Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             11 results found
no title author magazine year volume issue page(s) type
1 An algorithm for the N/M/parallel/C maxpreemptive due-date scheduling problem Cheng, T.C.E.
1991
21 1 p. 43-49
7 p.
article
2 A review of research on AGVS vehicle management Co, Christine G.
1991
21 1 p. 35-42
8 p.
article
3 Diary of events 1991
21 1 p. 93-94
2 p.
article
4 Editorial Board 1991
21 1 p. v-vi
nvt p.
article
5 Mathematical formulation of the economic dispatch problem of a power system by using a linear load flow model Leonidopoulos, Georgios
1991
21 1 p. 11-20
10 p.
article
6 Minimizing production costs for a robotic assembly system Dessouky, Maged M.
1991
21 1 p. 81-92
12 p.
article
7 Procurement under uncertain supply lead times — A dual- sourcing technique could save costs Ramasesh, Ranga V.
1991
21 1 p. 59-68
10 p.
article
8 Reduction of manufacturing lead-time through selection of machining rate and unit handling size Egbelu, Pius J.
1991
21 1 p. 21-34
14 p.
article
9 Replacement of auxiliary power supply system—A case study in an urban railway Mak, S.M.L.
1991
21 1 p. 1-9
9 p.
article
10 Sizing segregation bins in bulk conveyor systems with discrete loading sources Carnahan, J.V.
1991
21 1 p. 69-80
12 p.
article
11 Strategies in spare parts management using a reliability engineering approach Sheikh, Anwar K.
1991
21 1 p. 51-57
7 p.
article
                             11 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands