nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A BIM-aided construction waste minimisation framework
|
Liu, Zhen |
|
2015 |
59 |
C |
p. 1-23 23 p. |
artikel |
2 |
A BIM-based approach for automated tower crane layout planning
|
Wang, Jun |
|
2015 |
59 |
C |
p. 168-178 11 p. |
artikel |
3 |
A BIM-based automated site layout planning framework for congested construction sites
|
Kumar, Srinath S. |
|
2015 |
59 |
C |
p. 24-37 14 p. |
artikel |
4 |
Advanced power supply of construction hoists for supertall buildings
|
Lim, Hyunsu |
|
2015 |
59 |
C |
p. 48-58 11 p. |
artikel |
5 |
An automated direction setting algorithm for a smart exit sign
|
Cho, Jehyun |
|
2015 |
59 |
C |
p. 139-148 10 p. |
artikel |
6 |
Applying building information modeling to support fire safety management
|
Wang, Shih-Hsu |
|
2015 |
59 |
C |
p. 158-167 10 p. |
artikel |
7 |
Competitive intelligence (CI) for evaluation of construction contractors
|
Safa, Mahdi |
|
2015 |
59 |
C |
p. 149-157 9 p. |
artikel |
8 |
Editorial Board
|
|
|
2015 |
59 |
C |
p. IFC- 1 p. |
artikel |
9 |
Editorial: ISARC 2014
|
Ha, Quang |
|
2015 |
59 |
C |
p. 97-98 2 p. |
artikel |
10 |
Isogonal moulding surfaces: A family of shapes for high node congruence in free-form structures
|
Mesnil, Romain |
|
2015 |
59 |
C |
p. 38-47 10 p. |
artikel |
11 |
Modelling and robust trajectory following for offshore container crane systems
|
Raja Ismail, R.M.T. |
|
2015 |
59 |
C |
p. 179-187 9 p. |
artikel |
12 |
Optimization of overlapping activities in the design phase of construction projects
|
Dehghan, Reza |
|
2015 |
59 |
C |
p. 81-95 15 p. |
artikel |
13 |
Past, present and future of robotic tunnel inspection
|
Montero, R. |
|
2015 |
59 |
C |
p. 99-112 14 p. |
artikel |
14 |
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
|
Yalcinkaya, Mehmet |
|
2015 |
59 |
C |
p. 68-80 13 p. |
artikel |
15 |
The future of construction automation: Technological disruption and the upcoming ubiquity of robotics
|
Bock, Thomas |
|
2015 |
59 |
C |
p. 113-121 9 p. |
artikel |
16 |
Toward sustainable energy usage in the power generation and construction sectors—a case study of Australia
|
Azzi, Merched |
|
2015 |
59 |
C |
p. 122-127 6 p. |
artikel |
17 |
Virtual in-situ calibration method in building systems
|
Yu, Yuebin |
|
2015 |
59 |
C |
p. 59-67 9 p. |
artikel |
18 |
Vision guided autonomous robotic assembly and as-built scanning on unstructured construction sites
|
Feng, Chen |
|
2015 |
59 |
C |
p. 128-138 11 p. |
artikel |