nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Accelerometer-based fall-portent detection algorithm for construction tiling operation
|
Fang, Yi-Cho |
|
2017 |
84 |
C |
p. 214-230 17 p. |
artikel |
2 |
An IFC-inspection process model for infrastructure projects: Enabling real-time quality monitoring and control
|
Ding, Lieyun |
|
2017 |
84 |
C |
p. 96-110 15 p. |
artikel |
3 |
A simplified relational database schema for transformation of BIM data into a query-efficient and spatially enabled database
|
Solihin, Wawan |
|
2017 |
84 |
C |
p. 367-383 17 p. |
artikel |
4 |
A type-2 fuzzy set model for contractor prequalification
|
Afshar, Mohammad Reza |
|
2017 |
84 |
C |
p. 356-366 11 p. |
artikel |
5 |
Automated seismic design of non-structural elements with building information modelling
|
Perrone, Daniele |
|
2017 |
84 |
C |
p. 166-175 10 p. |
artikel |
6 |
BIM-assisted labor productivity measurement method for structural formwork
|
Lee, Junbok |
|
2017 |
84 |
C |
p. 121-132 12 p. |
artikel |
7 |
BIM integrated smart monitoring technique for building fire prevention and disaster relief
|
Cheng, Min-Yuan |
|
2017 |
84 |
C |
p. 14-30 17 p. |
artikel |
8 |
BIMSL: A generic approach to the integration of building information models with real-time sensor data
|
Alves, Miguel |
|
2017 |
84 |
C |
p. 304-314 11 p. |
artikel |
9 |
Computational algorithm to automate as-built schedule development using digital daily work reports
|
Shrestha, K. Joseph |
|
2017 |
84 |
C |
p. 315-322 8 p. |
artikel |
10 |
Construction safety planning: Site-specific temporal and spatial information integration
|
Choe, Sooyoung |
|
2017 |
84 |
C |
p. 335-344 10 p. |
artikel |
11 |
Data visualization and analysis of energy flow on a multi-zone building scale
|
Abdelalim, Aly |
|
2017 |
84 |
C |
p. 258-273 16 p. |
artikel |
12 |
Design to fabrication method of thin shell structures based on a friction-fit connection system
|
Tepavčević, Bojan |
|
2017 |
84 |
C |
p. 207-213 7 p. |
artikel |
13 |
Evaluating wheel loader operating conditions based on radar chart
|
W.A.N.G., Shaojie |
|
2017 |
84 |
C |
p. 42-49 8 p. |
artikel |
14 |
Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixers
|
Liu, Zhenyuan |
|
2017 |
84 |
C |
p. 1-13 13 p. |
artikel |
15 |
Identifying poses of safe and productive masons using machine learning
|
Alwasel, Abdullatif |
|
2017 |
84 |
C |
p. 345-355 11 p. |
artikel |
16 |
Immersive environment for improving the understanding of architectural 3D models: Comparing user spatial perception between immersive and traditional virtual reality systems
|
Paes, Daniel |
|
2017 |
84 |
C |
p. 292-303 12 p. |
artikel |
17 |
Improving dynamic proximity sensing and processing for smart work-zone safety
|
Park, JeeWoong |
|
2017 |
84 |
C |
p. 111-120 10 p. |
artikel |
18 |
Inside Front Cover: Editorial Board
|
|
|
2017 |
84 |
C |
p. IFC- 1 p. |
artikel |
19 |
Lower bounds for as-built deviations against as-designed 3-D Building Information Model from single spherical panoramic image
|
Jokinen, Olli |
|
2017 |
84 |
C |
p. 274-291 18 p. |
artikel |
20 |
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
|
Li, Xiao |
|
2017 |
84 |
C |
p. 195-206 12 p. |
artikel |
21 |
Modelling the boundaries of project fast-tracking
|
Ballesteros-Pérez, Pablo |
|
2017 |
84 |
C |
p. 231-241 11 p. |
artikel |
22 |
Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
|
Arashpour, Mehrdad |
|
2017 |
84 |
C |
p. 146-153 8 p. |
artikel |
23 |
Performance analysis of an automatic idle speed control system with a hydraulic accumulator for pure electric construction machinery
|
Lin, Tianliang |
|
2017 |
84 |
C |
p. 184-194 11 p. |
artikel |
24 |
Planning the reconstruction of a historical building by using a fuzzy stochastic network
|
Radziszewska-Zielina, Elżbieta |
|
2017 |
84 |
C |
p. 242-257 16 p. |
artikel |
25 |
Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring
|
Rebolj, Danijel |
|
2017 |
84 |
C |
p. 323-334 12 p. |
artikel |
26 |
Predictive operator modeling for virtual prototyping of hydraulic excavators
|
Bender, Frank A. |
|
2017 |
84 |
C |
p. 133-145 13 p. |
artikel |
27 |
Project collective mind: Unlocking project discussion networks
|
Nik-Bakht, Mazdak |
|
2017 |
84 |
C |
p. 50-69 20 p. |
artikel |
28 |
System information modelling in practice: Analysis of tender documentation quality in a mining mega-project
|
Love, P.E.D. |
|
2017 |
84 |
C |
p. 176-183 8 p. |
artikel |
29 |
UAV-based automatic generation of high-resolution panorama at a construction site with a focus on preprocessing for image stitching
|
Bang, Seongdeok |
|
2017 |
84 |
C |
p. 70-80 11 p. |
artikel |
30 |
Usability evaluation of a web-based tool for supporting holistic building energy management
|
McGlinn, Kris |
|
2017 |
84 |
C |
p. 154-165 12 p. |
artikel |
31 |
Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims
|
Ballesteros-Pérez, Pablo |
|
2017 |
84 |
C |
p. 81-95 15 p. |
artikel |
32 |
What drives construction workers' acceptance of wearable technologies in the workplace?: Indoor localization and wearable health devices for occupational safety and health
|
Choi, Byungjoo |
|
2017 |
84 |
C |
p. 31-41 11 p. |
artikel |