nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Additive manufacturing technology and its implementation in construction as an eco-innovative solution
|
Ghaffar, Seyed Hamidreza |
|
|
93 |
C |
p. 1-11 |
artikel |
2 |
A triangular mesh generator over free-form surfaces for architectural design
|
Wang, Qisheng |
|
|
93 |
C |
p. 280-292 |
artikel |
3 |
Automated performance measurement for 3D building modeling decisions
|
Yarmohammadi, Saman |
|
|
93 |
C |
p. 91-111 |
artikel |
4 |
Automated tower crane planning: leveraging 4-dimensional BIM and rule-based checking
|
Ji, Yuanshen |
|
|
93 |
C |
p. 78-90 |
artikel |
5 |
Automatic building information model reconstruction in high-density urban areas: Augmenting multi-source data with architectural knowledge
|
Chen, Ke |
|
|
93 |
C |
p. 22-34 |
artikel |
6 |
Automating and scaling personalized safety training using eye-tracking data
|
Jeelani, Idris |
|
|
93 |
C |
p. 63-77 |
artikel |
7 |
Cloud asset-enabled integrated IoT platform for lean prefabricated construction
|
Xu, Gangyan |
|
|
93 |
C |
p. 123-134 |
artikel |
8 |
Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment
|
Fang, Qi |
|
|
93 |
C |
p. 148-164 |
artikel |
9 |
Decision framework for optimal installation of outriggers in tall buildings
|
Zhou, Kang |
|
|
93 |
C |
p. 200-213 |
artikel |
10 |
Digital construction: From point solutions to IoT ecosystem
|
Woodhead, Roy |
|
|
93 |
C |
p. 35-46 |
artikel |
11 |
Distributed and interoperable simulation for comprehensive disaster response management in facilities
|
Choi, Minji |
|
|
93 |
C |
p. 12-21 |
artikel |
12 |
Editorial Board
|
|
|
|
93 |
C |
p. ii |
artikel |
13 |
EEG-based workers' stress recognition at construction sites
|
Jebelli, Houtan |
|
|
93 |
C |
p. 315-324 |
artikel |
14 |
Erratum to "Logic for ensuring the data exchange integrity of building information models [AUTCON 85 (2018) 249–262"]
|
|
|
|
93 |
C |
p. 387 |
artikel |
15 |
Evaluating performance of daylight-linked building controls during preliminary design
|
Bellia, Laura |
|
|
93 |
C |
p. 293-314 |
artikel |
16 |
Greenhouse gas emission monitoring system for manufacturing prefabricated components
|
Tao, Xingyu |
|
|
93 |
C |
p. 361-374 |
artikel |
17 |
Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project
|
Dong, Chao |
|
|
93 |
C |
p. 112-122 |
artikel |
18 |
Linking radio-frequency identification to Building Information Modeling: Status quo, development trajectory and guidelines for practitioners
|
Xue, Fan |
|
|
93 |
C |
p. 241-251 |
artikel |
19 |
Logic for ensuring the data exchange integrity of building information models
|
Lee, Yong-Cheol |
|
|
93 |
C |
p. 388-401 |
artikel |
20 |
Modeling space preferences for accurate occupancy prediction during the design phase
|
Cha, Seung Hyun |
|
|
93 |
C |
p. 135-147 |
artikel |
21 |
Modeling water flow on Façade
|
Park, Chul Woong |
|
|
93 |
C |
p. 265-279 |
artikel |
22 |
Monitor-While-Drilling-based estimation of rock mass rating with computational intelligence: The case of tunnel excavation front
|
Galende-Hernández, M. |
|
|
93 |
C |
p. 325-338 |
artikel |
23 |
Multi-point vibration measurement and mode magnification of civil structures using video-based motion processing
|
Shang, Zhexiong |
|
|
93 |
C |
p. 231-240 |
artikel |
24 |
Performative design environment for kinetic photovoltaic architecture
|
Jayathissa, P. |
|
|
93 |
C |
p. 339-347 |
artikel |
25 |
Pose and trajectory control of shield tunneling machine in complicated stratum
|
Wang, Lintao |
|
|
93 |
C |
p. 192-199 |
artikel |
26 |
Proactive 2D model-based scan planning for existing buildings
|
Chen, Meida |
|
|
93 |
C |
p. 165-177 |
artikel |
27 |
Project selection and scheduling for phase-able projects with interdependencies among phases
|
Shafahi, Ali |
|
|
93 |
C |
p. 47-62 |
artikel |
28 |
Review of Unmanned Aerial System (UAS) applications in the built environment: Towards automated building inspection procedures using drones
|
Rakha, Tarek |
|
|
93 |
C |
p. 252-264 |
artikel |
29 |
Safety leading indicators for construction sites: A machine learning approach
|
Poh, Clive Q.X. |
|
|
93 |
C |
p. 375-386 |
artikel |
30 |
Tower cranes layout planning using agent-based simulation considering activity conflicts
|
Younes, Ahmed |
|
|
93 |
C |
p. 348-360 |
artikel |
31 |
UAV path planning method for digital terrain model reconstruction – A debris fan example
|
Yang, Cheng-Hsuan |
|
|
93 |
C |
p. 214-230 |
artikel |
32 |
Utilizing IFC for shield segment assembly in underground tunneling
|
Zhou, Ying |
|
|
93 |
C |
p. 178-191 |
artikel |