nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Assessing reliability of design, construction, and safety related decisions
|
Simanaviciene, Ruta |
|
2014 |
39 |
C |
p. 47-58 12 p. |
artikel |
2 |
Automatic innovative truss design using grammatical evolution
|
Fenton, Michael |
|
2014 |
39 |
C |
p. 59-69 11 p. |
artikel |
3 |
Development and alpha testing of a cloud based automated fault detection and diagnosis tool for Air Handling Units
|
Bruton, Ken |
|
2014 |
39 |
C |
p. 70-83 14 p. |
artikel |
4 |
Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces
|
Moon, HyounSeok |
|
2014 |
39 |
C |
p. 93-105 13 p. |
artikel |
5 |
Digital and physical models for the validation of sustainable design strategies
|
Pignataro, Maria Annunziata |
|
2014 |
39 |
C |
p. 1-14 14 p. |
artikel |
6 |
Editorial Board
|
|
|
2014 |
39 |
C |
p. IFC- 1 p. |
artikel |
7 |
Image-based retrieval of concrete crack properties for bridge inspection
|
Adhikari, R.S. |
|
2014 |
39 |
C |
p. 180-194 15 p. |
artikel |
8 |
Integrated approach for older adult friendly home staircase architectural design
|
Afifi, Mona |
|
2014 |
39 |
C |
p. 117-125 9 p. |
artikel |
9 |
Intensified construction process control using information integration
|
Viljamaa, Esa |
|
2014 |
39 |
C |
p. 126-133 8 p. |
artikel |
10 |
Life cycle design and prefabrication in buildings: A review and case studies in Hong Kong
|
Jaillon, Lara |
|
2014 |
39 |
C |
p. 195-202 8 p. |
artikel |
11 |
Multi-objective decision-making supporting system of maintenance strategies for deteriorating reinforced concrete buildings
|
Chiu, Chen-Kuo |
|
2014 |
39 |
C |
p. 15-31 17 p. |
artikel |
12 |
Optimized acceleration of repetitive construction projects
|
Bakry, Ibrahim |
|
2014 |
39 |
C |
p. 145-151 7 p. |
artikel |
13 |
Preface
|
Maas, Ger J. |
|
2014 |
39 |
C |
p. 84- 1 p. |
artikel |
14 |
RFID indoor location identification for construction projects
|
Montaser, Ali |
|
2014 |
39 |
C |
p. 167-179 13 p. |
artikel |
15 |
Robotic tile placement: Tools, techniques and feasibility
|
King, Nathan |
|
2014 |
39 |
C |
p. 161-166 6 p. |
artikel |
16 |
Smart-BIM virtual prototype implementation
|
Heidari, Mohammadali |
|
2014 |
39 |
C |
p. 134-144 11 p. |
artikel |
17 |
Tele-operated service robots: ROSE
|
van Osch, Michiel |
|
2014 |
39 |
C |
p. 152-160 9 p. |
artikel |
18 |
The conditions for successful automated collaboration in construction
|
van Gassel, F.J.M. |
|
2014 |
39 |
C |
p. 85-92 8 p. |
artikel |
19 |
Towards a vision controlled robotic home environment
|
Georgoulas, Christos |
|
2014 |
39 |
C |
p. 106-116 11 p. |
artikel |
20 |
Users-orientated evaluation of building information model in the Chinese construction industry
|
Xu, Huier |
|
2014 |
39 |
C |
p. 32-46 15 p. |
artikel |