nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A multi-objective feedback approach for evaluating sequential conceptual building design decisions
|
Basbagill, John P. |
|
2014 |
45 |
C |
p. 136-150 15 p. |
artikel |
2 |
An innovative method for project control in LNG project through 5D CAD: A case study
|
Wang, Xiangyu |
|
2014 |
45 |
C |
p. 126-135 10 p. |
artikel |
3 |
A review of application of multi-criteria decision making methods in construction
|
Jato-Espino, Daniel |
|
2014 |
45 |
C |
p. 151-162 12 p. |
artikel |
4 |
Artificial neural network models for predicting condition of offshore oil and gas pipelines
|
El-Abbasy, Mohammed S. |
|
2014 |
45 |
C |
p. 50-65 16 p. |
artikel |
5 |
A semi-automatic processing and visualisation tool for ground-penetrating radar pavement thickness data
|
Varela-González, María |
|
2014 |
45 |
C |
p. 42-49 8 p. |
artikel |
6 |
Asynchronous online collaboration in BIM generation using hybrid client-server and P2P network
|
Chen, Hung-Ming |
|
2014 |
45 |
C |
p. 72-85 14 p. |
artikel |
7 |
Automated dimensional quality assessment of precast concrete panels using terrestrial laser scanning
|
Kim, Min-Koo |
|
2014 |
45 |
C |
p. 163-177 15 p. |
artikel |
8 |
Automating motion trajectory Of crane-lifted loads
|
Olearczyk, Jacek |
|
2014 |
45 |
C |
p. 178-186 9 p. |
artikel |
9 |
BIM as a generic configurator for facilitation of customisation in the AEC industry
|
Farr, Eric R.P. |
|
2014 |
45 |
C |
p. 119-125 7 p. |
artikel |
10 |
CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
|
Riaz, Zainab |
|
2014 |
45 |
C |
p. 96-106 11 p. |
artikel |
11 |
Creating flexible mappings between Building Information Models and cost information
|
Lawrence, Michael |
|
2014 |
45 |
C |
p. 107-118 12 p. |
artikel |
12 |
Editorial Board
|
|
|
2014 |
45 |
C |
p. IFC- 1 p. |
artikel |
13 |
Green construction hoist with customized energy regeneration system
|
Lee, Myungdo |
|
2014 |
45 |
C |
p. 66-71 6 p. |
artikel |
14 |
Identifying and assessing critical risk factors for BIM projects: Empirical study
|
Chien, Kuo-Feng |
|
2014 |
45 |
C |
p. 1-15 15 p. |
artikel |
15 |
Particle bee algorithm for tower crane layout with material quantity supply and demand optimization
|
Lien, Li-Chuan |
|
2014 |
45 |
C |
p. 25-32 8 p. |
artikel |
16 |
Phagocytosis-based camera-in-situ method for pile load testing
|
Raza, Ali |
|
2014 |
45 |
C |
p. 33-41 9 p. |
artikel |
17 |
Simulation-based support for product development of innovative building envelope components
|
Loonen, R.C.G.M. |
|
2014 |
45 |
C |
p. 86-95 10 p. |
artikel |
18 |
Thermal crack control in mass concrete structure using an automated curing system
|
Ha, Ju-Hyung |
|
2014 |
45 |
C |
p. 16-24 9 p. |
artikel |