nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A diagnostic logic for preventing structural failure in concrete displacing booms
|
Cazzulani, G. |
|
2013 |
35 |
C |
p. 499-506 8 p. |
artikel |
2 |
A framework for an automated and integrated project scheduling and management system
|
Chen, Shih-Ming |
|
2013 |
35 |
C |
p. 89-110 22 p. |
artikel |
3 |
A general indirect representation for optimization of generative design systems by genetic algorithms: Application to a shape grammar-based design system
|
Granadeiro, Vasco |
|
2013 |
35 |
C |
p. 374-382 9 p. |
artikel |
4 |
A hybrid approach for the analysis and prediction of elevator passenger flow in an office building
|
Ding, Bao |
|
2013 |
35 |
C |
p. 69-78 10 p. |
artikel |
5 |
A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects
|
Dong, Ning |
|
2013 |
35 |
C |
p. 157-173 17 p. |
artikel |
6 |
An approach to the multi-level space allocation problem in architecture using a hybrid evolutionary technique
|
Rodrigues, Eugénio |
|
2013 |
35 |
C |
p. 482-498 17 p. |
artikel |
7 |
An integrated approach to BIM competency assessment, acquisition and application
|
Succar, Bilal |
|
2013 |
35 |
C |
p. 174-189 16 p. |
artikel |
8 |
An intelligent authoring model for subsidiary legislation and regulatory instrument drafting within construction and engineering industry
|
McGibbney, Lewis John |
|
2013 |
35 |
C |
p. 121-130 10 p. |
artikel |
9 |
An optimal algorithm of the multi-lifting operating simulation for super-tall building construction
|
Cho, Chang-Yeon |
|
2013 |
35 |
C |
p. 595-607 13 p. |
artikel |
10 |
Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints
|
Li, Heng |
|
2013 |
35 |
C |
p. 431-438 8 p. |
artikel |
11 |
Applications of computer vision on tile alignment inspection
|
Lin, Kuo-Liang |
|
2013 |
35 |
C |
p. 562-567 6 p. |
artikel |
12 |
Architecture of an open knowledge base for sustainable buildings based on Linked Data technologies
|
König, Matija |
|
2013 |
35 |
C |
p. 542-550 9 p. |
artikel |
13 |
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
|
Monteiro, André |
|
2013 |
35 |
C |
p. 238-253 16 p. |
artikel |
14 |
Automated construction sequencing and scheduling from functional requirements
|
Chua, David K.H. |
|
2013 |
35 |
C |
p. 79-88 10 p. |
artikel |
15 |
Automated generation of structural solutions based on spatial designs
|
Davila Delgado, J.M. |
|
2013 |
35 |
C |
p. 528-541 14 p. |
artikel |
16 |
A vision-based motion capture and recognition framework for behavior-based safety management
|
Han, SangUk |
|
2013 |
35 |
C |
p. 131-141 11 p. |
artikel |
17 |
Benchmarking model for the ongoing commissioning of the refrigeration systemof an indoor ice rink
|
Teyssedou, Gabriel |
|
2013 |
35 |
C |
p. 229-237 9 p. |
artikel |
18 |
Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation
|
Chou, Jui-Sheng |
|
2013 |
35 |
C |
p. 517-527 11 p. |
artikel |
19 |
Contractor financial prequalification using simulation method based on cash flow model
|
Huang, Wen-Haw |
|
2013 |
35 |
C |
p. 254-262 9 p. |
artikel |
20 |
Customer interactive building information modeling for apartment unit design
|
Lee, Soyeon |
|
2013 |
35 |
C |
p. 424-430 7 p. |
artikel |
21 |
4D CAD model updating using image processing-based construction progress monitoring
|
Kim, Changyoon |
|
2013 |
35 |
C |
p. 44-52 9 p. |
artikel |
22 |
Decision support model for one-way floor slab design: A sustainable approach
|
Fernandez-Ceniceros, J. |
|
2013 |
35 |
C |
p. 460-470 11 p. |
artikel |
23 |
Design of a construction management data visualization environment: A bottom-up approach
|
Chiu, Chao-Ying |
|
2013 |
35 |
C |
p. 353-373 21 p. |
artikel |
24 |
Developing a fuzzy model based on subtractive clustering for road header performance prediction
|
Yazdani-Chamzini, Abdolreza |
|
2013 |
35 |
C |
p. 111-120 10 p. |
artikel |
25 |
Development of optimized point cloud merging algorithms for accurate processing to create earthwork site models
|
Kwon, Soonwook |
|
2013 |
35 |
C |
p. 618-624 7 p. |
artikel |
26 |
Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data
|
Anil, Engin Burak |
|
2013 |
35 |
C |
p. 507-516 10 p. |
artikel |
27 |
Documentation errors in instrumentation and electrical systems: Toward productivity improvement using System Information Modeling
|
Love, Peter E.D. |
|
2013 |
35 |
C |
p. 448-459 12 p. |
artikel |
28 |
Dynamically optimal trajectories for earthmoving excavators
|
Kim, Young Bum |
|
2013 |
35 |
C |
p. 568-578 11 p. |
artikel |
29 |
Editorial Board
|
|
|
2013 |
35 |
C |
p. IFC- 1 p. |
