nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A framework for integrating BIM and IoT through open standards
|
Dave, Bhargav |
|
|
95 |
C |
p. 35-45 |
artikel |
2 |
A method to optimize mobile crane and crew interactions to minimize construction cost and time
|
Peng, Bo |
|
|
95 |
C |
p. 10-19 |
artikel |
3 |
An integrated ergonomics framework for evaluation and design of construction operations
|
Golabchi, Alireza |
|
|
95 |
C |
p. 72-85 |
artikel |
4 |
A SPARQL query engine for binary-formatted IFC building models
|
Krijnen, Thomas |
|
|
95 |
C |
p. 46-63 |
artikel |
5 |
Automated assessment of vertical clearance on highways scanned using mobile LiDAR technology
|
Gargoum, Suliman A. |
|
|
95 |
C |
p. 260-274 |
artikel |
6 |
Automated Crane Planning and Optimization for modular construction
|
Taghaddos, Hosein |
|
|
95 |
C |
p. 219-232 |
artikel |
7 |
Automated detection of faults in sewers using CCTV image sequences
|
Myrans, Joshua |
|
|
95 |
C |
p. 64-71 |
artikel |
8 |
Automated detection of sewer pipe defects in closed-circuit television images using deep learning techniques
|
Cheng, Jack C.P. |
|
|
95 |
C |
p. 155-171 |
artikel |
9 |
Automated optimization of formwork design through spatial analysis in building information modeling
|
Hyun, Changtaek |
|
|
95 |
C |
p. 193-205 |
artikel |
10 |
Building Information Modeling (BIM) outsourcing among general contractors
|
Fountain, James |
|
|
95 |
C |
p. 107-117 |
artikel |
11 |
Digital engineering potential in addressing causes of construction accidents
|
Golizadeh, Hamed |
|
|
95 |
C |
p. 284-295 |
artikel |
12 |
Editorial Board
|
|
|
|
95 |
C |
p. ii |
artikel |
13 |
Form finding of nexorades using the translations method
|
Mesnil, Romain |
|
|
95 |
C |
p. 142-154 |
artikel |
14 |
Improved characterization of underground structure defects from two-stage Bayesian inversion using crosshole GPR data
|
Qin, Hui |
|
|
95 |
C |
p. 233-244 |
artikel |
15 |
Indoor localization strategy based on fault-tolerant area division for shipboard surveillance
|
Liu, Kezhong |
|
|
95 |
C |
p. 206-218 |
artikel |
16 |
Large-scale 3D printing by a team of mobile robots
|
Zhang, Xu |
|
|
95 |
C |
p. 98-106 |
artikel |
17 |
Morphogenesis of surfaces with planar lines of curvature and application to architectural design
|
Mesnil, Romain |
|
|
95 |
C |
p. 129-141 |
artikel |
18 |
Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
|
Arashpour, Mehrdad |
|
|
95 |
C |
p. 1-9 |
artikel |
19 |
Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components
|
Ma, Zhiliang |
|
|
95 |
C |
p. 86-97 |
artikel |
20 |
Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects
|
Li, Yongkui |
|
|
95 |
C |
p. 118-128 |
artikel |
21 |
Programmable hydraulic control technique in construction machinery: Status, challenges and countermeasures
|
Ding, Ruqi |
|
|
95 |
C |
p. 172-192 |
artikel |
22 |
Schedule risk analysis of infrastructure projects: A hybrid dynamic approach
|
Xu, Xiaoxiao |
|
|
95 |
C |
p. 20-34 |
artikel |
23 |
Survey of precedence relationships: Classification and algorithms
|
Hajdu, Miklos |
|
|
95 |
C |
p. 245-259 |
artikel |
24 |
Universal path planning for an indoor drone
|
Li, Fangyu |
|
|
95 |
C |
p. 275-283 |
artikel |