nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Active control of a rod-net formwork system prototype
|
Liew, A. |
|
2018 |
96 |
C |
p. 128-140 |
artikel |
2 |
An auto-deployed model-based fault detection and diagnosis approach for Air Handling Units using BIM and Modelica
|
Andriamamonjy, Ando |
|
2018 |
96 |
C |
p. 508-526 |
artikel |
3 |
A simulation and visualization-based framework of labor efficiency and safety analysis for prevention through design and planning
|
Golabchi, Alireza |
|
2018 |
96 |
C |
p. 310-323 |
artikel |
4 |
Assessing the impacts of mobile technology on public transportation project inspection
|
Yamaura, Julian |
|
2018 |
96 |
C |
p. 55-64 |
artikel |
5 |
A unified BIM adoption taxonomy: Conceptual development, empirical validation and application
|
Ahmed, Ahmed Louay |
|
2018 |
96 |
C |
p. 103-127 |
artikel |
6 |
Automated detection and classification of construction workers' loss of balance events using wearable insole pressure sensors
|
Antwi-Afari, Maxwell Fordjour |
|
2018 |
96 |
C |
p. 189-199 |
artikel |
7 |
Automated detection and decomposition of railway tunnels from Mobile Laser Scanning Datasets
|
Sánchez-Rodríguez, A. |
|
2018 |
96 |
C |
p. 171-179 |
artikel |
8 |
Automated specification of steel reinforcement to support the optimisation of RC floors
|
Eleftheriadis, S. |
|
2018 |
96 |
C |
p. 366-377 |
artikel |
9 |
Automatic pavement defect detection using 3D laser profiling technology
|
Zhang, Dejin |
|
2018 |
96 |
C |
p. 350-365 |
artikel |
10 |
Automatic segmentation of 3D point clouds of rubble masonry walls, and its application to building surveying, repair and maintenance
|
Valero, Enrique |
|
2018 |
96 |
C |
p. 29-39 |
artikel |
11 |
Automatic window detection in facade images
|
Neuhausen, Marcel |
|
2018 |
96 |
C |
p. 527-539 |
artikel |
12 |
BIM-based benchmarking system for healthcare projects: Feasibility study and functional requirements
|
Choi, Jiyong |
|
2018 |
96 |
C |
p. 262-279 |
artikel |
13 |
Building energy savings: Analysis of research trends based on text mining
|
Ding, Zhikun |
|
2018 |
96 |
C |
p. 398-410 |
artikel |
14 |
Camera marker networks for articulated machine pose estimation
|
Feng, Chen |
|
2018 |
96 |
C |
p. 148-160 |
artikel |
15 |
Data-driven vision-based inspection for reinforced concrete beams and slabs: Quantitative damage and load estimation
|
Davoudi, Rouzbeh |
|
2018 |
96 |
C |
p. 292-309 |
artikel |
16 |
Detect and charge: Machine learning based fully data-driven framework for computing overweight vehicle fee for bridges
|
Gungor, Osman Erman |
|
2018 |
96 |
C |
p. 200-210 |
artikel |
17 |
Dimensional accuracy and structural performance assessment of spatial structure components using 3D laser scanning
|
Liu, Jindian |
|
2018 |
96 |
C |
p. 324-336 |
artikel |
18 |
Dynamic analysis of block offloading using self-propelled modular transporters
|
Ham, Seung-Ho |
|
2018 |
96 |
C |
p. 411-432 |
artikel |
19 |
Dynamic geometrical shape measurement and structural analysis of inflatable membrane structures using a low-cost three-camera system
|
Zhao, Bing |
|
2018 |
96 |
C |
p. 442-456 |
artikel |
20 |
Editorial Board
|
|
|
2018 |
96 |
C |
p. ii |
artikel |
21 |
Enhancing perceived safety in human–robot collaborative construction using immersive virtual environments
|
You, Sangseok |
|
2018 |
96 |
C |
p. 161-170 |
artikel |
22 |
Environmental impact assessment of Pinaceae airborne pollen and green infrastructure using BIM
