nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A mixed-integer linear programming approach for temporary haul road design in rough-grading projects
|
Yi, Chaojue |
|
|
71 |
P2 |
p. 314-324 |
artikel |
2 |
A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction
|
Anvari, B. |
|
|
71 |
P2 |
p. 226-241 |
artikel |
3 |
A remote measurement and mapping technique for orderly rapid aggregation of building stock geometry
|
Pittam, James |
|
|
71 |
P2 |
p. 382-397 |
artikel |
4 |
Automatic image acquisition with knowledge-based approach for multi-directional determination of skid resistance of pavements
|
Nejad, Fereidoon Moghadas |
|
|
71 |
P2 |
p. 414-429 |
artikel |
5 |
BIM for infrastructure: An overall review and constructor perspective
|
Bradley, Alex |
|
|
71 |
P2 |
p. 139-152 |
artikel |
6 |
Cyclic overlapping block coordinate search for optimizing building design
|
Brunetti, Gian Luca |
|
|
71 |
P2 |
p. 242-261 |
artikel |
7 |
Data-driven scene parsing method for recognizing construction site objects in the whole image
|
Kim, Hongjo |
|
|
71 |
P2 |
p. 271-282 |
artikel |
8 |
Detection of rust defects on steel bridge coatings via digital image recognition
|
Liao, Kuo-Wei |
|
|
71 |
P2 |
p. 294-306 |
artikel |
9 |
Development of an automated modeler of environment and energy geographic information (E-GIS) for ecofriendly city planning
|
Yeo, In-Ae |
|
|
71 |
P2 |
p. 398-413 |
artikel |
10 |
Editorial Board
|
|
|
|
71 |
P2 |
p. IFC |
artikel |
11 |
Experimental and numerical study of full-scale scissor type bridge
|
Chikahiro, Yuki |
|
|
71 |
P2 |
p. 171-180 |
artikel |
12 |
Feasibility analysis of heart rate monitoring of construction workers using a photoplethysmography (PPG) sensor embedded in a wristband-type activity tracker
|
Hwang, Sungjoo |
|
|
71 |
P2 |
p. 372-381 |
artikel |
13 |
Hazard-based model for concrete pouring duration using construction site and supply chain parameters
|
Ghasri, Milad |
|
|
71 |
P2 |
p. 283-293 |
artikel |
14 |
Hybrid PSO and GA approach for optimizing surveyed asphalt pavement inspection units in massive network
|
Nik, Ashkan Allahyari |
|
|
71 |
P2 |
p. 325-345 |
artikel |
15 |
Macro-photogrammetry as a tool for the accurate measurement of three-dimensional misalignment in welding
|
Rodríguez-Martín, M. |
|
|
71 |
P2 |
p. 189-197 |
artikel |
16 |
Micro-motion level simulation for efficiency analysis and duration estimation of manual operations
|
Golabchi, Alireza |
|
|
71 |
P2 |
p. 443-452 |
artikel |
17 |
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm
|
El-Abbasy, Mohammed S. |
|
|
71 |
P2 |
p. 153-170 |
artikel |
18 |
Motion stability modal shaping for wheeled unsprung construction machinery
|
Chwastek, Stefan |
|
|
71 |
P2 |
p. 307-313 |
artikel |
19 |
Object oriented modeling: Retrospective systems information model for constructability assessment
|
Love, Peter E.D. |
|
|
71 |
P2 |
p. 359-371 |
artikel |
20 |
Off-site construction optimization: Sequencing multiple job classes with time constraints
|
Arashpour, Mehrdad |
|
|
71 |
P2 |
p. 262-270 |
artikel |
21 |
Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor
|
Czerniawski, Thomas |
|
|
71 |
P2 |
p. 346-358 |
artikel |
22 |
Simulation-based route planning for pedestrian evacuation in metro stations: A case study
|
Zhang, Limao |
|
|
71 |
P2 |
p. 430-442 |
artikel |
23 |
Smartphone-based construction workers' activity recognition and classification
|
Akhavian, Reza |
|
|
71 |
P2 |
p. 198-209 |
artikel |
24 |
The Extensible Orchestration Framework approach to collaborative design in architectural, urban and construction engineering
|
Perisic, Ana |
|
|
71 |
P2 |
p. 210-225 |
artikel |
25 |
Vision-based detection of loosened bolts using the Hough transform and support vector machines
|
Cha, Young-Jin |
|
|
71 |
P2 |
p. 181-188 |
artikel |