nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Achieving Low Cost and High Quality Aero Structure Assembly through Integrated Digital Metrology Systems
|
Muelaner, J.E. |
|
2013 |
7 |
C |
p. 688-693 6 p. |
artikel |
2 |
Ad-hoc Rescheduling and Innovative Business Models for Shock- robust Production Systems
|
Lanza, Gisela |
|
2013 |
7 |
C |
p. 121-126 6 p. |
artikel |
3 |
A Dispatching Algorithm and Software Tool for Managing the Part Flow of Reconfigurable Transportation System
|
Valente, Anna |
|
2013 |
7 |
C |
p. 497-502 6 p. |
artikel |
4 |
Advances in NDT and Materials Characterization by Eddy Currents
|
Almeida, G. |
|
2013 |
7 |
C |
p. 359-364 6 p. |
artikel |
5 |
A Framework for Developing Portfolios of Improvements Projects in Manufacturing
|
Kornfeld, Bernard J. |
|
2013 |
7 |
C |
p. 377-382 6 p. |
artikel |
6 |
A Game Theoretic Model to Manufacturing Planning with Single Manufacturer and Multiple Suppliers with Asymmetric Quality Information
|
Yin, Sisi |
|
2013 |
7 |
C |
p. 115-120 6 p. |
artikel |
7 |
A Generic Approach for the Graph-based Integrated Production and Intermodal Transport Scheduling with Capacity Restrictions
|
Scholz-Reiter, Bernd |
|
2013 |
7 |
C |
p. 109-114 6 p. |
artikel |
8 |
Agent based Manufacturing Simulation for Efficient Assembly Operations
|
Sudo, Yasuhiro |
|
2013 |
7 |
C |
p. 437-442 6 p. |
artikel |
9 |
A Group Decision-making Method based on Intuitionistic Fuzzy Set in the Three Dimensional Concurrent Engineering Environment: A Multi-O bjective Programming Approach
|
Shidpour, H. |
|
2013 |
7 |
C |
p. 533-538 6 p. |
artikel |
10 |
A Holistic Management Model for Manufacturing Companies and Related IT Support
|
Silcher, Stefan |
|
2013 |
7 |
C |
p. 175-180 6 p. |
artikel |
11 |
A Methodology for Product-service Systems Development
|
Marques, Pedro |
|
2013 |
7 |
C |
p. 371-376 6 p. |
artikel |
12 |
Analyzing the Influence of Capacity Adjustments on Performance Robustness in Dynamic Job-shop Environments
|
Meyer, Mirja |
|
2013 |
7 |
C |
p. 449-454 6 p. |
artikel |
13 |
An Approach for a Cloud-based Machine Tool Control
|
Verl, Alexander |
|
2013 |
7 |
C |
p. 682-687 6 p. |
artikel |
14 |
An Approach for Integrated Design of Flexible Production Systems
|
Marques, Alexandra F. |
|
2013 |
7 |
C |
p. 586-591 6 p. |
artikel |
15 |
An Approach to the Calculation of Process Forces During the Precision Honing of Small Bores
|
Schmitt, Christina |
|
2013 |
7 |
C |
p. 282-287 6 p. |
artikel |
16 |
An Organizational Concept for Collaborative Enterprise Networks
|
Baum, H. |
|
2013 |
7 |
C |
p. 55-60 6 p. |
artikel |
17 |
A PSS Model for Diamond Gemstone Processing: Economic Feasibility Analysis
|
Van Ostaeyen, Joris |
|
2013 |
7 |
C |
p. 395-400 6 p. |
artikel |
18 |
Architecture and Conceptual Design for IPS2-Execution Systems
|
Meier, Horst |
|
2013 |
7 |
C |
p. 365-370 6 p. |
artikel |
19 |
A Real-time Collision Prevention System for Machine Tools
