nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Fast Algorithm for On-line Load Flow and Contingency Evaluation
|
Pai, M.A. |
|
1979 |
12 |
5P1 |
p. 132-138 7 p. |
artikel |
2 |
Algebraic Versus Dynamic Additional Feedback Effects on Low-Frequency Oscillations of Longitudinal Power Systems
|
Arcidiacono, V. |
|
1979 |
12 |
5P1 |
p. 161-168 8 p. |
artikel |
3 |
Algorithms for Computation of Load Flow Under Fault Conditions
|
Prusti, S.B. |
|
1979 |
12 |
5P1 |
p. 361-362 2 p. |
artikel |
4 |
A Microprocessor Based Inverse Time Overcurrent Relay
|
Dewe, M.B. |
|
1979 |
12 |
5P1 |
p. 348-353 6 p. |
artikel |
5 |
A Microprocessor-Based Underfrequency Detection System
|
Dandekar, P.W. |
|
1979 |
12 |
5P1 |
p. 342-347 6 p. |
artikel |
6 |
A Modified Newton Raphson Load Flow Technique and Its Use in Simulating Line and Transformer Outages
|
Sachdev, M.S. |
|
1979 |
12 |
5P1 |
p. 126-131 6 p. |
artikel |
7 |
Analysis of Dynamic Instability in Series Compensated Power Systems
|
Murthy, P.G. |
|
1979 |
12 |
5P1 |
p. 191-197 7 p. |
artikel |
8 |
An Efficient Algorithm for Power System State Estimation
|
Rao, N.D. |
|
1979 |
12 |
5P1 |
p. 81-88 8 p. |
artikel |
9 |
A Network Programming Approach for Investment Planning in Large Power Systems
|
Mukherjee, Shishir K. |
|
1979 |
12 |
5P1 |
p. 377- 1 p. |
artikel |
10 |
An Evaluation of Present and Future Computer Technology for Large Scale Power System Simulation
|
Happ, H.H. |
|
1979 |
12 |
5P1 |
p. 1-8 8 p. |
artikel |
11 |
A New Start-Up and Loading-Up Turbine System
|
Copin, B. |
|
1979 |
12 |
5P1 |
p. 309-315 7 p. |
artikel |
12 |
APL Language for the Power Engineer
|
Balasubramanian, N.V. |
|
1979 |
12 |
5P1 |
p. 363-364 2 p. |
artikel |
13 |
Application of a Combined Short-Term Load Forecasting Algorithm to Different Power System Utilities
|
Edwin, K.W. |
|
1979 |
12 |
5P1 |
p. 248-254 7 p. |
artikel |
14 |
Application of Vasileva's Singular Perturbation Method to Problems in Large Scale Power Systems
|
Rajagopalan, P.K. |
|
1979 |
12 |
5P1 |
p. 41-49 9 p. |
artikel |
15 |
Computer Processing of the Data Required for the Probabilistic Forecasting of the Daily Peak Power Demand by Means of Markovian Processes
|
Carta, G. |
|
1979 |
12 |
5P1 |
p. 269-276 8 p. |
artikel |
16 |
Control Analysis of Synchronous Machine Excitation System
|
Arumugam, M. |
|
1979 |
12 |
5P1 |
p. 375-376 2 p. |
artikel |
17 |
Design and Construction of a Microprocessor Controller for Synchronous Generator
|
Hope, G.S. |
|
1979 |
12 |
5P1 |
p. 321-327 7 p. |
artikel |
18 |
Design of Stabilizers for Synchronous Machines by Mitrovic Approach
|
Parvatisam, K. |
|
1979 |
12 |
5P1 |
p. 371-372 2 p. |
artikel |
19 |
Distortion and Unbalance From Abnormal Loads on a Power System
|
Howroyd, D.C. |
|
1979 |
12 |
5P1 |
p. 233-240 8 p. |
artikel |
20 |
