nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Lean based process planning for aircraft disassembly
|
Dayi, O. |
|
2016 |
49 |
2 |
p. 54-59 6 p. |
artikel |
2 |
A Model and Polynomial Algorithm for Purchasing and Repositioning Containers
|
Jami, Neil |
|
2016 |
49 |
2 |
p. 48-53 6 p. |
artikel |
3 |
An Integrated Innovation Life Cycle Model for Supply Chain Adaption
|
Parlings, Matthias |
|
2016 |
49 |
2 |
p. 96-101 6 p. |
artikel |
4 |
An Interval- Valued Hesitant Fuzzy Ranking Method based on Group Decision Analysis for Green Supplier Selection
|
Darabi, Shiva |
|
2016 |
49 |
2 |
p. 12-17 6 p. |
artikel |
5 |
Approach for the prediction of production segmentation potential
|
Reuter, Christina |
|
2016 |
49 |
2 |
p. 42-47 6 p. |
artikel |
6 |
A Study on the Effects of Additive Manufacturing on the Structure of Supply Networks
|
Barz, A. |
|
2016 |
49 |
2 |
p. 72-77 6 p. |
artikel |
7 |
Balancing Push and Pull Strategies within the Production System
|
Puchkova, Alena |
|
2016 |
49 |
2 |
p. 66-71 6 p. |
artikel |
8 |
Contents
|
|
|
2016 |
49 |
2 |
p. i-v nvt p. |
artikel |
9 |
Correlated Storage Assignment Strategy to reduce Travel Distance in Order Picking ∗ ∗ Zhang thanks the financial support of the china scholarship council (CSC).
|
Zhang, Y. |
|
2016 |
49 |
2 |
p. 30-35 6 p. |
artikel |
10 |
CTL Model Repair for Inter-organizational Business Processes Modelled as oWFN
|
Martinez-Araiza, Ulises |
|
2016 |
49 |
2 |
p. 6-11 6 p. |
artikel |
11 |
Forest-based supply chain modelling using the SimPy simulation framework
|
Pinho, Tatiana M. |
|
2016 |
49 |
2 |
p. 90-95 6 p. |
artikel |
12 |
Modeling and random path-based direct encoding for a closed loop supply chain model with flexible delivery paths
|
Behmanesh, E. |
|
2016 |
49 |
2 |
p. 78-83 6 p. |
artikel |
13 |
Modeling, Optimization and Solving Strategies for Matching Problems in Cooperative Full Truckload Networks ∗ ∗ This work is supported by the German Federal Ministry of Education and Research (BMBF) as a part of the research project ‥En-twicklung und Erprobung produktivitats- und effizienzsteigernder Losungen zur intelligenten Vernetzung nationaler Ladungsverkehre (iLAN)‥.
|
Apfelstädt, A. |
|
2016 |
49 |
2 |
p. 18-23 6 p. |
artikel |
14 |
Modelling a biomass supply chain through discrete-event simulation ∗ ∗ This work was supported by the FCT - Fundação para a Ciência e Tecnologia through the PhD Studentship SFRH/BD/98032/2013, program POPH - Programa Operacional Potencial Humano and FSE - Fundo Social Europeu.
|
Pinho, Tatiana M. |
|
2016 |
49 |
2 |
p. 84-89 6 p. |
artikel |
15 |
Multi-Period Vehicle Routing with Limited Period Load
|
Schönberger, Jörn |
|
2016 |
49 |
2 |
p. 24-29 6 p. |
artikel |
16 |
On Contractual Periods in Supplier Development
|
Worthmann, Karl |
|
2016 |
49 |
2 |
p. 60-65 6 p. |
artikel |
17 |
Social impacts profile of suppliers: a S-LCA approach
|
do Carmo, Breno Barros Telles |
|
2016 |
49 |
2 |
p. 36-41 6 p. |
artikel |
18 |
Test for additive interaction in proportional hazard model applied to Pitot sensors reliability and survivability
|
Ezzeddine, Wajih |
|
2016 |
49 |
2 |
p. 1-5 5 p. |
artikel |
19 |
WASTE AND POLLUTION MANAGEMENT PRACTICES BY GERMAN COMPANIES
|
Ullwer, Jonathan |
|
2016 |
49 |
2 |
p. 102-107 6 p. |
artikel |