|
Schumann, Marco |
|
2013 |
7 |
C |
p. 329-334 6 p. |
artikel |
20 |
A Study of Automatic Determination of Cutting Conditions to Minimize Machining Cost
|
Narita, Hirohisa |
|
2013 |
7 |
C |
p. 217-221 5 p. |
artikel |
21 |
A Study on the Heating Process for Forging of an Automotive Crankshaft in Terms of Energy Efficiency
|
Park, Hong-Seok |
|
2013 |
7 |
C |
p. 646-651 6 p. |
artikel |
22 |
A Systematic Approach on Developing Action-oriented, Competency-based Learning Factories
|
Tisch, M. |
|
2013 |
7 |
C |
p. 580-585 6 p. |
artikel |
23 |
Beyond Lean and Six Sigma; Cross-collaborative Improvement of Tolerances and Process Variations-A Case Study
|
Krogstie, Lars |
|
2013 |
7 |
C |
p. 610-615 6 p. |
artikel |
24 |
Casting Defect Analysis using Design of Experiments (DoE) and Computer Aided Casting Simulation Technique
|
Dabade, Uday A. |
|
2013 |
7 |
C |
p. 616-621 6 p. |
artikel |
25 |
Changeability by a Modular Design of Production Systems – Consideration of Technology, Organization and Staff
|
Meier, Horst |
|
2013 |
7 |
C |
p. 491-496 6 p. |
artikel |
26 |
Coalition Formation Based Multi-item Multi-attribute Negotiation of Supply Chain Networks
|
Yu, Fang |
|
2013 |
7 |
C |
p. 85-90 6 p. |
artikel |
27 |
Compensation of Errors in Robot Machining with a Parallel 3D-Piezo Compensation Mechanism
|
Schneider, Ulrich |
|
2013 |
7 |
C |
p. 305-310 6 p. |
artikel |
28 |
Conceptual Design of an Off-site Industrialization Process for FRP-based Transport Infrastructure Components
|
Jäger, Jens M. |
|
2013 |
7 |
C |
p. 234-239 6 p. |
artikel |
29 |
Conceptual Framework for Non-hierarchical Business Networks for Complex Products Design and Manufacturing
|
Carneiro, Luis Maia |
|
2013 |
7 |
C |
p. 61-66 6 p. |
artikel |
30 |
Concurrent Product – Supply Chain Design: A Conceptual Framework & Literature Review
|
Gan, Thiam-Soon |
|
2013 |
7 |
C |
p. 91-96 6 p. |
artikel |
31 |
Contact-less and Programming-less Human-Robot Collaboration
|
Schmidt, Bernard |
|
2013 |
7 |
C |
p. 545-550 6 p. |
artikel |
32 |
Continuous Improvement Beyond the Lean Understanding
|
Holtskog, Halvor |
|
2013 |
7 |
C |
p. 575-579 5 p. |
artikel |
33 |
Control-theoretic Analysis of the Lead Time Syndrome and its Impact on the Logistic Target Achievement
|
Knollmann, Mathias |
|
2013 |
7 |
C |
p. 97-102 6 p. |
artikel |
34 |
Cost Model for Digital Engineering Tools
|
Volkmann, Johannes W. |
|
2013 |
7 |
C |
p. 676-681 6 p. |
artikel |
35 |
Current State of Standardized Work in Automotive Industry in Sweden
|
Johansson, Pierre E.C. |
|
2013 |
7 |
C |
p. 151-156 6 p. |
artikel |
36 |
3D Design Support for Rapid Virtual Prototyping of Manufacturing Systems
|
Németh, István |
|
2013 |
7 |
C |
p. 431-436 6 p. |
artikel |
37 |
Design of Production Control's Behavior
|
Schuh, G. |
|
2013 |
7 |
C |
p. 145-150 6 p. |
artikel |
38 |
Developing Concepts for Improved Efficiency of Robot Work Preparation
