|
1990 |
23 |
3 |
p. 425-430 6 p. |
artikel |
77 |
Manufacturing Automation and Prototyping for Printed Wiring Boards
|
Kirk, J.A. |
|
1990 |
23 |
3 |
p. 113-117 5 p. |
artikel |
78 |
Manufacturing Modelling and Multi-Levels Evaluation Integrated Human Aspects
|
El Mhamedi, A. |
|
1990 |
23 |
3 |
p. 129-135 7 p. |
artikel |
79 |
Maximizing Productivity from Machining Cells
|
Hammond, T.M. |
|
1990 |
23 |
3 |
p. 483-486 4 p. |
artikel |
80 |
Measurement of Information Systems Integration
|
Brace, G. |
|
1990 |
23 |
3 |
p. 97-102 6 p. |
artikel |
81 |
Modelling and Simulation of Large-Scale Multiparameter Computer Aided Dynamical Control Systems
|
Jones Jr., J. |
|
1990 |
23 |
3 |
p. 545-551 7 p. |
artikel |
82 |
Modelling, Control and Simulation of Flexible Assembly Systems
|
Barbier, M. |
|
1990 |
23 |
3 |
p. 191-196 6 p. |
artikel |
83 |
Modelling Industrial Chemical Plants: Simulation via STELLA™
|
Jones, G. |
|
1990 |
23 |
3 |
p. 271-274 4 p. |
artikel |
84 |
Modular Simulation Model of Robot Cells
|
Warnecke, H.J. |
|
1990 |
23 |
3 |
p. 359-363 5 p. |
artikel |
85 |
Motion Control of an Autonomous Vehicle
|
Boukas, K. |
|
1990 |
23 |
3 |
p. 493-497 5 p. |
artikel |
86 |
Neutral Interfaces that Work: Application for Robot Welding
|
Kroszynski, U. |
|
1990 |
23 |
3 |
p. 625-629 5 p. |
artikel |
87 |
Off-Line Programming Environment for Robotic Applications
|
Hagg, E. |
|
1990 |
23 |
3 |
p. 155-158 4 p. |
artikel |
88 |
On a Method of Cutting Arbitrary Plane Shape by Using a Small Drill and a Personal Computer
|
Itoh, M. |
|
1990 |
23 |
3 |
p. 517-520 4 p. |
artikel |
89 |
Optimal Design of Buffer Storage in an Assembly Line
|
Hyun Kwon, W. |
|
1990 |
23 |
3 |
p. 665-669 5 p. |
artikel |
90 |
Optimization Techniques Applied to Job-shop Scheduling
|
Bera, H. |
|
1990 |
23 |
3 |
p. 333-335 3 p. |
artikel |
91 |
Parameter Adaptive Control Strategy for the Cylindrical Surface Grinding Process
|
Fuchs, A. |
|
1990 |
23 |
3 |
p. 239-244 6 p. |
artikel |
92 |
PC's in CAM Education
|
Kopacek, P. |
|
1990 |
23 |
3 |
p. 215-218 4 p. |
artikel |
93 |
Pilot Expert System (ROBEX) for Conceptual Design of Industrial Manufacturing Task-Based Robots
|
Milacic, V.R. |
|
1990 |
23 |
3 |
p. 79-84 6 p. |
artikel |
94 |
Power Optimization of Multi-Fluid Transportation Systems
|
Camacho, E.F. |
|
1990 |
23 |
3 |
p. 649-654 6 p. |
artikel |
95 |
Preface
|
Puente, E.A. |
|
1990 |
23 |
3 |
p. vii- 1 p. |
artikel |
96 |
Production Change Multicriteria Optimization with Due-Date Constraints
|
Gonthier, A. |
|
1990 |
23 |
3 |
p. 337-340 4 p. |
artikel |
97 |
Production Scheduling and Shop-Floor Control Using a Relational Data Base Management System
|
Benhabib, B. |
|
1990 |
23 |
3 |
p. 393-398 6 p. |
artikel |
98 |
Production Scheduling Using AI Techniques
