nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A knowledge-based framework for automated space-use analysis
|
Kim, Tae Wan |
|
2013 |
32 |
C |
p. 165-176 12 p. |
artikel |
2 |
Architecture, computing, and design assistance
|
Bhatt, Mehul |
|
2013 |
32 |
C |
p. 161-164 4 p. |
artikel |
3 |
A study on the benefits of augmented reality in retaining working memory in assembly tasks: A focus on differences in gender
|
Hou, Lei |
|
2013 |
32 |
C |
p. 38-45 8 p. |
artikel |
4 |
Augmented Reality in built environment: Classification and implications for future research
|
Wang, Xiangyu |
|
2013 |
32 |
C |
p. 1-13 13 p. |
artikel |
5 |
Automated 2D detection of construction equipment and workers from site video streams using histograms of oriented gradients and colors
|
Memarzadeh, Milad |
|
2013 |
32 |
C |
p. 24-37 14 p. |
artikel |
6 |
Automatic design quality evaluation using graph similarity measures
|
Strug, B. |
|
2013 |
32 |
C |
p. 187-195 9 p. |
artikel |
7 |
Building envelope shape design in early stages of the design process: Integrating architectural design systems and energy simulation
|
Granadeiro, Vasco |
|
2013 |
32 |
C |
p. 196-209 14 p. |
artikel |
8 |
Contents Continued
|
|
|
2013 |
32 |
C |
p. III- 1 p. |
artikel |
9 |
Cost–safety trade-off in unequal-area construction site layout planning
|
Ning, Xin |
|
2013 |
32 |
C |
p. 96-103 8 p. |
artikel |
10 |
Development of a prototype deployable bridge based on origami skill
|
Ario, Ichiro |
|
2013 |
32 |
C |
p. 104-111 8 p. |
artikel |
11 |
Development of CDPM matrix for the measurement of collaborative design performance in construction
|
Ren, Z. |
|
2013 |
32 |
C |
p. 14-23 10 p. |
artikel |
12 |
Editorial Board
|
|
|
2013 |
32 |
C |
p. IFC- 1 p. |
artikel |
13 |
Flexible optimum design of a bracing system for façade design using multiobjective Genetic Algorithms
|
Richardson, James N. |
|
2013 |
32 |
C |
p. 80-87 8 p. |
artikel |
14 |
Intelligent mobile assistant for spatial design support
|
Będkowski, Janusz |
|
2013 |
32 |
C |
p. 177-186 10 p. |
artikel |
15 |
Job planning and supervisory control for automated earthmoving using 3D graphical tools
|
Halbach, Eric |
|
2013 |
32 |
C |
p. 145-160 16 p. |
artikel |
16 |
Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction
|
Park, Moonseo |
|
2013 |
32 |
C |
p. 88-95 8 p. |
artikel |
17 |
Performance-driven architectural design and optimization technique from a perspective of architects
|
Shi, Xing |
|
2013 |
32 |
C |
p. 125-135 11 p. |
artikel |
18 |
Robot-based construction automation: An application to steel beam assembly (Part I)
|
Chu, Baeksuk |
|
2013 |
32 |
C |
p. 46-61 16 p. |
artikel |
19 |
Robot-based construction automation: An application to steel beam assembly (Part II)
|
Jung, Kyoungmo |
|
2013 |
32 |
C |
p. 62-79 18 p. |
artikel |
20 |
The User Pre-Occupancy Evaluation Method in designer–client communication in early design stage: A case study
|
Shen, Weilin |
|
2013 |
32 |
C |
p. 112-124 13 p. |
artikel |
21 |
Using 4D CAD to visualize the impacts of highway construction on the public
|
Zanen, P.P.A. |
|
2013 |
32 |
C |
p. 136-144 9 p. |
artikel |