|
Fernández-Rodríguez, Santiago |
|
2018 |
96 |
C |
p. 494-507 |
artikel |
23 |
Flexible double-cage hoist for high operational efficiency in tall building construction
|
Kim, Taehoon |
|
2018 |
96 |
C |
p. 280-291 |
artikel |
24 |
Formal representation of cost and duration estimates for hard rock tunnel excavation
|
Kim, Jung In |
|
2018 |
96 |
C |
p. 337-349 |
artikel |
25 |
From the generation of layouts to the production of construction documents: An application in the customization of apartment plans
|
Veloso, Pedro |
|
2018 |
96 |
C |
p. 224-235 |
artikel |
26 |
Generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction
|
Kim, Jung In |
|
2018 |
96 |
C |
p. 378-397 |
artikel |
27 |
Geographic capabilities and limitations of Industry Foundation Classes
|
Uggla, Gustaf |
|
2018 |
96 |
C |
p. 554-566 |
artikel |
28 |
Glass facade cleaning robot with passive suction cups and self-locking trapezoidal lead screw drive
|
Tun, Thein Than |
|
2018 |
96 |
C |
p. 180-188 |
artikel |
29 |
Image-based 3D reconstruction using traditional and UAV datasets for analysis of road pavement distress
|
Inzerillo, Laura |
|
2018 |
96 |
C |
p. 457-469 |
artikel |
30 |
Learning method for knowledge retention in CBR cost models
|
Ji, Sae-Hyun |
|
2018 |
96 |
C |
p. 65-74 |
artikel |
31 |
Modeling and problem solving of building defects using point clouds and enhanced case-based reasoning
|
Xu, Zhao |
|
2018 |
96 |
C |
p. 40-54 |
artikel |
32 |
Optimal and near-optimal indoor temperature and humidity controls for direct load control and proactive building demand response towards smart grids
|
Tang, Rui |
|
2018 |
96 |
C |
p. 250-261 |
artikel |
33 |
Planning and executing construction inspections with unmanned aerial vehicles
|
Freimuth, Henk |
|
2018 |
96 |
C |
p. 540-553 |
artikel |
34 |
Prioritizing object types for modelling existing industrial facilities
|
Agapaki, Eva |
|
2018 |
96 |
C |
p. 211-223 |
artikel |
35 |
Representing geographical uncertainties of utility location data in 3D
|
olde Scholtenhuis, Léon L. |
|
2018 |
96 |
C |
p. 483-493 |
artikel |
36 |
Self-correcting neural network in road pavement diagnostics
|
Staniek, Marcin |
|
2018 |
96 |
C |
p. 75-87 |
artikel |
37 |
Spatial compactness metrics and Constrained Voxel Automata development for analyzing 3D densification and applying to point clouds: A synthetic review
|
Shirowzhan, Sara |
|
2018 |
96 |
C |
p. 236-249 |
artikel |
38 |
Supporting constructability analysis meetings with Immersive Virtual Reality-based collaborative BIM 4D simulation
|
Boton, Conrad |
|
2018 |
96 |
C |
p. 1-15 |
artikel |
39 |
Sustainable Infrastructure Multi-Criteria Preference Assessment of Alternatives for Early Design
|
Shahtaheri, Yasaman |
|
2018 |
96 |
C |
p. 16-28 |
artikel |
40 |
Thrust force allocation method for shield tunneling machines under complex load conditions
|
Guo, Kai |
|
2018 |
96 |
C |
p. 141-147 |
artikel |
41 |
Tracked walking mechanism for large hydraulic excavators
|
Dong, Zhixin |
|
2018 |
96 |
C |
p. 88-102 |
artikel |
42 |
Vision-based integrated mobile robotic system for real-time applications in construction
|
Asadi, Khashayar |
|
2018 |
96 |
C |
p. 470-482 |
artikel |
43 |
Wearable insole pressure system for automated detection and classification of awkward working postures in construction workers
|
Antwi-Afari, Maxwell Fordjour |
|
2018 |
96 |
C |
p. 433-441 |
artikel |