nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics
|
Dong, Bing |
|
2014 |
44 |
C |
p. 197-211 15 p. |
artikel |
2 |
Activity Gazer: A multi-dimensional visual representation of project performance
|
Lee, Namhun |
|
2014 |
44 |
C |
p. 25-32 8 p. |
artikel |
3 |
An explanatory case study on cloud computing applications in the built environment
|
Chong, Heap-Yih |
|
2014 |
44 |
C |
p. 152-162 11 p. |
artikel |
4 |
Automating surface flatness control using terrestrial laser scanning and building information models
|
Bosché, Frédéric |
|
2014 |
44 |
C |
p. 212-226 15 p. |
artikel |
5 |
Building information modeling and discrete event simulation: Towards an integrated framework
|
Lu, Weizhuo |
|
2014 |
44 |
C |
p. 73-83 11 p. |
artikel |
6 |
Collision avoidance, virtual guides and advanced supervisory control teleoperation techniques for high-tech construction: framework design
|
David, Olivier |
|
2014 |
44 |
C |
p. 63-72 10 p. |
artikel |
7 |
Compaction quality assessment of earth-rock dam materials using roller-integrated compaction monitoring technology
|
Liu, Donghai |
|
2014 |
44 |
C |
p. 234-246 13 p. |
artikel |
8 |
Development of 3D camera-based robust bolt-hole detection system for bolting cabin
|
Mo, Yung-Hak |
|
2014 |
44 |
C |
p. 1-11 11 p. |
artikel |
9 |
Durability of current renderings: A probabilistic analysis
|
Silva, A. |
|
2014 |
44 |
C |
p. 92-102 11 p. |
artikel |
10 |
Dynamic modelling of hydraulic excavator motion using Kane's equations
|
Šalinić, S. |
|
2014 |
44 |
C |
p. 56-62 7 p. |
artikel |
11 |
Editorial Board
|
|
|
2014 |
44 |
C |
p. IFC- 1 p. |
artikel |
12 |
Enhancing submittal review and construction inspection in public projects
|
Ko, Chien-Ho |
|
2014 |
44 |
C |
p. 33-46 14 p. |
artikel |
13 |
Evaluation of artificial intelligence tool performance and uncertainty for predicting sewer structural condition
|
Sousa, Vitor |
|
2014 |
44 |
C |
p. 84-91 8 p. |
artikel |
14 |
Evaluation of visualization techniques for use by facility operators during monitoring tasks
|
Yang, Xue |
|
2014 |
44 |
C |
p. 103-118 16 p. |
artikel |
15 |
Implementing ‘BEAM Plus’ for BIM-based sustainability analysis
|
Wong, Johnny Kwok-Wai |
|
2014 |
44 |
C |
p. 163-175 13 p. |
artikel |
16 |
Lift path planning for a nonholonomic crawler crane
|
Lin, Yuanshan |
|
2014 |
44 |
C |
p. 12-24 13 p. |
artikel |
17 |
Multi-objective genetic optimization for scheduling a multi-storey building
|
Agrama, Fatma A. |
|
2014 |
44 |
C |
p. 119-128 10 p. |
artikel |
18 |
New launching method for steel bridges based on a self-supporting deck system: FEM and DOE analyses
|
Navarro-Manso, Antonio |
|
2014 |
44 |
C |
p. 183-196 14 p. |
artikel |
19 |
New mechanism for continuous and bidirectional displacement of heavy structures: Design and analysis
|
Alonso-Martínez, M. |
|
2014 |
44 |
C |
p. 47-55 9 p. |
artikel |
20 |
Physiological condition monitoring of construction workers
|
Gatti, Umberto C. |
|
2014 |
44 |
C |
p. 227-233 7 p. |
artikel |
21 |
The time dimension in site layout planning
|
Andayesh, Mohsen |
|
2014 |
44 |
C |
p. 129-139 11 p. |
artikel |
22 |
Use of digital image processing techniques for evaluating wear of cemented carbide bits in rotary drilling
|
Saeidi, Omid |
|
2014 |
44 |
C |
p. 140-151 12 p. |
artikel |
23 |
Using PLS-PM to model the process of inter-project learning in construction projects
|
Alashwal, Ali Mohammed |
|
2014 |
44 |
C |
p. 176-182 7 p. |
artikel |