Dynamic Equivalents for Excitation Controllers and Governor Turbine Systems
|
Sankaranarayanan, V. |
|
1979 |
12 |
5P1 |
p. 66-73 8 p. |
artikel |
21 |
Dynamic Equivalents in Transient Stability Using Regressive Models
|
Govindarao, G. |
|
1979 |
12 |
5P1 |
p. 50-57 8 p. |
artikel |
22 |
Dynamic Equivalents of Power Systems Using Singular Perturbation Technique
|
Pai, M.A. |
|
1979 |
12 |
5P1 |
p. 33-40 8 p. |
artikel |
23 |
Dynamic System Simplification and Stability Using Vector Lyapunov Functions
|
Lakshminarayana, C. |
|
1979 |
12 |
5P1 |
p. 183-190 8 p. |
artikel |
24 |
Effect of Bus Oscillations on the Transient Performance of a Synchronous Machine System by Harmonic Balance Principle
|
Jain, S.K. |
|
1979 |
12 |
5P1 |
p. 365-366 2 p. |
artikel |
25 |
Energy Forecasting Models Based on the Logistic Law
|
Shenoi, Asha |
|
1979 |
12 |
5P1 |
p. 277-287 11 p. |
artikel |
26 |
Fast Approximate A.C. Power Flow Solution for Changes in a Network Using Diakoptic Approach
|
Majumdar, B. |
|
1979 |
12 |
5P1 |
p. 139-145 7 p. |
artikel |
27 |
Fast Decoupled State Estimation with Adaptive Step Size Adjustment
|
Tripathy, S.C. |
|
1979 |
12 |
5P1 |
p. 89-96 8 p. |
artikel |
28 |
Graph Theory in Dynamic Equivalencing for Large Scale Power System Studies
|
Satsangi, P.S. |
|
1979 |
12 |
5P1 |
p. 9-16 8 p. |
artikel |
29 |
Hierarchies and Goals in Power Systems
|
Malik, O.P. |
|
1979 |
12 |
5P1 |
p. 212-217 6 p. |
artikel |
30 |
Identification of Coherent Machine Groups in Electric Power Systems
|
Ruppert Filho, E. |
|
1979 |
12 |
5P1 |
p. 241-247 7 p. |
artikel |
31 |
Improvement of the Dynamic Stability Performance of Multimachine Power Systems by the Use of Optimized Static Var Compensators
|
Dash, P.K. |
|
1979 |
12 |
5P1 |
p. 169-176 8 p. |
artikel |
32 |
Inverse Time Overcurrent Relays Applying a Microprocessor
|
Ghai, A.K. |
|
1979 |
12 |
5P1 |
p. 378-379 2 p. |
artikel |
33 |
Long Term Dynamic Behaviour of the Network. Quality of Supplied Energy. Sollicitations Supported by Power Plants.
|
Pioger, G. |
|
1979 |
12 |
5P1 |
p. 226-232 7 p. |
artikel |
34 |
Long Term Load Forecasting - An Indian Case Study
|
Mohan, M.K. |
|
1979 |
12 |
5P1 |
p. 295-301 7 p. |
artikel |
35 |
Microprocessor Network for Centralized Control of Electrical Substations
|
Beaudouin, M. |
|
1979 |
12 |
5P1 |
p. 316-320 5 p. |
artikel |
36 |
Microprocessors in Hydroelectrical Power Unit Control
|
Hanganut, M. |
|
1979 |
12 |
5P1 |
p. 328-334 7 p. |
artikel |
37 |
Modelling and Simulation of Power System for Dynamic Analysis
|
Elrazaz, Z. |
|
1979 |
12 |
5P1 |
p. 204-211 8 p. |
artikel |
38 |
Multi-Level State Estimation and Optimal Dispatch Techniques
|
Irving, M.R. |
|
1979 |
12 |
5P1 |
p. 117-125 9 p. |
artikel |
39 |
Multinode Load Forecasting Using Timeseries
|
Singh, Gulab |
|
1979 |
12 |