|
Rodríguez-Somoza, B. |
|
1990 |
23 |
3 |
p. 387-392 6 p. |
artikel |
99 |
Propagation of Spatial Uncertainties Between Assembly Primitives
|
van der Drift, J.H.M. |
|
1990 |
23 |
3 |
p. 677-681 5 p. |
artikel |
100 |
Prototyping of F.M.S. from the Design of a Pregraph Based on Some Extended Petri-Nets
|
Castelain, E. |
|
1990 |
23 |
3 |
p. 347-352 6 p. |
artikel |
101 |
Reactive Scheduling of a Flexible Manufacturing Cell
|
Lázaro, J.M. |
|
1990 |
23 |
3 |
p. 451-454 4 p. |
artikel |
102 |
Real Time Quality Feedback in a Flexible Milling Cell
|
Gien, D. |
|
1990 |
23 |
3 |
p. 245-250 6 p. |
artikel |
103 |
Retrofitting a CNC Machining Center with a Magnetic Spindle for Tool Path Error Control
|
Anjanappa, M. |
|
1990 |
23 |
3 |
p. 511-515 5 p. |
artikel |
104 |
Robot Control in Manufacturing: Combining Reference Information with Online Sensor Correction
|
Freund, E. |
|
1990 |
23 |
3 |
p. 411-417 7 p. |
artikel |
105 |
Scheduling Editor for Production Management with Human-Computer Cooperative Systems
|
Fukuda, T. |
|
1990 |
23 |
3 |
p. 179-183 5 p. |
artikel |
106 |
SCLES: Strategic Control Level Expert System for Industrial Robots
|
Devedzic, V. |
|
1990 |
23 |
3 |
p. 91-96 6 p. |
artikel |
107 |
Semantic Network Processing System Used for Simulation, Fast Prototyping and Configuration of Large Software Systems
|
Sotirovski, D.M. |
|
1990 |
23 |
3 |
p. 637-640 4 p. |
artikel |
108 |
Sensor-Based Robots in Computer-Aided Manufacturing
|
Fuchs, K. |
|
1990 |
23 |
3 |
p. 609-611 3 p. |
artikel |
109 |
Simulating a Factory Production Process with Automated Guided Vehicles
|
Petkovska, G. |
|
1990 |
23 |
3 |
p. 455-459 5 p. |
artikel |
110 |
Simulation of a Flexible Manufacturing System (FMS) for Fabrication of Bonded Structures
|
Al-Yassin, R.M.A. |
|
1990 |
23 |
3 |
p. 203-209 7 p. |
artikel |
111 |
Task Execution Simulation of Robot Application Programs
|
Schreck, G. |
|
1990 |
23 |
3 |
p. 257-263 7 p. |
artikel |
112 |
The Scheduler's Information System: What is Going On? Insights for Automated Environments
|
McKay, K.N. |
|
1990 |
23 |
3 |
p. 327-331 5 p. |
artikel |
113 |
The Simulation Language SIMIAN for Decision Support Systems in Production Planning
|
Jordan, E. |
|
1990 |
23 |
3 |
p. 553-558 6 p. |
artikel |
114 |
THOR, A CAPP System for Turning with a High Grade of Interactive Implementation
|
Bengoa, A. |
|
1990 |
23 |
3 |
p. 171-177 7 p. |
artikel |
115 |
Trajectory Planning Method for Mobile Robots
|
Campoy, P. |
|
1990 |
23 |
3 |
p. 487-492 6 p. |
artikel |
116 |
Upon One Control Problem for Semiautomated Production Systems
|
Golenko-Ginzburg, D. |
|
1990 |
23 |
3 |
p. 165-169 5 p. |
artikel |
117 |
Visual Feedback Applied to an Autonomous Vehicle
|
Maravall, D. |
|
1990 |
23 |
3 |
p. 655-658 4 p. |
artikel |