nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A case study of the efficiency of the scheduling function
|
Lundell, Peter |
|
1985 |
9 |
1-3 |
p. 299-304 6 p. |
artikel |
2 |
A case study on the use of robots in assembly processes
|
Abdel-Malek, Layek |
|
1985 |
9 |
1-3 |
p. 99-103 5 p. |
artikel |
3 |
A decision support system for production and financial planning in a tannery
|
Klein, Michel R. |
|
1985 |
9 |
1-3 |
p. 239-247 9 p. |
artikel |
4 |
Algorithmic grouping of operation sequences
|
Selvam, R.Panneer |
|
1985 |
9 |
1-3 |
p. 125-134 10 p. |
artikel |
5 |
Analysis of manufacturing and quality systems using simulation
|
Palaniswami, Shanthakumar |
|
1985 |
9 |
1-3 |
p. 33-40 8 p. |
artikel |
6 |
An integrated computer-based system for financial and managerial decisions
|
Willis, Marilyn |
|
1985 |
9 |
1-3 |
p. 291-297 7 p. |
artikel |
7 |
Application of multi-objective stochastic linear programming to power systems planning
|
Teghem Jr., J. |
|
1985 |
9 |
1-3 |
p. 83-89 7 p. |
artikel |
8 |
A roi-maximizing eoq model under variable demand and markup rates
|
Arcelus, F.J. |
|
1985 |
9 |
1-3 |
p. 113-117 5 p. |
artikel |
9 |
A schematic model of experiments with mathematical models applied to production control
|
Wandel, Sten |
|
1985 |
9 |
1-3 |
p. 321-327 7 p. |
artikel |
10 |
Capacity-oriented production planning in case of a single bottle-neck
|
Bemelmans, Roland |
|
1985 |
9 |
1-3 |
p. 135-140 6 p. |
artikel |
11 |
Capacity planning in MRP, JIT and OPT: A critique
|
Gelders, Ludo F. |
|
1985 |
9 |
1-3 |
p. 201-209 9 p. |
artikel |
12 |
Capital rationalization
|
Eriksson, Anders |
|
1985 |
9 |
1-3 |
p. 177-183 7 p. |
artikel |
13 |
Consistency analysis in a hierarchical production planning system
|
Fontan, G. |
|
1985 |
9 |
1-3 |
p. 193-199 7 p. |
artikel |
14 |
Coordination of metal movement at a pipe spinning plant: Concepts and the computerised system
|
Rhodes, David |
|
1985 |
9 |
1-3 |
p. 65-71 7 p. |
artikel |
15 |
Coordination of production schedules and distribution (A case study)
|
Feser, P. |
|
1985 |
9 |
1-3 |
p. 185-192 8 p. |
artikel |
16 |
Designing a quality assurance information system for a process firm — A case study
|
Snyder, Charles A. |
|
1985 |
9 |
1-3 |
p. 169-176 8 p. |
artikel |
17 |
Editorial Board
|
|
|
1985 |
9 |
1-3 |
p. iv- 1 p. |
artikel |
18 |
Flexibility of manufacturing to customer order — As a multigoal problem
|
Lehtimäki, Allan |
|
1985 |
9 |
1-3 |
p. 11-14 4 p. |
artikel |
19 |
Heuristic modelling of a multi-echelon production-inventory system
|
Chikán, Attila |
|
1985 |
9 |
1-3 |
p. 165-168 4 p. |
artikel |
20 |
Implementation aspects of computer aided production control
|
Herman, Jiří |
|
1985 |
9 |
1-3 |
p. 219-224 6 p. |
artikel |
21 |
Implementation strategies for the integration of Japanese KANBAN-principles in German companies
|
Wildemann, Horst |
|
1985 |
9 |
1-3 |
p. 305-319 15 p. |
artikel |
22 |
Interest rates, inflation, and inventory investment: some finnish experiences
|
Kyläheiko, Kalevi |
|
1985 |
9 |
1-3 |
p. 259-266 8 p. |
artikel |
23 |
International plant location under price and exchange rate uncertainty
|
Hodder, James E. |
|
1985 |
9 |
1-3 |
p. 225-229 5 p. |
artikel |
24 |
Lot sizing heuristic for multi-echelon assembly systems
|
Peng, Kang |
|
1985 |
9 |
1-3 |
p. 51-57 7 p. |
artikel |
25 |
Machine clustering for economic production
|
Stanfel, Larry E. |
|
1985 |
9 |
1-3 |
p. 73-81 9 p. |
artikel |
26 |
Maintenance resource planning an integrative approach
|
Bruggeman, W. |
|
1985 |
9 |
1-3 |
p. 147-154 8 p. |
artikel |
27 |
Management of multi-item, multi-group inventories with multiple criteria under service level constraints
|
Ramani, S. |
|
1985 |
9 |
1-3 |
p. 59-64 6 p. |
artikel |
28 |
Micro routines for demonstrating G/T, JIT, KANBAN and MRP
|
Carlson, John G. |
|
1985 |
9 |
1-3 |
p. 155-164 10 p. |
artikel |
29 |
Minimal and maximal floats in project networks
|
Ziegler, Hans |
|
1985 |
9 |
1-3 |
p. 91-97 7 p. |
artikel |
30 |
Minimizing the expected opportunity loss in storage and production planning
|
Pastijn, H. |
|
1985 |
9 |
1-3 |
p. 41-50 10 p. |
artikel |
31 |
MRP system nervousness: Causes and cures
|
Blackburn, Joseph D. |
|
1985 |
9 |
1-3 |
p. 141-146 6 p. |
artikel |
32 |
On the generalizability of MRP simulation results
|
Minifie, J.Roberta |
|
1985 |
9 |
1-3 |
p. 211-217 7 p. |
artikel |
33 |
Optimal production of oil and gas
|
Abodunde, T.T. |
|
1985 |
9 |
1-3 |
p. 105-111 7 p. |
artikel |
34 |
Preface
|
Grubbström, Robret W. |
|
1985 |
9 |
1-3 |
p. 1-2 2 p. |
artikel |
35 |
Rebuilding of sales, production and material management systems in an electronics company
|
Kuutti, Jorma |
|
1985 |
9 |
1-3 |
p. 249-257 9 p. |
artikel |
36 |
Safety stock planning in a multi-stage production-inventory system
|
Kelle, Pèter |
|
1985 |
9 |
1-3 |
p. 231-237 7 p. |
artikel |
37 |
Structure, applications and limits of dynamic production functions of the firm based on the input-output approach
|
Küpper, Hans-Ulrich |
|
1985 |
9 |
1-3 |
p. 3-10 8 p. |
artikel |
38 |
The general multi-products dynamic lot size model with individual inventory costs and joint production costs
|
Leopoulos, V.I |
|
1985 |
9 |
1-3 |
p. 15-21 7 p. |
artikel |
39 |
The impact of capacity investments on work-in-process and inventories
|
Axsäter, Sven |
|
1985 |
9 |
1-3 |
p. 119-124 6 p. |
artikel |
40 |
The optimum behaviour of a multi-echelon production and inventory system
|
O'Grady, P.J |
|
1985 |
9 |
1-3 |
p. 23-32 10 p. |
artikel |
41 |
Using an orderbook model to co-ordinate business priorities
|
Nicholson, Alastair |
|
1985 |
9 |
1-3 |
p. 267-289 23 p. |
artikel |