artikel |
30 |
Effects of the application of activity calendars on the distribution of project duration in PERT networks
|
Hajdu, Miklós |
|
2013 |
35 |
C |
p. 397-404 8 p. |
artikel |
31 |
Feasibility study of fuel cell-hybrid powertrains in non-road mobile machineries
|
Liukkonen, Matti |
|
2013 |
35 |
C |
p. 296-305 10 p. |
artikel |
32 |
Forklift with a lithium-titanate battery during a lifting/lowering cycle: Analysis of the recuperation capability
|
Minav, T.A. |
|
2013 |
35 |
C |
p. 275-284 10 p. |
artikel |
33 |
From justification to evaluation: Building information modeling for asset owners
|
Love, Peter E.D. |
|
2013 |
35 |
C |
p. 208-216 9 p. |
artikel |
34 |
Fully automated registration of 3D data to a 3D CAD model for project progress monitoring
|
Kim, Changmin |
|
2013 |
35 |
C |
p. 587-594 8 p. |
artikel |
35 |
Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology
|
Kim, Hyunjoo |
|
2013 |
35 |
C |
p. 285-295 11 p. |
artikel |
36 |
Hybrid intelligence approach based on LS-SVM and Differential Evolution for construction cost index estimation: A Taiwan case study
|
Cheng, Min-Yuan |
|
2013 |
35 |
C |
p. 306-313 8 p. |
artikel |
37 |
Influence of training schedule on development of perceptual–motor control skills for construction equipment operators in a virtual training system
|
Su, Xing |
|
2013 |
35 |
C |
p. 439-447 9 p. |
artikel |
38 |
Installation of heavy duty glass using an intuitive manipulation device
|
Gil, Myeong-Su |
|
2013 |
35 |
C |
p. 579-586 8 p. |
artikel |
39 |
Interactive expert support for early stage full-year daylighting design: A user's perspective on Lightsolve
|
Andersen, Marilyne |
|
2013 |
35 |
C |
p. 338-352 15 p. |
artikel |
40 |
IT based system for construction safety management and monitoring: C-RTICS2
|
Aguilar, Gustavo E. |
|
2013 |
35 |
C |
p. 217-228 12 p. |
artikel |
41 |
Knowledge-based Decision Support System Quality Function Deployment (KBDSS-QFD) tool for assessment of building envelopes
|
Singhaputtangkul, Natee |
|
2013 |
35 |
C |
p. 314-328 15 p. |
artikel |
42 |
Location tracking and data visualization technology to advance construction ironworkers' education and training in safety and productivity
|
Teizer, Jochen |
|
2013 |
35 |
C |
p. 53-68 16 p. |
artikel |
43 |
Multi-agent simulation of the dynamic evolutionary process in Chinese urban housing market based on the GIS: The case of Beijing
|
Zhang, Hong |
|
2013 |
35 |
C |
p. 190-198 9 p. |
artikel |
44 |
On-site construction management using mobile computing technology
|
Kim, Changyoon |
|
2013 |
35 |
C |
p. 415-423 9 p. |
artikel |
45 |
Physics engine-driven visualization of deactivated elements and its application in bridge collapse simulation
|
Xu, Zhen |
|
2013 |
35 |
C |
p. 471-481 11 p. |
artikel |
46 |
Prediction of WSN placement for bridge health monitoring based on material characteristics
|
Bae, Sun-Chan |
|
2013 |
35 |
C |
p. 18-27 10 p. |
artikel |
47 |
Preface
|
Kwon, Soonwook |
|
2013 |
35 |
C |
p. 561- 1 p. |
artikel |
48 |
Procedural modeling in architecture based on statistical and fuzzy inference
|
Tepavčević, Bojan |
|
2013 |
35 |
C |
p. 329-337 9 p. |
artikel |
49 |
Quantitative scaling evaluation of concrete structures based on terrestrial laser scanning
|
Mizoguchi, Tomohiro |
|
2013 |
35 |
C |
p. 263-274 12 p. |
artikel |
50 |
Requirements for BIM platforms in the concrete reinforcement supply chain
|
Aram, Shiva |
|
2013 |
35 |
C |
p. 1-17 17 p. |
artikel |
51 |
RFID tracking implementation model for the technical trade and construction supply chains
|
Hinkka, Ville |
|
2013 |
35 |
C |
p. 405-414 10 p. |
artikel |
52 |
Skeleton-based 3D reconstruction of as-built pipelines from laser-scan data
|
Lee, Joohyuk |
|
2013 |
35 |
C |
p. 199-207 9 p. |
artikel |
53 |
Uncertainty in developing supervisory demand-side controls in buildings: A framework and guidance
|
Kim, Sean Hay |
|
2013 |
35 |
C |
p. 28-43 16 p. |
artikel |
54 |
Using an interactive schedule simulation platform to assess and improve contingency management strategies
|
Tang, Pei |
|
2013 |
35 |
C |
p. 551-560 10 p. |
artikel |
55 |
Value of IT: Indirect impact of IT on construction project performance via Best Practices
|
Kang, Youngcheol |
|
2013 |
35 |
C |
p. 383-396 14 p. |
artikel |
56 |
Visual Req calculation tool for green building evaluation in Taiwan
|
Wu, I-Chen |
|
2013 |
35 |
C |
p. 608-617 10 p. |
artikel |
57 |
Web-based construction waste estimation system for building construction projects
|
Li, Yashuai |
|
2013 |
35 |
C |
p. 142-156 15 p. |
artikel |