nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A BIM-WMS integrated decision support tool for supply chain management in construction
|
Chen, Po-Han |
|
2019 |
98 |
C |
p. 289-301 |
artikel |
2 |
A proactive workers' safety risk evaluation framework based on position and posture data fusion
|
Chen, Hainan |
|
2019 |
98 |
C |
p. 275-288 |
artikel |
3 |
Automated post-3D visualization ergonomic analysis system for rapid workplace design in modular construction
|
Li, Xinming |
|
2019 |
98 |
C |
p. 160-174 |
artikel |
4 |
Autonomous trenching with hierarchically organized primitives
|
Groll, T. |
|
2019 |
98 |
C |
p. 214-224 |
artikel |
5 |
BIM-based approach for the cost-optimization of seismic retrofit strategies on existing buildings
|
Vitiello, U. |
|
2019 |
98 |
C |
p. 90-101 |
artikel |
6 |
Characterizing interactions with BIM tools and artifacts in building design coordination meetings
|
Mehrbod, Sarmad |
|
2019 |
98 |
C |
p. 195-213 |
artikel |
7 |
Collaborative operation and real-time control of roller fleet for asphalt pavement compaction
|
Liu, Donghai |
|
2019 |
98 |
C |
p. 16-29 |
artikel |
8 |
Community-scale multi-level post-hurricane damage assessment of residential buildings using multi-temporal airborne LiDAR data
|
Zhou, Zixiang |
|
2019 |
98 |
C |
p. 30-45 |
artikel |
9 |
Comparison and utilization of point cloud generated from photogrammetry and laser scanning: 3D world model for smart heavy equipment planning
|
Moon, Daeyoon |
|
2019 |
98 |
C |
p. 322-331 |
artikel |
10 |
Development of real-time visual monitoring system for vibration effects on fresh concrete
|
Tian, Zhenghong |
|
2019 |
98 |
C |
p. 61-71 |
artikel |
11 |
3D tracking of multiple onsite workers based on stereo vision
|
Lee, Yong-Ju |
|
2019 |
98 |
C |
p. 146-159 |
artikel |
12 |
Dynamic facilities planning model for large scale construction projects
|
Al Hawarneh, Alaa |
|
2019 |
98 |
C |
p. 72-89 |
artikel |
13 |
Editorial Board
|
|
|
2019 |
98 |
C |
p. ii |
artikel |
14 |
Framework for automated registration of UAV and UGV point clouds using local features in images
|
Park, Jisoo |
|
2019 |
98 |
C |
p. 175-182 |
artikel |
15 |
Generation of safe tool-paths for automatic manufacturing of light gauge steel panels in residential construction
|
Malik, Nabeel |
|
2019 |
98 |
C |
p. 46-60 |
artikel |
16 |
Integration of reverse engineering and non-linear numerical analysis for the seismic assessment of historical adobe buildings
|
Aguilar, Rafael |
|
2019 |
98 |
C |
p. 1-15 |
artikel |
17 |
Investigation of a single-axis discrete solar tracking system for reduced actuations and maximum energy collection
|
Batayneh, Wafa |
|
2019 |
98 |
C |
p. 102-109 |
artikel |
18 |
Optimal facility layout planning for AGV-based modular prefabricated manufacturing system
|
Chen, Chen |
|
2019 |
98 |
C |
p. 310-321 |
artikel |
19 |
Optimization of electro-hydraulic energy-savings in mobile machinery
|
Gong, Jun |
|
2019 |
98 |
C |
p. 132-145 |
artikel |
20 |
Optimization of strategy planning for building deconstruction
|
Queheille, Eva |
|
2019 |
98 |
C |
p. 236-247 |
artikel |
21 |
Recurrent neural networks for real-time prediction of TBM operating parameters
|
Gao, Xianjie |
|
2019 |
98 |
C |
p. 225-235 |
artikel |
22 |
Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling
|
Bortolini, Rafaela |
|
2019 |
98 |
C |
p. 248-264 |
artikel |
23 |
Text analytics to analyze and monitor construction project contract and correspondence
|
Marzouk, Mohamed |
|
2019 |
98 |
C |
p. 265-274 |
artikel |
24 |
Time-cost tradeoff analysis with minimized project financing cost
|
Alavipour, S.M. Reza |
|
2019 |
98 |
C |
p. 110-121 |
artikel |
25 |
Using support vector machines to classify building elements for checking the semantic integrity of building information models
|
Koo, Bonsang |
|
2019 |
98 |
C |
p. 183-194 |
artikel |
26 |
Validating ambulatory gait assessment technique for hazard sensing in construction environments
|
Yang, Kanghyeok |
|
2019 |
98 |
C |
p. 302-309 |
artikel |
27 |
Vision-based estimation of excavator manipulator pose for automated grading control
|
Xu, Jiaqi |
|
2019 |
98 |
C |
p. 122-131 |
artikel |