nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Case Study on Medium-Term Hydropower Scheduling with Sales of Capacity
|
Hjelmeland, Martin N. |
|
2016 |
87 |
C |
p. 124-131 8 p. |
artikel |
2 |
Balancing of Variable Wind and Solar Production in Continental Europe with Nordic Hydropower – A Review of Simulation Studies
|
Graabak, Ingeborg |
|
2016 |
87 |
C |
p. 91-99 9 p. |
artikel |
3 |
Comparing Bidding Methods for Hydropower
|
Aasgård, Ellen Krohn |
|
2016 |
87 |
C |
p. 181-188 8 p. |
artikel |
4 |
Delay and Loss of Production Water along the Orkla River
|
Vassenden, Frode |
|
2016 |
87 |
C |
p. 149-156 8 p. |
artikel |
5 |
Determinants of Regulated Hydropower Supply in Norway
|
Birkedal, Mariann |
|
2016 |
87 |
C |
p. 11-18 8 p. |
artikel |
6 |
Economic Analysis of Large-Scale Pumped Storage Plants in Norway
|
Henden, Arild Lote |
|
2016 |
87 |
C |
p. 116-123 8 p. |
artikel |
7 |
Editorial
|
Helseth, Arild |
|
2016 |
87 |
C |
p. 1- 1 p. |
artikel |
8 |
Hydropower Storage Optimization Considering Spot and Intraday Auction Market
|
Braun, Sebastian |
|
2016 |
87 |
C |
p. 36-44 9 p. |
artikel |
9 |
Increased Information Flow between Hydropower Scheduling Models through Extended Cut Sharing
|
Gjerden, Knut Skogstrand |
|
2016 |
87 |
C |
p. 85-90 6 p. |
artikel |
10 |
Influence of the Maximum Flow Ramping Rates on the Water Value
|
Guisández, I. |
|
2016 |
87 |
C |
p. 100-107 8 p. |
artikel |
11 |
Integrating Variable Wind Power Using a Hydropower Cascade
|
Hamann, Andrew |
|
2016 |
87 |
C |
p. 108-115 8 p. |
artikel |
12 |
Intraday Optimization of Pumped Hydro Power Plants in the German Electricity Market
|
Braun, Sebastian |
|
2016 |
87 |
C |
p. 45-52 8 p. |
artikel |
13 |
Joint Modelling of Wind Power and Hydro Inflow for Power System Scheduling
|
Larsen, Camilla Thorrud |
|
2016 |
87 |
C |
p. 189-196 8 p. |
artikel |
14 |
Joint Use of Hydrological Modeling and Large-scale Stochastic Optimization Techniques Applied to the Nordic Power System
|
Jensen, Joachim Dahl |
|
2016 |
87 |
C |
p. 19-27 9 p. |
artikel |
15 |
Linear Decision Rules for Seasonal Hydropower Planning: Modelling Considerations
|
Braaten, Simen V. |
|
2016 |
87 |
C |
p. 28-35 8 p. |
artikel |
16 |
Modeling the Real-Time use of Reserves in the Joint Energy and Reserve Hourly Scheduling of a Pumped Storage Plant
|
Chazarra, Manuel |
|
2016 |
87 |
C |
p. 53-60 8 p. |
artikel |
17 |
Modelling Minimum Pressure Height in Short-term Hydropower Production Planning
|
Dorn, Frederic B. |
|
2016 |
87 |
C |
p. 69-76 8 p. |
artikel |
18 |
Multi-horizon Modeling in Hydro Power Planning
|
Abgottspon, Hubert |
|
2016 |
87 |
C |
p. 2-10 9 p. |
artikel |
19 |
Optimizing Hydrothermal Scheduling with Non-Convex Irrigation Constraints: Case on the Chilean Electricity System
|
Pereira-Bonvallet, Eduardo |
|
2016 |
87 |
C |
p. 132-140 9 p. |
artikel |
20 |
Profitability of a Hydro Power Producer Bidding in Multiple Power Markets
|
Rasmussen, Caroline |
|
2016 |
87 |
C |
p. 141-148 8 p. |
artikel |
21 |
Scheduling when Reservoirs are Batteries for Wind- and Solar-power
|
Wolfgang, Ove |
|
2016 |
87 |
C |
p. 173-180 8 p. |
artikel |
22 |
Short-term Hydrothermal Generation Scheduling Using a Parallelized Stochastic Mixed-integer Linear Programming Algorithm
|
Gil, Esteban |
|
2016 |
87 |
C |
p. 77-84 8 p. |
artikel |
23 |
Smoothing of Offshore Wind Power Variations with Norwegian Pumped Hydro: Case Study
|
Destro, Nicola |
|
2016 |
87 |
C |
p. 61-68 8 p. |
artikel |
24 |
Stochastic Optimization Model for Detailed Long-term Hydro Thermal Scheduling Using Scenario-tree Simulation
|
Warland, Geir |
|
2016 |
87 |
C |
p. 165-172 8 p. |
artikel |
25 |
Use of Parallel Processing in Applications for Hydro Power Scheduling – Current Status and Future Challenges
|
Warland, Geir |
|
2016 |
87 |
C |
p. 157-164 8 p. |
artikel |