nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A BIM centered indoor localization algorithm to support building fire emergency response operations
|
Li, Nan |
|
2014 |
42 |
C |
p. 78-89 12 p. |
artikel |
2 |
Automatic clustering of construction project documents based on textual similarity
|
Al Qady, Mohammed |
|
2014 |
42 |
C |
p. 36-49 14 p. |
artikel |
3 |
Component based engineering of a mobile BIM-based augmented reality system
|
Meža, Sebastjan |
|
2014 |
42 |
C |
p. 1-12 12 p. |
artikel |
4 |
Control of fast crane operation
|
Kuo, Tai-Yen Thomas |
|
2014 |
42 |
C |
p. 25-35 11 p. |
artikel |
5 |
Control of indoor CO2 concentration based on a process model
|
Škrjanc, Igor |
|
2014 |
42 |
C |
p. 122-126 5 p. |
artikel |
6 |
Dynamics of an overhead crane under a wind disturbance condition
|
Tomczyk, Jerzy |
|
2014 |
42 |
C |
p. 100-111 12 p. |
artikel |
7 |
Editorial Board
|
|
|
2014 |
42 |
C |
p. IFC- 1 p. |
artikel |
8 |
Formulation of shear strength of slender RC beams using gene expression programming, part I: Without shear reinforcement
|
Gandomi, Amir H. |
|
2014 |
42 |
C |
p. 112-121 10 p. |
artikel |
9 |
Framework for near real-time simulation of earthmoving projects using location tracking technologies
|
Vahdatikhaki, Faridaddin |
|
2014 |
42 |
C |
p. 50-67 18 p. |
artikel |
10 |
High-speed visualization of time-varying data in large-scale structural dynamic analyses with a GPU
|
Xu, Zhen |
|
2014 |
42 |
C |
p. 90-99 10 p. |
artikel |
11 |
Productive modeling for development of as-built BIM of existing indoor structures
|
Jung, Jaehoon |
|
2014 |
42 |
C |
p. 68-77 10 p. |
artikel |
12 |
Rapid and automated determination of rusted surface areas of a steel bridge for robotic maintenance systems
|
Son, Hyojoo |
|
2014 |
42 |
C |
p. 13-24 12 p. |
artikel |