nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Accurate measurement of pavement deflection velocity under dynamic loads
|
He, Li |
|
2017 |
83 |
C |
p. 149-162 14 p. |
artikel |
2 |
Addressing design preferences via auto-associative connectionist models: Application in sustainable architectural Façade design
|
Chatzikonstantinou, Ioannis |
|
2017 |
83 |
C |
p. 108-120 13 p. |
artikel |
3 |
A force transmission assessment method for thrust system in shield machines based on the relative coefficient in compound ground
|
Deng, Kongshu |
|
2017 |
83 |
C |
p. 354-359 6 p. |
artikel |
4 |
A framework of innovative learning for skill development in complex operational tasks
|
Hou, Lei |
|
2017 |
83 |
C |
p. 29-40 12 p. |
artikel |
5 |
An algorithm for optimizing terrestrial laser scanning in tunnels
|
Cabo, Carlos |
|
2017 |
83 |
C |
p. 163-168 6 p. |
artikel |
6 |
Analysis of construction trade worker body motions using a wearable and wireless motion sensor network
|
Valero, Enrique |
|
2017 |
83 |
C |
p. 48-55 8 p. |
artikel |
7 |
A tunnel information modelling framework to support management, simulations and visualisations in mechanised tunnelling projects
|
Koch, Christian |
|
2017 |
83 |
C |
p. 78-90 13 p. |
artikel |
8 |
Automated re-prefabrication system for buildings using robotics
|
Kasperzyk, Cuong |
|
2017 |
83 |
C |
p. 184-195 12 p. |
artikel |
9 |
Biomechanical analysis of risk factors for work-related musculoskeletal disorders during repetitive lifting task in construction workers
|
Antwi-Afari, M.F. |
|
2017 |
83 |
C |
p. 41-47 7 p. |
artikel |
10 |
Building Information Modeling (BIM) for green buildings: A critical review and future directions
|
Lu, Yujie |
|
2017 |
83 |
C |
p. 134-148 15 p. |
artikel |
11 |
Building Information Modeling enabled Cascading Formwork Management Tool
|
Mansuri, Dolly |
|
2017 |
83 |
C |
p. 259-272 14 p. |
artikel |
12 |
Classification of building systems for concrete 3D printing
|
Duballet, R. |
|
2017 |
83 |
C |
p. 247-258 12 p. |
artikel |
13 |
Coordinating multi-site construction projects using federated clouds
|
Petri, Ioan |
|
2017 |
83 |
C |
p. 273-284 12 p. |
artikel |
14 |
Credible interval estimation for fraction nonconforming: Analytical and numerical solutions
|
Ji, Wenying |
|
2017 |
83 |
C |
p. 56-67 12 p. |
artikel |
15 |
Developing owner information requirements for BIM-enabled project delivery and asset management
|
Cavka, Hasan Burak |
|
2017 |
83 |
C |
p. 169-183 15 p. |
artikel |
16 |
Development of a wall-climbing platform with modularized wall-cleaning units
|
Kim, Taegyun |
|
2017 |
83 |
C |
p. 1-18 18 p. |
artikel |
17 |
Effects of interlocking on interlayer adhesion and strength of structures in 3D printing of concrete
|
Zareiyan, Babak |
|
2017 |
83 |
C |
p. 212-221 10 p. |
artikel |
18 |
Energy conservation through flexible HVAC management in large spaces: An IPS-based demand-driven control (IDC) system
|
Wang, Wei |
|
2017 |
83 |
C |
p. 91-107 17 p. |
artikel |
19 |
Identification of workstations in earthwork operations from vehicle GPS data
|
Fu, Jiali |
|
2017 |
83 |
C |
p. 237-246 10 p. |
artikel |
20 |
Image-based construction hazard avoidance system using augmented reality in wearable device
|
Kim, Kinam |
|
2017 |
83 |
C |
p. 390-403 14 p. |
artikel |
21 |
Inside Front Cover: Editorial Board
|
|
|
2017 |
83 |
C |
p. IFC- 1 p. |
artikel |
22 |
Isoradial meshes: Covering elastic gridshells with planar facets
|
Douthe, Cyril |
|
2017 |
83 |
C |
p. 222-236 15 p. |
artikel |
23 |
“JA-WA” - A wall construction system using unilateral material application with a mobile robot
|
Więckowski, Andrzej |
|
2017 |
83 |
C |
p. 19-28 10 p. |
artikel |
24 |
Laser-based surface damage detection and quantification using predicted surface properties
|
Guldur Erkal, Burcu |
|
2017 |
83 |
C |
p. 285-302 18 p. |
artikel |
25 |
Managing risk in modular construction using dimensional and geometric tolerance strategies
|
Shahtaheri, Yasaman |
|
2017 |
83 |
C |
p. 303-315 13 p. |
artikel |
26 |
Near optimum selection of module configuration for efficient modular construction
|
Salama, Tarek |
|
2017 |
83 |
C |
p. 316-329 14 p. |
artikel |
27 |
Pothole detection on asphalt pavements from 2D-colour pothole images using fuzzy c-means clustering and morphological reconstruction
|
Ouma, Yashon O. |
|
2017 |
83 |
C |
p. 196-211 16 p. |
artikel |
28 |
Prediction-based stochastic dynamic programming control for excavator
|
Zhou, Hua |
|
2017 |
83 |
C |
p. 68-77 10 p. |
artikel |
29 |
Remote sensing of concrete bridge decks using unmanned aerial vehicle infrared thermography
|
Omar, Tarek |
|
2017 |
83 |
C |
p. 360-371 12 p. |
artikel |
30 |
Safety barrier warning system for underground construction sites using Internet-of-Things technologies
|
Zhou, C. |
|
2017 |
83 |
C |
p. 372-389 18 p. |
artikel |
31 |
Wearable sensors for monitoring on-duty and off-duty worker physiological status and activities in construction
|
Lee, Wonil |
|
2017 |
83 |
C |
p. 341-353 13 p. |
artikel |
32 |
Work packaging with BIM
|
Isaac, Shabtai |
|
2017 |
83 |
C |
p. 121-133 13 p. |
artikel |
33 |
Wristband-type wearable health devices to measure construction workers' physical demands
|
Hwang, Sungjoo |
|
2017 |
83 |
C |
p. 330-340 11 p. |
artikel |