nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system
|
Onyeocha, Chukwunonyelum Emmanuel |
|
2015 |
2 |
C |
p. 137-149 13 p. |
artikel |
2 |
A critical analysis of the harmony search algorithm—How not to solve sudoku
|
Weyland, Dennis |
|
2015 |
2 |
C |
p. 97-105 9 p. |
artikel |
3 |
A decision dependent stochastic process model for repairable systems with applications
|
Zantek, Paul F. |
|
2015 |
2 |
C |
p. 73-80 8 p. |
artikel |
4 |
A mixed integer linear programming model applied in barge planning for Omya
|
Bredström, David |
|
2015 |
2 |
C |
p. 150-155 6 p. |
artikel |
5 |
A new linguistic aggregation operator and its application to multiple attribute decision making
|
Lan, Jibin |
|
2015 |
2 |
C |
p. 156-164 9 p. |
artikel |
6 |
A note on the sensitivity of the strategic asset allocation problem
|
Hurley, W.J. |
|
2015 |
2 |
C |
p. 133-136 4 p. |
artikel |
7 |
A note on the sojourn time distribution of an M/G/1 queue with a single working vacation and vacation interruption
|
Lee, Doo Ho |
|
2015 |
2 |
C |
p. 57-61 5 p. |
artikel |
8 |
A review of simheuristics: Extending metaheuristics to deal with stochastic combinatorial optimization problems
|
Juan, Angel A. |
|
2015 |
2 |
C |
p. 62-72 11 p. |
artikel |
9 |
Automation of strategy using IDEF0 — A proof of concept
|
Waissi, Gary R. |
|
2015 |
2 |
C |
p. 106-113 8 p. |
artikel |
10 |
Contents
|
|
|
2015 |
2 |
C |
p. ii-iii nvt p. |
artikel |
11 |
Editorial Board
|
|
|
2015 |
2 |
C |
p. i- 1 p. |
artikel |
12 |
Fluid approximation analysis of a call center model with time-varying arrivals and after-call work
|
Kawai, Yosuke |
|
2015 |
2 |
C |
p. 81-96 16 p. |
artikel |
13 |
Modeling bidding competitiveness and position performance in multi-attribute construction auctions
|
Ballesteros-Pérez, Pablo |
|
2015 |
2 |
C |
p. 24-35 12 p. |
artikel |
14 |
Pricing decision model for new and remanufactured short-life cycle products with time-dependent demand
|
Gan, Shu San |
|
2015 |
2 |
C |
p. 1-12 12 p. |
artikel |
15 |
Robust quadratic assignment problem with budgeted uncertain flows
|
Feizollahi, Mohammad Javad |
|
2015 |
2 |
C |
p. 114-123 10 p. |
artikel |
16 |
Simulation-based decision support for evaluating operational plans
|
Schubert, Johan |
|
2015 |
2 |
C |
p. 36-56 21 p. |
artikel |
17 |
Testing the gravity p -median model empirically
|
Carling, Kenneth |
|
2015 |
2 |
C |
p. 124-132 9 p. |
artikel |
18 |
Trajectory Scheduling Methods for minimizing total tardiness in a flowshop
|
Li, Xiaoping |
|
2015 |
2 |
C |
p. 13-23 11 p. |
artikel |