nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An adaptive approach for the reconstruction and modeling of as-built 3D pipelines from point clouds
|
Patil, Ashok Kumar |
|
2017 |
75 |
C |
p. 65-78 14 p. |
artikel |
2 |
An effective approach with feasible space decomposition to solve resource-constrained project scheduling problems
|
Liu, Zhenyuan |
|
2017 |
75 |
C |
p. 1-9 9 p. |
artikel |
3 |
A System Identification Methodology to monitor construction activities using structural responses
|
Soman, Ranjith K. |
|
2017 |
75 |
C |
p. 79-90 12 p. |
artikel |
4 |
A technology for sewer pipe inspection (part 1): Design, calibration, corrections and potential application of a laser profiler
|
Stanić, Nikola |
|
2017 |
75 |
C |
p. 91-107 17 p. |
artikel |
5 |
C-Negotiation Game: An educational game model for construction procurement and negotiation
|
Dzeng, Ren-Jye |
|
2017 |
75 |
C |
p. 10-21 12 p. |
artikel |
6 |
Editorial Board
|
|
|
2017 |
75 |
C |
p. IFC- 1 p. |
artikel |
7 |
Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds
|
Rausch, Christopher |
|
2017 |
75 |
C |
p. 33-44 12 p. |
artikel |
8 |
Multimodels — Instant nD-modeling using original data
|
Fuchs, Sebastian |
|
2017 |
75 |
C |
p. 22-32 11 p. |
artikel |
9 |
Non-parametric weather generator for modelling construction operations: Comparison with the parametric approach and evaluation of construction-based impacts
|
Al-alawi, Mubarak |
|
2017 |
75 |
C |
p. 108-126 19 p. |
artikel |
10 |
Pick-and-place process sequencing for transformation of rasterized 3D structures
|
Pan, Wei |
|
2017 |
75 |
C |
p. 56-64 9 p. |
artikel |
11 |
The building information modelling trajectory in facilities management: A review
|
Pärn, E.A. |
|
2017 |
75 |
C |
p. 45-55 11 p. |
artikel |