|
Essers, M.S. |
|
2013 |
7 |
C |
p. 515-520 6 p. |
artikel |
39 |
Development and Research of Environmentally Friendly Dry Technological Machining System with Compensation of Physical Function of Cutting Fluids
|
Vereschaka, A.A. |
|
2013 |
7 |
C |
p. 311-316 6 p. |
artikel |
40 |
Disassembly Liaison Graphs Inspired by Word Clouds
|
Riggs, Robert J. |
|
2013 |
7 |
C |
p. 521-526 6 p. |
artikel |
41 |
Dispatching Rule-based Algorithms for a Dynamic Flexible Flow Shop Scheduling Problem with Time-dependent Process Defect Rate and Quality Feedback
|
Joo, Byung Jun |
|
2013 |
7 |
C |
p. 163-168 6 p. |
artikel |
42 |
Editorial
|
Cunha, Pedro F. |
|
2013 |
7 |
C |
p. 1-2 2 p. |
artikel |
43 |
Efficiency and Economic Evaluation of Cellular Manufacturing to Enable Lean Machining
|
Metternich, Joachim |
|
2013 |
7 |
C |
p. 592-597 6 p. |
artikel |
44 |
Enabling Energy Management for Planning Energy-efficient Factories
|
Müller, Egon |
|
2013 |
7 |
C |
p. 622-627 6 p. |
artikel |
45 |
Energy Efficiency of Manufacturing Processes: A Critical Review
|
Apostolos, Fysikopoulos |
|
2013 |
7 |
C |
p. 628-633 6 p. |
artikel |
46 |
Energy Efficient Manufacturing from Machine Tools to Manufacturing Systems
|
Salonitis, Konstantinos |
|
2013 |
7 |
C |
p. 634-639 6 p. |
artikel |
47 |
Enhanced Production Control for Prepreg Manufacturing
|
Philipp, Tobias R. |
|
2013 |
7 |
C |
p. 467-472 6 p. |
artikel |
48 |
Evaluation of Dynamic Behavior of Machine Tools for Sculptured Surface Manufacturing
|
Monaro, R.L.G. |
|
2013 |
7 |
C |
p. 317-322 6 p. |
artikel |
49 |
Evolving Paradigms of Manufacturing: From Mass Production to Mass Customization and Personalization
|
Hu, S. Jack |
|
2013 |
7 |
C |
p. 3-8 6 p. |
artikel |
50 |
Five Models of Platform-type Product Service Systems in Manufacturing
|
Nishino, Nariaki |
|
2013 |
7 |
C |
p. 389-394 6 p. |
artikel |
51 |
Fixture and Setup Planning and Fixture Configuration System
|
Attila, Rétfalvi |
|
2013 |
7 |
C |
p. 228-233 6 p. |
artikel |
52 |
Four Types of Manufacturing Process Innovation and their Managerial Concerns
|
Yamamoto, Yuji |
|
2013 |
7 |
C |
p. 479-484 6 p. |
artikel |
53 |
Genetic Algorithm-based Optimization of Cutting Parameters in Turning Processes
|
D’Addona, Doriana M. |
|
2013 |
7 |
C |
p. 323-328 6 p. |
artikel |
54 |
Identification on Some Design Key Parameters for Additive Manufacturing: Application on Electron Beam Melting
|
Vayre, B. |
|
2013 |
7 |
C |
p. 264-269 6 p. |
artikel |
55 |
Impact of Machine Reliability Data Uncertainty on the Design and Operation of Manufacturing Systems
|
Colledani, M. |
|
2013 |
7 |
C |
p. 557-562 6 p. |
artikel |
56 |
Implications for Optimisation of the Automotive Supply Chain Through Knowledge Management
|
Woolliscroft, Paul |
|
2013 |
7 |
C |
p. 211-216 6 p. |
artikel |
57 |
Improvement of Drilling Possibilities for Machining Powder Metallurgy Materials
|
Czampa, Miklós |
|
