nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A decision support system for contractor prequalification for surety bonding
|
Awad, Adel |
|
|
21 |
C |
p. 89-98 |
artikel |
2 |
A domain specific software model for interior architectural education and practice
|
Şenyapılı, Burcu |
|
|
21 |
C |
p. 10-23 |
artikel |
3 |
A model for concurrent maintenance of bridge elements
|
Huang, Ying-Hua |
|
|
21 |
C |
p. 74-80 |
artikel |
4 |
A model for RFID-based 3D location of buried assets
|
Kumar, Bimal |
|
|
21 |
C |
p. 121-131 |
artikel |
5 |
Analysis of field applicability of the rotation-controllable tower-crane hook block
|
Lee, Chijoo |
|
|
21 |
C |
p. 81-88 |
artikel |
6 |
Automated post-simulation visualization of modular building production assembly line
|
Han, Sang Hyeok |
|
|
21 |
C |
p. 229-236 |
artikel |
7 |
Building Information Modeling-based user activity simulation and evaluation method for improving designer–user communications
|
Shen, Weilin |
|
|
21 |
C |
p. 148-160 |
artikel |
8 |
Calendar
|
|
|
|
21 |
C |
p. 269 |
artikel |
9 |
Cradle molding device: An automated CAD/CAM molding system for manufacturing composite materials as customizable assembly units for rural application
|
Griffith, K. |
|
|
21 |
C |
p. 114-120 |
artikel |
10 |
Decision support model for incentives/disincentives time–cost tradeoff
|
Choi, Kunhee |
|
|
21 |
C |
p. 219-228 |
artikel |
11 |
Development of a wireless sensor network system for suspension bridge health monitoring
|
Chae, M.J. |
|
|
21 |
C |
p. 237-252 |
artikel |
12 |
Developments in construction-scale additive manufacturing processes
|
Lim, S. |
|
|
21 |
C |
p. 262-268 |
artikel |
13 |
Editorial Board
|
|
|
|
21 |
C |
p. IFC |
artikel |
14 |
Evolutionary fuzzy hybrid neural network for dynamic project success assessment in construction industry
|
Cheng, Min-Yuan |
|
|
21 |
C |
p. 46-51 |
artikel |
15 |
Evolution of the i-Booth© onsite information management kiosk
|
Ruwanpura, J.Y. |
|
|
21 |
C |
p. 52-63 |
artikel |
16 |
GA optimization model for repetitive projects with soft logic
|
Fan, Su-Ling |
|
|
21 |
C |
p. 253-261 |
artikel |
17 |
Heterogeneous multi-configurable chained microrobot for the exploration of small cavities
|
Brunete, A. |
|
|
21 |
C |
p. 184-198 |
artikel |
18 |
Imaged-based verification of as-built documentation of operational buildings
|
Klein, Laura |
|
|
21 |
C |
p. 161-171 |
artikel |
19 |
Improving laser image resolution for pitting corrosion measurement using Markov random field method
|
Wu, Wei |
|
|
21 |
C |
p. 172-183 |
artikel |
20 |
Integral control system of indoor environment in continuously occupied spaces
|
Košir, Mitja |
|
|
21 |
C |
p. 199-209 |
artikel |
21 |
Intelligent navigation strategies for an automated earthwork system
|
Kim, Sung-Keun |
|
|
21 |
C |
p. 132-147 |
artikel |
22 |
IT supported collaborative work in A/E/C projects: A ten-year review
|
Xue, Xiaolong |
|
|
21 |
C |
p. 1-9 |
artikel |
23 |
KM-oriented business process reengineering for construction firms
|
Cheng, Min-Yuan |
|
|
21 |
C |
p. 32-45 |
artikel |
24 |
Multi-treatment capacitated arc routing of construction machinery in Taiwan's smooth road project
|
Huang, Shan-Huen |
|
|
21 |
C |
p. 210-218 |
artikel |
25 |
Robust adaptive flow line detection in sewer pipes
|
Kirstein, Simon |
|
|
21 |
C |
p. 24-31 |
artikel |
26 |
Simulation and analytical techniques for construction resource planning and scheduling
|
Chen, Shih-Ming |
|
|
21 |
C |
p. 99-113 |
artikel |
27 |
Using nD technology to develop an integrated construction management system for city rail transit construction
|
Ding, L.Y. |
|
|
21 |
C |
p. 64-73 |
artikel |