nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of two classes of aggregate production planning models under stochastic demand
|
Günther, Hans Otto |
|
1982 |
6 |
C |
p. 89-97 9 p. |
artikel |
2 |
Adaptive loading and real time scheduling procedures
|
Galgut, P.E. |
|
1982 |
6 |
C |
p. 81-87 7 p. |
artikel |
3 |
Adjustments of domestic capacity and production to technology-based import competition: A case study.[1]
|
Rosegger, Gerhard |
|
1982 |
6 |
C |
p. 205-213 9 p. |
artikel |
4 |
A linear approach for solving stochastic capital budgeting problems
|
Schiefer, Gerhard |
|
1982 |
6 |
C |
p. 215-224 10 p. |
artikel |
5 |
Alternative dynamic programming approaches to obtain upper bounds for the economic lot scheduling problem
|
Axsäter, Sven |
|
1982 |
6 |
C |
p. 17-23 7 p. |
artikel |
6 |
A method of inventory planning
|
Chikán, Attila |
|
1982 |
6 |
C |
p. 59-65 7 p. |
artikel |
7 |
A model for decentralized price control applied to a hierarchically organized bank
|
Lundquist, Janerik |
|
1982 |
6 |
C |
p. 153-166 14 p. |
artikel |
8 |
An overview of possible procedures for stochastic MRP
|
Büchel, Alfred |
|
1982 |
6 |
C |
p. 43-51 9 p. |
artikel |
9 |
A quality control model in series production with inaccurate tests and feed back
|
Benito, Francisco |
|
1982 |
6 |
C |
p. 25-32 8 p. |
artikel |
10 |
Bridging the gap between theory and practice in production and inventory control
|
Heard, Edwin L. |
|
1982 |
6 |
C |
p. 119-129 11 p. |
artikel |
11 |
Cost and price indices
|
|
|
1982 |
6 |
C |
p. 267-273 7 p. |
artikel |
12 |
Decision support systems - a development strategy for production planning
|
Fick, Göran Pagels |
|
1982 |
6 |
C |
p. 201-204 4 p. |
artikel |
13 |
Design and implementation of a shop floor scheduling and control system using a mini computer. A case study from manufacturing
|
O'Connor, Brian John |
|
1982 |
6 |
C |
p. 189-199 11 p. |
artikel |
14 |
Design and provision of information for delivery management in make-to-order batch manufacture
|
Nicholson, T.A.J. |
|
1982 |
6 |
C |
p. 175-187 13 p. |
artikel |
15 |
Diagnostic analysis of the potential savings of a multi-product/single facility profuction planning system
|
Bruggeman, W. |
|
1982 |
6 |
C |
p. 33-41 9 p. |
artikel |
16 |
Diary of events
|
|
|
1982 |
6 |
C |
p. 275-276 2 p. |
artikel |
17 |
Dynamic rescheduling of operations — a computer approach to production control
|
Herman, Jiǐ |
|
1982 |
6 |
C |
p. 131-139 9 p. |
artikel |
18 |
Economic and organizational aspects in systems design: The case of production inventory in the alfa romeo company
|
Alacevich, E. |
|
1982 |
6 |
C |
p. 1-7 7 p. |
artikel |
19 |
Economic lot sizing taking into account failure characteristics
|
Van Steelandt, Frank V. |
|
1982 |
6 |
C |
p. 237-245 9 p. |
artikel |
20 |
Editorial Board
|
|
|
1982 |
6 |
C |
p. iv- 1 p. |
artikel |
21 |
Lot sizing and safety stock decisions in an MRP system with demand uncertainty
|
De Bodt, Marc A. |
|
1982 |
6 |
C |
p. 67-75 9 p. |
artikel |
22 |
On aggregation in production planning
|
Wijngaard, J. |
|
1982 |
6 |
C |
p. 259-265 7 p. |
artikel |
23 |
Optimal linear decision rules for a work force smoothing model with seasonal demand
|
Mantel, R.J. |
|
1982 |
6 |
C |
p. 167-173 7 p. |
artikel |
24 |
Preface
|
Grubbström, Robert W. |
|
1982 |
6 |
C |
p. IX-X nvt p. |
artikel |
25 |
Quality control design for a single product manufacturing system subject to inspection error
|
Zia Hassan, M. |
|
1982 |
6 |
C |
p. 99-117 19 p. |
artikel |
26 |
Resolving a multi-item inventory problem with unknown cost
|
Alscher, J. |
|
1982 |
6 |
C |
p. 9-15 7 p. |
artikel |
27 |
Sales, production, and materiel management in a finish consumer electronics company
|
Kuutti, Jorma |
|
1982 |
6 |
C |
p. 147-152 6 p. |
artikel |
28 |
Some aspects on uncertainty in a multi-level inventory system
|
Jönsson, Henrik |
|
1982 |
6 |
C |
p. 141-146 6 p. |
artikel |
29 |
Some features common to inventory system and process controller design
|
Towill, D.R. |
|
1982 |
6 |
C |
p. 225-236 12 p. |
artikel |
30 |
The production engineer, architect of the future
|
Forman, Thomas H. |
|
1982 |
6 |
C |
p. 77-80 4 p. |
artikel |
31 |
Time-phased resource allocation for a production/distribution system
|
Carlson, John G. |
|
1982 |
6 |
C |
p. 53-58 6 p. |
artikel |
32 |
United Kingdom manufacturing performance. Analysis and implications
|
Voss, C.A. |
|
1982 |
6 |
C |
p. 247-258 12 p. |
artikel |