nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Continuous Multi-Echelon Inventory Problem *
|
Menaldi, J.L. |
|
1982 |
15 |
8 |
p. 141-149 9 p. |
artikel |
2 |
Advances in Computer Software Packages for Manufacturing Control
|
Kochhar, A.K. |
|
1982 |
15 |
8 |
p. 133-140 8 p. |
artikel |
3 |
A Framework for Modelling Discrete Event Systems for Automated Manufacturing Processes
|
Buchner, M. |
|
1982 |
15 |
8 |
p. 177-179 3 p. |
artikel |
4 |
A Modular Test Equipment for the Inspection of Components in Mechanical Engineering
|
Schwerhoff, U. |
|
1982 |
15 |
8 |
p. 47-55 9 p. |
artikel |
5 |
An Architecture for Real-Time Sensory-Interactive Control of Robots in a Manufacturing Facility
|
Albus, J.S. |
|
1982 |
15 |
8 |
p. 81-90 10 p. |
artikel |
6 |
Applying Stochastic Control Theory to Robot Sensing, Teaching, and Long Term Control
|
Whitney, D.E. |
|
1982 |
15 |
8 |
p. 109-117 9 p. |
artikel |
7 |
A Real Time Control System for an Unaligned Flexible Manufacturing System
|
Dupont-Gatelmand, C. |
|
1982 |
15 |
8 |
p. 169-175 7 p. |
artikel |
8 |
Author Index
|
|
|
1982 |
15 |
8 |
p. 217- 1 p. |
artikel |
9 |
Computer Aided Process Planning for Single and Small Batch Production
|
Prack, K.-W. |
|
1982 |
15 |
8 |
p. 125-131 7 p. |
artikel |
10 |
Controlling a Robot's Motion Speed by a Force-Torque-Sensor for Deburring Problems
|
Plank, G. |
|
1982 |
15 |
8 |
p. 97-102 6 p. |
artikel |
11 |
Decision Support Systems in Manufacturing: A New Approach to MRP
|
Erst, R.S. |
|
1982 |
15 |
8 |
p. 163-167 5 p. |
artikel |
12 |
Defense Advanced Research Projects Agency Program – Intelligent Task Automation *
|
Levinthal, E.C. |
|
1982 |
15 |
8 |
p. 1-7 7 p. |
artikel |
13 |
Development of a Measuring Center on the Basis of Laser Light Intersection Method
|
Kampa, H. |
|
1982 |
15 |
8 |
p. 57-62 6 p. |
artikel |
14 |
Flexible Production Systems in the Federal Republic of Germany
|
Warnecke, H.-J. |
|
1982 |
15 |
8 |
p. 191-206 16 p. |
artikel |
15 |
Inprocess Monitoring of Tool Breakage Based on Auto-Regressive Model
|
Mohri, N. |
|
1982 |
15 |
8 |
p. 41-45 5 p. |
artikel |
16 |
Intelligent Control of a Multiactuator System
|
Meystel, A. |
|
1982 |
15 |
8 |
p. 71-80 10 p. |
artikel |
17 |
Loading and Unloading of Pallets Using Sensor-Assisted Industrial Robots
|
Warnecke, H.-J. |
|
1982 |
15 |
8 |
p. 63-70 8 p. |
artikel |
18 |
Manufacturing Process Control Specification with Functional Programming
|
Walter, C. |
|
1982 |
15 |
8 |
p. 21-26 6 p. |
artikel |
19 |
Mathematical Modelling and Control of Glass Forehearths
|
Bartlett, H. |
|
1982 |
15 |
8 |
p. 27-34 8 p. |
artikel |
20 |
Modelling and Dynamic Analysis of Fluid Powered Robots
|
Romiti, A. |
|
1982 |
15 |
8 |
p. 91-96 6 p. |
artikel |
21 |
National Bureau of Standards' Automation Research Program
|
Simpson, J.A. |
|
1982 |
15 |
8 |
p. 9-13 5 p. |
artikel |
22 |
National Science Foundation – Manufacturing Engineering Program
|
Spurgeon, W.M. |
|
1982 |
15 |
8 |
p. 15-19 5 p. |
artikel |
23 |
Optimal Control of a Production Line with Adjustable Service Rates
|
Cassandras, C. |
|
1982 |
15 |
8 |
p. 151-162 12 p. |
artikel |
24 |
Preface
|
Hardt, D.E. |
|
1982 |
15 |
8 |
p. vi- 1 p. |
artikel |
25 |
Relaxed Path Tracking of Mechanical Manipulators by Parameter Estimation *
|
Luh, J.Y.S. |
|
1982 |
15 |
8 |
p. 103-107 5 p. |
artikel |
26 |
Shape Control in Metal Bending Processes: The Model Measurement Tradeoff
|
Hardt, D.E. |
|
1982 |
15 |
8 |
p. 35-40 6 p. |
artikel |
27 |
Systems Approach Toward Implementation of a Multiassembly, Multilot-Size, Multitechnology, Manufacturing Facility
|
White, D.A. |
|
1982 |
15 |
8 |
p. 181-190 10 p. |
artikel |
28 |
The Role of Shop Floor Information in Manufacturing Control
|
Berry, G.L. |
|
1982 |
15 |
8 |
p. 119-124 6 p. |
artikel |
29 |
The Virtual Manufacturing Cell
|
McLean, C.R. |
|
1982 |
15 |
8 |
p. 207-215 9 p. |
artikel |