2013 |
7 |
C |
p. 288-293 6 p. |
artikel |
58 |
Improving Changeover Time: A Tailored SMED Approach for Welding Cells
|
Ferradás, Pablo Guzmán |
|
2013 |
7 |
C |
p. 598-603 6 p. |
artikel |
59 |
Influence of Process Parameters in the Friction Surfacing of AA 6082-T6 over AA 2024-T3
|
Gandra, J. |
|
2013 |
7 |
C |
p. 341-346 6 p. |
artikel |
60 |
Integrated Control System Simulation for Supporting Changes of Routing Strategy in an Automated Material Flow System
|
Rahman, Azrul Azwan Abdul |
|
2013 |
7 |
C |
p. 407-412 6 p. |
artikel |
61 |
Integrated Virtual Platform for Manufacturing Systems Design
|
Colledani, Marcello |
|
2013 |
7 |
C |
p. 425-430 6 p. |
artikel |
62 |
Investigation of Different Hard Coatings for Micromilling of Austenitic Stainless Steel
|
Biermann, Dirk |
|
2013 |
7 |
C |
p. 246-251 6 p. |
artikel |
63 |
Lean and Proactive Liquidity Management for SMEs
|
Frank, Zwißler |
|
2013 |
7 |
C |
p. 604-609 6 p. |
artikel |
64 |
Lean Leadership – Fundamental Principles and their Application
|
Dombrowski, U. |
|
2013 |
7 |
C |
p. 569-574 6 p. |
artikel |
65 |
Learning Defect Classifiers for Textured Surfaces Using Neural Networks and Statistical Feature Representations
|
Weimer, D. |
|
2013 |
7 |
C |
p. 347-352 6 p. |
artikel |
66 |
Leveraging Apps in Manufacturing. A Framework for App Technology in the Enterprise
|
Gröger, Christoph |
|
2013 |
7 |
C |
p. 664-669 6 p. |
artikel |
67 |
Maintenance Database
|
Duarte, José Caldeira |
|
2013 |
7 |
C |
p. 551-556 6 p. |
artikel |
68 |
Managing Complexity in Supply Chains: A Discussion of Current Approaches on the Example of the Semiconductor Industry
|
Aelker, Judith |
|
2013 |
7 |
C |
p. 79-84 6 p. |
artikel |
69 |
Manufacturing Network Design for Mass Customisation using a Genetic Algorithm and an Intelligent Search Method
|
Mourtzis, D. |
|
2013 |
7 |
C |
p. 37-42 6 p. |
artikel |
70 |
Manufacturing of Twist-free Surfaces by Hard Turning
|
Schubert, Andreas |
|
2013 |
7 |
C |
p. 294-298 5 p. |
artikel |
71 |
Manufacturing Systems: Skills & Competencies for the Future
|
Chryssolouris, George |
|
2013 |
7 |
C |
p. 17-24 8 p. |
artikel |
72 |
Matching Bills of Materials Using Tree Reconciliation
|
Kashkoush, Mohamed |
|
2013 |
7 |
C |
p. 169-174 6 p. |
artikel |
73 |
Measuring Global Production Effectiveness
|
Lanza, Gisela |
|
2013 |
7 |
C |
p. 31-36 6 p. |
artikel |
74 |
Metal Additive Manufacturing of a High-pressure Micro-pump
|
Wits, Wessel W. |
|
2013 |
7 |
C |
p. 252-257 6 p. |
artikel |
75 |
Method for Situation-based Modeling and Simulation of Assembly Systems
|
Neumann, Michael |
|
2013 |
7 |
C |
p. 413-418 6 p. |
artikel |
76 |
Methodology and Data-structure for a Uniform System's Specification in Simulation Projects
|
Kardos, Csaba |
|
2013 |
7 |
C |
p. 455-460 6 p. |
artikel |
77 |
Methodology for Energy Efficiency on Process Level
|
Dörr, Marcus |
|
2013 |
7 |
C |
p. 652-657 6 p. |
artikel |
78 |
