nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Algorithm for quantitative analysis of close call events and personalized feedback in construction safety
|
Golovina, Olga |
|
|
99 |
C |
p. 206-222 |
artikel |
2 |
Analysis and Evaluation of Tunnel Contour Quality Index
|
Kim, Yangkyun |
|
|
99 |
C |
p. 223-237 |
artikel |
3 |
Augmented reality system for facility management using image-based indoor localization
|
Baek, Francis |
|
|
99 |
C |
p. 18-26 |
artikel |
4 |
Autonomous and resilient infrastructure with cognitive and self-deployable load-bearing structural components
|
Naser, M.Z. |
|
|
99 |
C |
p. 59-67 |
artikel |
5 |
Autonomous concrete crack detection using deep fully convolutional neural network
|
Dung, Cao Vu |
|
|
99 |
C |
p. 52-58 |
artikel |
6 |
Construction site accident analysis using text mining and natural language processing techniques
|
Zhang, Fan |
|
|
99 |
C |
p. 238-248 |
artikel |
7 |
Deep learning-based automatic volumetric damage quantification using depth camera
|
Beckman, Gustavo H. |
|
|
99 |
C |
p. 114-124 |
artikel |
8 |
Detection of construction workers under varying poses and changing background in image sequences via very deep residual networks
|
Son, Hyojoo |
|
|
99 |
C |
p. 27-38 |
artikel |
9 |
Discovering worst fire scenarios in subway stations: A simulation approach
|
Zhang, Limao |
|
|
99 |
C |
p. 183-196 |
artikel |
10 |
Editorial Board
|
|
|
|
99 |
C |
p. ii |
artikel |
11 |
Encoded asphalt materials for the guidance of autonomous vehicles
|
Moreno-Navarro, F. |
|
|
99 |
C |
p. 109-113 |
artikel |
12 |
Enhancing energy management at district and building levels via an EM-KPI ontology
|
Li, Yehong |
|
|
99 |
C |
p. 152-167 |
artikel |
13 |
Façade form-finding with swarm intelligence
|
Agirbas, Asli |
|
|
99 |
C |
p. 140-151 |
artikel |
14 |
Human adaptation to latency in teleoperated multi-robot human-agent search and rescue teams
|
Khasawneh, Amro |
|
|
99 |
C |
p. 265-277 |
artikel |
15 |
Multi-material topology optimization for additive manufacturing using polytree-based adaptive polygonal finite elements
|
Nguyen, Khai Chau |
|
|
99 |
C |
p. 79-90 |
artikel |
16 |
Negotiation throughout flexible and interactive tradeoffs applied to construction procurement
|
Palha, Rachel Perez |
|
|
99 |
C |
p. 39-51 |
artikel |
17 |
Non-contact fatigue crack detection in civil infrastructure through image overlapping and crack breathing sensing
|
Kong, Xiangxiong |
|
|
99 |
C |
p. 125-139 |
artikel |
18 |
Optimal path planning in real time for dynamic building fire rescue operations using wireless sensors and visual guidance
|
Chou, Jui-Sheng |
|
|
99 |
C |
p. 1-17 |
artikel |
19 |
Pipe radius estimation using Kinect range cameras
|
Nahangi, Mohammad |
|
|
99 |
C |
p. 197-205 |
artikel |
20 |
Quantifying and visualizing value exchanges in building information modeling (BIM) projects
|
Zheng, Xian |
|
|
99 |
C |
p. 91-108 |
artikel |
21 |
Refined safety assessment of steel grid structures with crooked tubular members
|
Liu, Yu-Fei |
|
|
99 |
C |
p. 249-264 |
artikel |
22 |
Remote proximity monitoring between mobile construction resources using camera-mounted UAVs
|
Kim, Daeho |
|
|
99 |
C |
p. 168-182 |
artikel |
23 |
Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities
|
Andrade, Paulo André de |
|
|
99 |
C |
p. 68-78 |
artikel |