5P1 |
p. 288-294 7 p. |
artikel |
40 |
Multi-Time-Scale Analysis of a Power System
|
Winkelman, J.R. |
|
1979 |
12 |
5P1 |
p. 25-32 8 p. |
artikel |
41 |
Network Constrained Fast Decoupled Load Flow Solutions Using Linear Programming
|
Hobson, E. |
|
1979 |
12 |
5P1 |
p. 146-152 7 p. |
artikel |
42 |
Operational Transfer Matrix Based Analysis of Power System Dynamic Stability
|
Suzuki, Hiroshi |
|
1979 |
12 |
5P1 |
p. 153-160 8 p. |
artikel |
43 |
Optimal Low Sensitivity Design of Load and Frequency Control System
|
Soni, M.P. |
|
1979 |
12 |
5P1 |
p. 367-368 2 p. |
artikel |
44 |
Optimal Stochastic Estimation in Large-Scale Power Systems
|
Singh, K. |
|
1979 |
12 |
5P1 |
p. 104-110 7 p. |
artikel |
45 |
Parameter Plane Studies of Power System Stability: Direct Digital Matrix Methods
|
Ethirajulu, P. |
|
1979 |
12 |
5P1 |
p. 373-374 2 p. |
artikel |
46 |
Potential Applications of Microprocessors in the Control of H.V.D.C. Links
|
Arrillaga, J. |
|
1979 |
12 |
5P1 |
p. 303-308 6 p. |
artikel |
47 |
Reduced-Order Dynamic Models of Large-Scale Power Systems
|
Sinha, N.K. |
|
1979 |
12 |
5P1 |
p. 17-24 8 p. |
artikel |
48 |
Routh Approximant Dynamic Equivalents for Power Systems
|
Rao, A.S. |
|
1979 |
12 |
5P1 |
p. 58-65 8 p. |
artikel |
49 |
Self-Excited Torsional Frequency oscillations in Multimachine System Involving Series - Compensated Transmission Lines
|
Parkash, Ved |
|
1979 |
12 |
5P1 |
p. 198-203 6 p. |
artikel |
50 |
Short Range Load Forecasting by Maximum Entropy Method
|
Lu, K.V. |
|
1979 |
12 |
5P1 |
p. 261-268 8 p. |
artikel |
51 |
Short Term Load Forecasting Using Periodic Model for the Weekly Load Data
|
Mahalanabis, A.K. |
|
1979 |
12 |
5P1 |
p. 255-260 6 p. |
artikel |
52 |
Singular Perturbation and Iterative Separation of Time Scales
|
Kokotovic, P.V. |
|
1979 |
12 |
5P1 |
p. 218-225 8 p. |
artikel |
53 |
State-Estimation on Electric Power Systems Using Partitioned Network Models
|
Marsh, J.F. |
|
1979 |
12 |
5P1 |
p. 97-103 7 p. |
artikel |
54 |
Substation Computer-Based Equipment
|
Le Gavrian, Paul |
|
1979 |
12 |
5P1 |
p. 335-341 7 p. |
artikel |
55 |
Subsynchronous Resonance Analysis Using Time Domain Approach
|
Hariharan, Μ.V. |
|
1979 |
12 |
5P1 |
p. 177-182 6 p. |
artikel |
56 |
The Application of a Microprocessor to Complex Electrical Interlocks
|
Lidgate, D. |
|
1979 |
12 |
5P1 |
p. 354-360 7 p. |
artikel |
57 |
The New Integrated Hierarchical Computer Complex in a BWR Plant
|
Kaneda, M. |
|
1979 |
12 |
5P1 |
p. 74-80 7 p. |
artikel |
58 |
Transient Stability Studies of a Power System with a Compensated Hydroturbine
|
Basu, T.K. |
|
1979 |
12 |
5P1 |
p. 369-370 2 p. |
artikel |
59 |
Transient State Estimation of Multimachine Power Systems by a Decentralized Sequential Observer
|
Takata, H. |
|
1979 |
12 |
5P1 |
p. 111-115 5 p. |
artikel |