Methodology for the Assessment of Structural Complexity in Global Production Networks
|
Schuh, Günther |
|
2013 |
7 |
C |
p. 67-72 6 p. |
artikel |
79 |
Milkrun Vehicle Routing Approach for Shop-floor Logistics
|
Gyulai, Dávid |
|
2013 |
7 |
C |
p. 127-132 6 p. |
artikel |
80 |
Modelling Complex Production Processes in Aerospace Industry based on Dimensional Analysis
|
Grigoriev, S.N. |
|
2013 |
7 |
C |
p. 473-478 6 p. |
artikel |
81 |
Modelling of Flexibility Costs in a Decision Support System for Mid-term Capacity Planning
|
Lingitz, Lukas |
|
2013 |
7 |
C |
p. 539-544 6 p. |
artikel |
82 |
Multi-agent Systems vs IEC 61499 for Holonic Resource Control in Reconfigurable Systems
|
Kruger, K. |
|
2013 |
7 |
C |
p. 503-508 6 p. |
artikel |
83 |
Multidimensional Evaluation of the Changeability of Interlinked Production Processes with Material Flow Simulation
|
Albrecht, Florian |
|
2013 |
7 |
C |
p. 139-144 6 p. |
artikel |
84 |
Multi-objective Process Optimization to Improve Surface Integrity on Turned Surface of Al/SiCp Metal Matrix Composites Using Grey Relational Analysis
|
Dabade, Uday A. |
|
2013 |
7 |
C |
p. 299-304 6 p. |
artikel |
85 |
Object-oriented Modeling of Manufacturing Resources Using Work Study Inputs
|
Hedman, R. |
|
2013 |
7 |
C |
p. 443-448 6 p. |
artikel |
86 |
Opportunities in the Wake of Crisis
|
Holtskog, Halvor |
|
2013 |
7 |
C |
p. 73-78 6 p. |
artikel |
87 |
Passive Haptic Feedback for Manual Assembly Simulation
|
Martin, Néstor Andrés Arteaga |
|
2013 |
7 |
C |
p. 509-514 6 p. |
artikel |
88 |
Performance Evaluation of a Software Engineering Tool for Automated Design of Cooling Systems in Injection Moulding
|
Jauregui-Becker, Juan M. |
|
2013 |
7 |
C |
p. 270-275 6 p. |
artikel |
89 |
Planning of Remote Laser Welding Processes
|
Erdős, Gábor |
|
2013 |
7 |
C |
p. 222-227 6 p. |
artikel |
90 |
Predicting Dimensional Deviations of Structural Vehicle Body Parts Deep Drawn from Aluminum Blanks
|
Klinger, Julius F. |
|
2013 |
7 |
C |
p. 353-358 6 p. |
artikel |
91 |
Pressure Reconstruction for Microrolling Process Monitoring
|
Fan, Zhaoyan |
|
2013 |
7 |
C |
p. 258-263 6 p. |
artikel |
92 |
Process Model for the Design of Bent 3-dimensional Free-form Geometries for the Three-roll-push-bending Process
|
Vatter, Peter H. |
|
2013 |
7 |
C |
p. 240-245 6 p. |
artikel |
93 |
Production Data Handling Using a Manufacturing Indicators’ Knowledge Model
|
Pintzos, G. |
|
2013 |
7 |
C |
p. 199-204 6 p. |
artikel |
94 |
Proposal for a Generic Model Dedicated to Reconfigurable and Agile Manufacturing Systems (RAMS)
|
Chalfoun, Imad |
|
2013 |
7 |
C |
p. 485-490 6 p. |
artikel |
95 |
Quality Prediction in Interlinked Manufacturing Processes based on Supervised & Unsupervised Machine Learning
|
Lieber, Daniel |
|
2013 |
7 |
C |
p. 193-198 6 p. |
artikel |
96 |
Realizing Energy Reduction of Machine Tools Through a Control-integrated Consumption Graph-based Optimization Method
