nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A feasibility study of using smartphone built-in accelerometers to detect fall portents
|
Dzeng, Ren-Jye |
|
2014 |
38 |
C |
p. 74-86 13 p. |
artikel |
2 |
Automated defect detection in sewer closed circuit television images using histograms of oriented gradients and support vector machine
|
Halfawy, Mahmoud R. |
|
2014 |
38 |
C |
p. 1-13 13 p. |
artikel |
3 |
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
|
Volk, Rebekka |
|
2014 |
38 |
C |
p. 109-127 19 p. |
artikel |
4 |
Construction site layout planning using multi-objective artificial bee colony algorithm with Levy flights
|
Yahya, M. |
|
2014 |
38 |
C |
p. 14-29 16 p. |
artikel |
5 |
Designing-in performance: A framework for evolutionary energy performance feedback in early stage design
|
Lin, Shih-Hsin Eve |
|
2014 |
38 |
C |
p. 59-73 15 p. |
artikel |
6 |
Editorial Board
|
|
|
2014 |
38 |
C |
p. IFC- 1 p. |
artikel |
7 |
Framework for the coordinated application of two different integrated project delivery platforms
|
Monteiro, André |
|
2014 |
38 |
C |
p. 87-99 13 p. |
artikel |
8 |
Improving the design and production data flow of a complex curvilinear geometric Glass Reinforced Concrete façade
|
Moya, Quim |
|
2014 |
38 |
C |
p. 46-58 13 p. |
artikel |
9 |
Optical flow techniques for estimation of camera motion parameters in sewer closed circuit television inspection videos
|
Halfawy, Mahmoud R. |
|
2014 |
38 |
C |
p. 39-45 7 p. |
artikel |
10 |
Predicting the maintenance cost of construction equipment: Comparison between general regression neural network and Box–Jenkins time series models
|
Yip, Hon-lun |
|
2014 |
38 |
C |
p. 30-38 9 p. |
artikel |
11 |
Research on energy saving control strategy of parallel hybrid loader
|
Zeng, Xiaohua |
|
2014 |
38 |
C |
p. 100-108 9 p. |
artikel |