nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
|
Poshdar, Mani |
|
|
92 |
C |
p. 46-58 |
artikel |
2 |
Analyzing context and productivity of tunnel earthmoving processes using imaging and simulation
|
Kim, Hongjo |
|
|
92 |
C |
p. 188-198 |
artikel |
3 |
A pedestrian tracking algorithm using grid-based indoor model
|
Xu, Weilin |
|
|
92 |
C |
p. 173-187 |
artikel |
4 |
A rule-based methodology to extract building model views
|
Farias, Tarcisio Mendes de |
|
|
92 |
C |
p. 214-229 |
artikel |
5 |
Assessing the energy and daylighting impacts of human behavior with window shades, a life-cycle comparison of manual and automated blinds
|
Nezamdoost, Amir |
|
|
92 |
C |
p. 133-150 |
artikel |
6 |
Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty
|
Ahmad, Zubair |
|
|
92 |
C |
p. 103-119 |
artikel |
7 |
Construction quality management based on a collaborative system using BIM and indoor positioning
|
Ma, Zhiliang |
|
|
92 |
C |
p. 35-45 |
artikel |
8 |
Digitisation in facilities management: A literature review and future research directions
|
Wong, Johnny Kwok Wai |
|
|
92 |
C |
p. 312-326 |
artikel |
9 |
Dynamic load prediction of tunnel boring machine (TBM) based on heterogeneous in-situ data
|
Sun, Wei |
|
|
92 |
C |
p. 23-34 |
artikel |
10 |
Editorial Board
|
|
|
|
92 |
C |
p. ii |
artikel |
11 |
Enumerating generic rectangular floor plans
|
Shekhawat, Krishnendra |
|
|
92 |
C |
p. 151-165 |
artikel |
12 |
Image-driven fuzzy-based system to construct as-is IFC BIM objects
|
Lu, Qiuchen |
|
|
92 |
C |
p. 68-87 |
artikel |
13 |
Mathematical model to optimally solve the lift planning problem in high-rise construction projects
|
Jalali Yazdi, Alireza |
|
|
92 |
C |
p. 120-132 |
artikel |
14 |
Multi-disciplinary and multi-objective optimization problem re-formulation in computational design exploration: A case of conceptual sports building design
|
Yang, Ding |
|
|
92 |
C |
p. 242-269 |
artikel |
15 |
Parametric and Generative Design techniques in mass-production environments as effective enablers of Industry 4.0 approaches in the Building Industry
|
Pasetti Monizza, Gabriele |
|
|
92 |
C |
p. 270-285 |
artikel |
16 |
Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall
|
GarcĂa de Soto, Borja |
|
|
92 |
C |
p. 297-311 |
artikel |
17 |
Review of hybrid electric systems for construction machinery
|
He, Xiangyu |
|
|
92 |
C |
p. 286-296 |
artikel |
18 |
Robotic data collection and simulation for evaluation of building retrofit performance
|
Mantha, Bharadwaj R.K. |
|
|
92 |
C |
p. 88-102 |
artikel |
19 |
Simulating the dynamics of social agents and information flows in BIM-based design
|
Al Hattab, Malak |
|
|
92 |
C |
p. 1-22 |
artikel |
20 |
Socioeconomic impact assessment of highly dense-urban construction projects
|
Ibrahim, Amir |
|
|
92 |
C |
p. 230-241 |
artikel |
21 |
Stability analysis of leaning historic masonry structures
|
D'Altri, Antonio Maria |
|
|
92 |
C |
p. 199-213 |
artikel |
22 |
Utilization analysis methodology for fleet telematics of heavy earthwork equipment
|
Lee, Seung Soo |
|
|
92 |
C |
p. 59-67 |
artikel |
23 |
Virtual outdoor air flow meter for an existing HVAC system in heating mode
|
Cotrufo, Nunzio |
|
|
92 |
C |
p. 166-172 |
artikel |