nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A 3D surface modeling system for intelligent excavation system
|
Chae, Myung Jin |
|
2011 |
20 |
7 |
p. 808-817 10 p. |
artikel |
2 |
A framework for using mobile computing for information management on construction sites
|
Chen, Yuan |
|
2011 |
20 |
7 |
p. 776-788 13 p. |
artikel |
3 |
Application of neural networks for detecting erroneous tax reports from construction companies
|
Chen, Jieh-Haur |
|
2011 |
20 |
7 |
p. 935-939 5 p. |
artikel |
4 |
Calendar
|
|
|
2011 |
20 |
7 |
p. 998- 1 p. |
artikel |
5 |
Changes and change management in construction and IT projects
|
Bröchner, Jan |
|
2011 |
20 |
7 |
p. 767-775 9 p. |
artikel |
6 |
Comparative study of vision tracking methods for tracking of construction site resources
|
Park, Man-Woo |
|
2011 |
20 |
7 |
p. 905-915 11 p. |
artikel |
7 |
Computer simulation of complex-shaped formworks using three-dimensional numerical models
|
Gallego, E. |
|
2011 |
20 |
7 |
p. 830-836 7 p. |
artikel |
8 |
Editorial Board
|
|
|
2011 |
20 |
7 |
p. IFC- 1 p. |
artikel |
9 |
Fusion of redundant measurements for enhancing the reliability of total cooling load based chiller sequencing control
|
Huang, Gongsheng |
|
2011 |
20 |
7 |
p. 789-798 10 p. |
artikel |
10 |
Integrated visualized time control system for repetitive construction projects
|
Elbeltagi, Emad |
|
2011 |
20 |
7 |
p. 940-953 14 p. |
artikel |
11 |
Internal relationship modeling and production planning optimization for the manufactured housing
|
Jeong, Jae G. |
|
2011 |
20 |
7 |
p. 864-873 10 p. |
artikel |
12 |
Knowledge and reasoning in design systems
|
Grabska, E. |
|
2011 |
20 |
7 |
p. 927-934 8 p. |
artikel |
13 |
Modeling, simulation and emulation of Intelligent Domotic Environments
|
Bonino, Dario |
|
2011 |
20 |
7 |
p. 967-981 15 p. |
artikel |
14 |
Modularization and assembly algorithm for efficient MEP construction
|
Tserng, H. Ping |
|
2011 |
20 |
7 |
p. 837-863 27 p. |
artikel |
15 |
Multi-layered assessment of emerging internet based business for construction product information
|
Lee, Ung-Kyun |
|
2011 |
20 |
7 |
p. 896-904 9 p. |
artikel |
16 |
Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio
|
Elazouni, Ashraf |
|
2011 |
20 |
7 |
p. 755-766 12 p. |
artikel |
17 |
Nondestructive identification of delaminations in concrete floor toppings with acoustic methods
|
Hola, Jerzy |
|
2011 |
20 |
7 |
p. 799-807 9 p. |
artikel |
18 |
Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm
|
Choi, Yosoon |
|
2011 |
20 |
7 |
p. 982-997 16 p. |
artikel |
19 |
Progressive 3D reconstruction of infrastructure with videogrammetry
|
Brilakis, Ioannis |
|
2011 |
20 |
7 |
p. 884-895 12 p. |
artikel |
20 |
Repertory grid technique in the development of Tacit-based Decision Support System (TDSS) for sustainable site layout planning
|
Abdul-Rahman, Hamzah |
|
2011 |
20 |
7 |
p. 818-829 12 p. |
artikel |
21 |
Simulations and analyses of arched brick structures
|
Bednarz, Łukasz |
|
2011 |
20 |
7 |
p. 741-754 14 p. |
artikel |
22 |
Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance
|
Yang, I-Tung |
|
2011 |
20 |
7 |
p. 916-926 11 p. |
artikel |
23 |
Task planner design for an automated excavation system
|
Seo, Jongwon |
|
2011 |
20 |
7 |
p. 954-966 13 p. |
artikel |
24 |
Visual retrieval of concrete crack properties for automated post-earthquake structural safety evaluation
|
Zhu, Zhenhua |
|
2011 |
20 |
7 |
p. 874-883 10 p. |
artikel |