nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A knowledge-based risk mapping tool for cost estimation of international construction projects
|
Yildiz, Acelya Ecem |
|
2014 |
43 |
C |
p. 144-155 12 p. |
artikel |
2 |
A new approach for automation of location-based earthwork scheduling in road construction projects
|
Shah, Raj Kapur |
|
2014 |
43 |
C |
p. 156-169 14 p. |
artikel |
3 |
Application of pattern matching method for detecting faults in air handling unit system
|
Li, Shun |
|
2014 |
43 |
C |
p. 49-58 10 p. |
artikel |
4 |
Automated multi-objective construction logistics optimization system
|
Said, Hisham |
|
2014 |
43 |
C |
p. 110-122 13 p. |
artikel |
5 |
Beyond the BIM utopia: Approaches to the development and implementation of building information modeling
|
Miettinen, Reijo |
|
2014 |
43 |
C |
p. 84-91 8 p. |
artikel |
6 |
Building automation and control systems: A case study to evaluate the energy and environmental performances of a lighting control system in offices
|
Aghemo, C. |
|
2014 |
43 |
C |
p. 10-22 13 p. |
artikel |
7 |
Construction spatial modeling and scheduling with three-dimensional singularity functions
|
Lucko, Gunnar |
|
2014 |
43 |
C |
p. 132-143 12 p. |
artikel |
8 |
Corrigendum to “A social network system for sharing construction safety and health knowledge” [Autom. Constr. 46 (2014) pages 30-37]
|
Le, Quang Tuan |
|
2014 |
43 |
C |
p. 30- 1 p. |
artikel |
9 |
Corrigendum to “Building Information Modeling (BIM) for existing buildings — Literature review and future needs” [Autom. Constr. 38 (March 2014) 109–127]
|
Volk, Rebekka |
|
2014 |
43 |
C |
p. 204- 1 p. |
artikel |
10 |
Deployable scissor arch for transitional shelters
|
Alegria Mira, Lara |
|
2014 |
43 |
C |
p. 123-131 9 p. |
artikel |
11 |
Designing building façades for the urban rebuilt environment with integration of digital close-range photogrammetry and geographical information systems
|
Aydin, Cevdet Coskun |
|
2014 |
43 |
C |
p. 38-48 11 p. |
artikel |
12 |
Distance-weighted isovist area: An isovist index representing spatial proximity
|
Kim, Youngchul |
|
2014 |
43 |
C |
p. 92-97 6 p. |
artikel |
13 |
Editorial Board
|
|
|
2014 |
43 |
C |
p. IFC- 1 p. |
artikel |
14 |
Evolution of the crane selection and on-site utilization process for modular construction multilifts
|
Olearczyk, Jacek |
|
2014 |
43 |
C |
p. 59-72 14 p. |
artikel |
15 |
Improving occupants' satisfaction with effective maintenance management of HVAC system in office buildings
|
Au-Yong, Cheong Peng |
|
2014 |
43 |
C |
p. 31-37 7 p. |
artikel |
16 |
Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management
|
Motamedi, Ali |
|
2014 |
43 |
C |
p. 73-83 11 p. |
artikel |
17 |
Methodology for the ovalization monitoring of newly built circular train tunnels based on laser scanning: Liefkenshoek Rail Link (Belgium)
|
Nuttens, Timothy |
|
2014 |
43 |
C |
p. 1-9 9 p. |
artikel |
18 |
Model Predictive Control of thermal comfort as a benchmark for controller performance
|
Hazyuk, Ion |
|
2014 |
43 |
C |
p. 98-109 12 p. |
artikel |
19 |
Parallel vs. Sequential Cascading MEP Coordination Strategies: A Pharmaceutical Building Case Study
|
Lee, Ghang |
|
2014 |
43 |
C |
p. 170-179 10 p. |
artikel |
20 |
Predicting construction cost overruns using text mining, numerical data and ensemble classifiers
|
Williams, Trefor P. |
|
2014 |
43 |
C |
p. 23-29 7 p. |
artikel |
21 |
Sharing of Temporary Structures: Formalization and Planning Application
|
Kim, Jonghoon |
|
2014 |
43 |
C |
p. 187-194 8 p. |
artikel |
22 |
Social e-business as support for construction e-procurement: e-procurement network dynamics
|
Costa, António Aguiar |
|
2014 |
43 |
C |
p. 180-186 7 p. |
artikel |
23 |
The attribute impact concept: Applications in case-based reasoning and parametric cost estimation
|
Ahn, Joseph |
|
2014 |
43 |
C |
p. 195-203 9 p. |
artikel |