nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Automated progress control using laser scanning technology
|
Zhang, Chengyi |
|
2013 |
36 |
C |
p. 108-116 9 p. |
artikel |
2 |
BIM implementation throughout the UK construction project lifecycle: An analysis
|
Eadie, Robert |
|
2013 |
36 |
C |
p. 145-151 7 p. |
artikel |
3 |
Computer simulation and analysis framework for floating caisson construction operations
|
Pantouvakis, John-Paris |
|
2013 |
36 |
C |
p. 196-207 12 p. |
artikel |
4 |
Computing 3D blind spots of construction equipment: Implementation and evaluation of an automated measurement and visualization method utilizing range point cloud data
|
Ray, Soumitry J. |
|
2013 |
36 |
C |
p. 95-107 13 p. |
artikel |
5 |
Creative construction
|
Jane, |
|
2013 |
36 |
C |
p. 179- 1 p. |
artikel |
6 |
Designing adapted visualization for collaborative 4D applications
|
Boton, Conrad |
|
2013 |
36 |
C |
p. 152-167 16 p. |
artikel |
7 |
Editorial Board
|
|
|
2013 |
36 |
C |
p. IFC- 1 p. |
artikel |
8 |
Enhanced function modeling for early assessment of conceptual innovative construction technologies
|
Yu, Wen-der |
|
2013 |
36 |
C |
p. 180-190 11 p. |
artikel |
9 |
Evaluation of user interaction with daylighting simulation in a tangible user interface
|
Nasman, Joshua |
|
2013 |
36 |
C |
p. 117-127 11 p. |
artikel |
10 |
Extending automation of building construction — Survey on potential sensor technologies and robotic applications
|
Vähä, Pentti |
|
2013 |
36 |
C |
p. 168-178 11 p. |
artikel |
11 |
Low-cost aerial unit for outdoor inspection of building façades
|
Roca, D. |
|
2013 |
36 |
C |
p. 128-135 8 p. |
artikel |
12 |
Maintaining style of garden designs by using graph-based constraints
|
Ślusarczyk, G. |
|
2013 |
36 |
C |
p. 79-94 16 p. |
artikel |
13 |
Mobile passive Radio Frequency Identification (RFID) portal for automated and rapid control of Personal Protective Equipment (PPE) on construction sites
|
Kelm, Agnes |
|
2013 |
36 |
C |
p. 38-52 15 p. |
artikel |
14 |
Modeling relational transaction and relationship quality among team members in public projects in Hong Kong
|
Ling, Florence Y.Y. |
|
2013 |
36 |
C |
p. 16-24 9 p. |
artikel |
15 |
Numerical modeling of concrete strength under multiaxial confinement pressures using linear genetic programming
|
Babanajad, Saeed K. |
|
2013 |
36 |
C |
p. 136-144 9 p. |
artikel |
16 |
Performance of global optimization models for dynamic site layout planning of construction projects
|
Said, Hisham |
|
2013 |
36 |
C |
p. 71-78 8 p. |
artikel |
17 |
Prediction of the learning curve in roof insulation
|
Mályusz, Levente |
|
2013 |
36 |
C |
p. 191-195 5 p. |
artikel |
18 |
PSO-based Elman neural network model for predictive control of air chamber pressure in slurry shield tunneling under Yangtze River
|
Zhou, C. |
|
2013 |
36 |
C |
p. 208-217 10 p. |
artikel |
19 |
Real-time drill monitoring and control using building information models augmented with 3D imaging data
|
Akula, Manu |
|
2013 |
36 |
C |
p. 1-15 15 p. |
artikel |
20 |
Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things
|
Ding, L.Y. |
|
2013 |
36 |
C |
p. 25-37 13 p. |
artikel |
21 |
Use-phase memory: A tool for the sustainable construction and renovation of residential buildings
|
Picon, Lucile |
|
2013 |
36 |
C |
p. 53-70 18 p. |
artikel |