nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A sensor fault detection strategy for air handling units using cluster analysis
|
Yan, Rui |
|
2016 |
70 |
C |
p. 77-88 12 p. |
artikel |
2 |
Building performance optimisation: A hybrid architecture for the integration of contextual information and time-series data
|
Hu, Shushan |
|
2016 |
70 |
C |
p. 51-61 11 p. |
artikel |
3 |
Construction cost and energy performance of single family houses: From integrated design to automated optimization
|
Chardon, Serge |
|
2016 |
70 |
C |
p. 1-13 13 p. |
artikel |
4 |
Data acquisition technologies for construction progress tracking
|
Omar, Tarek |
|
2016 |
70 |
C |
p. 143-155 13 p. |
artikel |
5 |
Editorial Board
|
|
|
2016 |
70 |
C |
p. IFC- 1 p. |
artikel |
6 |
Energy systems in cost-optimized design of nearly zero-energy buildings
|
Ferrara, Maria |
|
2016 |
70 |
C |
p. 109-127 19 p. |
artikel |
7 |
Forecasting short-term air passenger demand using big data from search engine queries
|
Kim, Seongdo |
|
2016 |
70 |
C |
p. 98-108 11 p. |
artikel |
8 |
Genetic programming for experimental big data mining: A case study on concrete creep formulation
|
Gandomi, Amir H. |
|
2016 |
70 |
C |
p. 89-97 9 p. |
artikel |
9 |
Green building assessment tool (GBAT) for integrated BIM-based design decisions
|
Ilhan, Bahriye |
|
2016 |
70 |
C |
p. 26-37 12 p. |
artikel |
10 |
Integral lifting simulation of long-span spatial steel structures during construction
|
Tian, Limin |
|
2016 |
70 |
C |
p. 156-166 11 p. |
artikel |
11 |
Integrating work sequences and temporary structures into safety planning: Automated scaffolding-related safety hazard identification and prevention in BIM
|
Kim, Kyungki |
|
2016 |
70 |
C |
p. 128-142 15 p. |
artikel |
12 |
Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions
|
Su, Yi |
|
2016 |
70 |
C |
p. 38-50 13 p. |
artikel |
13 |
Optimal construction site layout based on risk spatial variability
|
Abune'meh, M. |
|
2016 |
70 |
C |
p. 167-177 11 p. |
artikel |
14 |
Sequential ordering of crane service requests considering the pending times of the requests: An approach based on game theory and optimization techniques
|
Monghasemi, Shahryar |
|
2016 |
70 |
C |
p. 62-76 15 p. |
artikel |
15 |
Virtual operator modeling method for excavator trenching
|
Du, Yu |
|
2016 |
70 |
C |
p. 14-25 12 p. |
artikel |