nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An agent-based modeling approach for understanding the effect of worker-management interactions on construction workers' safety-related behaviors
|
Zhang, Peiyao |
|
2019 |
97 |
C |
p. 29-43 |
artikel |
2 |
Applying rule-based model-checking to construction site layout planning tasks
|
Schwabe, Kevin |
|
2019 |
97 |
C |
p. 205-219 |
artikel |
3 |
A survey of automation-enabled human-in-the-loop systems for infrastructure visual inspection
|
Agnisarman, Sruthy |
|
2019 |
97 |
C |
p. 52-76 |
artikel |
4 |
A vision-based system for pre-inspection of steel frame manufacturing
|
Martinez, Pablo |
|
2019 |
97 |
C |
p. 151-163 |
artikel |
5 |
BIM semantic-enrichment for built heritage representation
|
Simeone, Davide |
|
2019 |
97 |
C |
p. 122-137 |
artikel |
6 |
Compaction quality assessment of rockfill materials using roller-integrated acoustic wave detection technique
|
Zhang, Qinglong |
|
2019 |
97 |
C |
p. 110-121 |
artikel |
7 |
Construction waste recycling robot for nails and screws: Computer vision technology and neural network approach
|
Wang, Zeli |
|
2019 |
97 |
C |
p. 220-228 |
artikel |
8 |
Cyber-physical-system-based safety monitoring for blind hoisting with the internet of things: A case study
|
Zhou, Cheng |
|
2019 |
97 |
C |
p. 138-150 |
artikel |
9 |
Data analytics to improve building performance: A critical review
|
Burak Gunay, H. |
|
2019 |
97 |
C |
p. 96-109 |
artikel |
10 |
Editorial Board
|
|
|
2019 |
97 |
C |
p. ii |
artikel |
11 |
Experience mining based on case-based reasoning for dispute settlement of international construction projects
|
Liu, Junying |
|
2019 |
97 |
C |
p. 181-191 |
artikel |
12 |
Field test of neural-network based automatic bucket-filling algorithm for wheel-loaders
|
Dadhich, Siddharth |
|
2019 |
97 |
C |
p. 1-12 |
artikel |
13 |
Framework for automated UAS-based structural condition assessment of bridges
|
Morgenthal, Guido |
|
2019 |
97 |
C |
p. 77-95 |
artikel |
14 |
Knowledge-rich optimisation of prefabricated façades to support conceptual design
|
Montali, Jacopo |
|
2019 |
97 |
C |
p. 192-204 |
artikel |
15 |
ND BIM-integrated knowledge-based building management: Inspecting post-construction energy efficiency
|
GhaffarianHoseini, Ali |
|
2019 |
97 |
C |
p. 13-28 |
artikel |
16 |
Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking
|
Ballesteros-Pérez, Pablo |
|
2019 |
97 |
C |
p. 229-240 |
artikel |
17 |
Professional development of the BIM actor role
|
Bosch-Sijtsema, Petra M. |
|
2019 |
97 |
C |
p. 44-51 |
artikel |
18 |
Review of BIM's application in energy simulation: Tools, issues, and solutions
|
Kamel, Ehsan |
|
2019 |
97 |
C |
p. 164-180 |
artikel |