nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
|
Song, Lingguang |
|
2012 |
27 |
C |
p. 32-39 8 p. |
artikel |
2 |
Advanced linear scheduling program with varying production rates for pipeline construction projects
|
Duffy, Greg |
|
2012 |
27 |
C |
p. 99-110 12 p. |
artikel |
3 |
A self-evolutionary model for automated innovation of construction technologies
|
Yu, Wen-der |
|
2012 |
27 |
C |
p. 78-88 11 p. |
artikel |
4 |
Automation of thermographic 3D modelling through image fusion and image matching techniques
|
Lagüela, S. |
|
2012 |
27 |
C |
p. 24-31 8 p. |
artikel |
5 |
Construction hoist security application for tall building construction in wireless networks
|
Yang, Guangxiang |
|
2012 |
27 |
C |
p. 147-154 8 p. |
artikel |
6 |
Early stage multi-level cost estimation for schematic BIM models
|
Cheung, Franco K.T. |
|
2012 |
27 |
C |
p. 67-77 11 p. |
artikel |
7 |
Editorial Board
|
|
|
2012 |
27 |
C |
p. IFC- 1 p. |
artikel |
8 |
Evaluating innovation diffusion readiness among architectural and engineering design firms: Empirical evidence from Australia
|
Panuwatwanich, Kriengsak |
|
2012 |
27 |
C |
p. 50-59 10 p. |
artikel |
9 |
GIS-based dynamic construction site material layout evaluation for building renovation projects
|
Su, Xing |
|
2012 |
27 |
C |
p. 40-49 10 p. |
artikel |
10 |
Human–robot–environment interaction interface for robotic grit-blasting of complex steel bridges
|
Chotiprayanakul, P. |
|
2012 |
27 |
C |
p. 11-23 13 p. |
artikel |
11 |
Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splitting
|
Alsayegh, Hadeel |
|
2012 |
27 |
C |
p. 89-98 10 p. |
artikel |
12 |
Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables
|
Son, Hyojoo |
|
2012 |
27 |
C |
p. 60-66 7 p. |
artikel |
13 |
Integrating field data and 3D simulation for tower crane activity monitoring and alarming
|
Li, Yanming |
|
2012 |
27 |
C |
p. 111-119 9 p. |
artikel |
14 |
Modeling and analysis of thrust force for EPB shield tunneling machine
|
Wang, Lintao |
|
2012 |
27 |
C |
p. 138-146 9 p. |
artikel |
15 |
Multi-Objective Dynamic Construction Site Layout Planning in Fuzzy Random Environment
|
Xu, Jiuping |
|
2012 |
27 |
C |
p. 155-169 15 p. |
artikel |
16 |
Safety risk identification system for metro construction on the basis of construction drawings
|
Ding, L.Y. |
|
2012 |
27 |
C |
p. 120-137 18 p. |
artikel |
17 |
Using the National Digital Forecast Database for model-based building controls
|
Kim, Sean Hay |
|
2012 |
27 |
C |
p. 170-182 13 p. |
artikel |
18 |
Virtual prototyping for planning bridge construction
|
Li, Heng |
|
2012 |
27 |
C |
p. 1-10 10 p. |
artikel |