|
Eberspächera, Philipp |
|
2013 |
7 |
C |
p. 640-645 6 p. |
artikel |
97 |
Risk-Value-Cost-based Optimization of Global Value-adding Structures
|
Prinz, Andrea |
|
2013 |
7 |
C |
p. 103-108 6 p. |
artikel |
98 |
Roadmap for Business Models Definition in Manufacturing Companies
|
Leitão, A. |
|
2013 |
7 |
C |
p. 383-388 6 p. |
artikel |
99 |
Spare Parts Planning for Offshore Wind Turbines Subject to Restrictive Maintenance Conditions
|
Tracht, Kirsten |
|
2013 |
7 |
C |
p. 563-568 6 p. |
artikel |
100 |
Statistical Process Control as a Service: An Industrial Case Study
|
Škulj, Gašper |
|
2013 |
7 |
C |
p. 401-406 6 p. |
artikel |
101 |
Structural Complexity of Assembly Supply Chains: A Theoretical Framework
|
Modrak, V. |
|
2013 |
7 |
C |
p. 43-48 6 p. |
artikel |
102 |
Study of the Environmental and Technical Performance of a Diesel Engine with the Alternative Use of Biofuel Obtained from the Reutilization of Vegetable Oil
|
Fernandes, Adeilton |
|
2013 |
7 |
C |
p. 335-340 6 p. |
artikel |
103 |
Synchronization Measures in Job Shop Manufacturing Environments
|
Becker, Till |
|
2013 |
7 |
C |
p. 157-162 6 p. |
artikel |
104 |
The Evolution of Manufacturing SPECIES
|
Baldwin, James Scott |
|
2013 |
7 |
C |
p. 187-192 6 p. |
artikel |
105 |
The Operational Process Dashboard for Manufacturing
|
Gröger, Christoph |
|
2013 |
7 |
C |
p. 205-210 6 p. |
artikel |
106 |
Total Energy Estimation Model for Remote Laser Welding Process
|
Um, Jumyung |
|
2013 |
7 |
C |
p. 658-663 6 p. |
artikel |
107 |
Towards a Definition of PLM-integrated Dimensional Measurement
|
Saunders, P. |
|
2013 |
7 |
C |
p. 670-675 6 p. |
artikel |
108 |
Towards Socio-Cyber-Physical Systems in Production Networks
|
Frazzon, Enzo Morosini |
|
2013 |
7 |
C |
p. 49-54 6 p. |
artikel |
109 |
Turning of High-strength Bainitic and Quenched and Tempered Steels
|
Biermann, D. |
|
2013 |
7 |
C |
p. 276-281 6 p. |
artikel |
110 |
Usage of a Digital Eco-factory for Green Production Preparation
|
Matsuda, Michiko |
|
2013 |
7 |
C |
p. 181-186 6 p. |
artikel |
111 |
Viable System Model for Manufacturing Execution Systems
|
Brecher, Christian |
|
2013 |
7 |
C |
p. 461-466 6 p. |
artikel |
112 |
Virtual Factory: An Integrated Framework for Manufacturing Systems Design and Analysis
|
Tolio, Tullio |
|
2013 |
7 |
C |
p. 25-30 6 p. |
artikel |
113 |
Virtual Fort Knox Federative, Secure and Cloud-based Platform for Manufacturing
|
Holtewert, Philipp |
|
2013 |
7 |
C |
p. 527-532 6 p. |
artikel |
114 |
Virtual Reality as a Collaboration Tool for Factory Planning based on Scenario Technique
|
Menck, Nicole |
|
2013 |
7 |
C |
p. 133-138 6 p. |
artikel |
115 |
Visualization Support for Virtual Redesign of Manufacturing Systems
|
Lindskog, Erik |
|
2013 |
7 |
C |
p. 419-424 6 p. |
artikel |
116 |
What Tracks for Sustainable Production Systems in Europe?
|
Brissaud, Daniel |
|
2013 |
7 |
C |
p. 9-16 8 p. |
artikel |